1 METHOD STATEMENT OF CONDUIT (PVC & GI), WIRE LAYING

WITH FIXING OF SWITCH BOX AND LIGHT FITTINGS

CONDUITS LAYING ON WALL AND PEB BUILDING STRUCTURE (MAX. HEIGHT 14 MTR AT GIS HALL)

This Method Statement describes the specific safe working methods which will be used to carry out the
described work. It gives details of work procedure with control measures to counter health and safety
issues related to this work. The listed content of this Method Statement cannot be changed/ modified
subjected to job scope/customer specifications without the prior permission of Safety co-ordinator and
Project Manager. But task specific method statement once finalized & approved, that should not be
modified during work execution.

Project Name 400/220/132 kV POWERGRID SUBSTATION.


Site /Location PGCIL Malda.

Planned schedule of Activity 07-07-2023 to 06-01-2024


Method Statement No. MS/PGCIL/MALDA /S&W/13 Rev-00
Risk Assessment Ref. No. Rev-00
RA/PGCIL/MALDA /S&W/13
Title: - Conduits Laying on wall & PEB Building structure(Max. height 14meters at GIS Hall)

Scope of work: - Handling & Storage, laying, installation of conduit & PVC wires laying at PGCIL Malda project.

Location: - GIS Hall, CRP Room, ACDB Room and AHU Room.
Drawing References:- DRG. NO. - K2020T&DSS001A-01-DRG-037, REV-03 dated 1.06.23
Detail of Sub contractors Involved :- Satyanarayan Enterprises.
Signature Date
Method Statement

Prepared By:
Mr. Chandan Kumar- (Asst Manager) Electrical.
Mr. Neeraj joshi (HSE Officer)
Reviewed By: -
Mr. Susanta Bemal – HSE Manager
Approved By:-
Mr. Ravi Murugesan- Head, HSE – Domestic &
International Transmission & Distribution

CONTACT NUMBER OF STAFF:


Name of staff Designation Contact Number
Mr. Ravi Murugesan Head, HSE. 9952005534
Mr. Subhajit Kar Projects Manager. 9800786738
Mr. Susanta Bemal HSE Manager. 9600070140
Mr. Chandan Kumar Asst. Manager- Projects. 8585898139
Mr. Neeraj Joshi Site Safety Officer. 9570701061

1
2 METHOD STATEMENT OF CONDUIT (PVC & GI), WIRE LAYING
WITH FIXING OF SWITCH BOX AND LIGHT FITTINGS

Sl No Activity. Details of Job Risk Involved Control Checks.


Sequence.
1 Installation of A)Materials shifting & Slip trip of Activity shall be carried out only
Conduit, laying of Storing at work manpower and fall under the supervision of site
wire with switch location from stores - of material. engineer / supervisor.
box and light Manually Use of hand gloves during material
fixing. lifting & shifting.
Remove all obstacles from pathway.
Do not carry overload & ensure use
of shoulder pad during material
shifting on shoulder.
Area must be barricade near stored
material.
Stopper must be ensured to avoid
rolling of the GI Conduit material.
Back injury Maximum load permitted for
manual handling by a person is
25kg only as per COP on manual
handling
Manual material handling training
to be provided for workers engaged
for manual shifting activity.
B) Wall Drilling for Electric Shock. All electrical connection shall be
saddle fixing Conduit done by authorized electrician only.
support & fitting of Ensure the all power supply
switch box and other through ELCB/ RCCB (30 mA) and
accessories by portable all power cable should be double
power tool. insulated and overhead.
ELCB Tripping sensitivity to be
checked before undertaking drilling
work.
Job Specific training program to be
conducted by site team. TBT to be
given by site team before start of
work at job location.
Drilling / chipping machine should
be inspected jointly by Electrical &
HSE engineer.
Ensure portable power supply cord
is healthy and free from joints.
Eye injury. Provide safety goggles.

Exposing to Noise Provide ear plug / muff.

2
3 METHOD STATEMENT OF CONDUIT (PVC & GI), WIRE LAYING
WITH FIXING OF SWITCH BOX AND LIGHT FITTINGS

Ensure lifeline through pp/ Nylon


Fall of workmen rope while working inside GIS hall.
Double Lanyard & Full body
harness must be used & check for
any cut, abrasion, burn, damage,
before taking in use while working
at height.
Use of anti-skid safety shoes and
other mandatory PPE’s.
Access & egress to be checked for
obstacles before starting of the
work.
Ladder shall be placed at a slope of
1:4 and extended rungs will be tied
with landing platform.
Ladder shall be provided for safe
access on working platform.
Periodical checks for ladder will be
conducted by Safety Officer.
Ensure 3-point contact while
ascending & descending from the
ladder.
Ensure work area is having proper
illumination.
Ensure use of tool box for storing
power and hand tools while working
overhead at height.
Ensure all nearby cable trench
inside CRP ROOM and GIS HALL
must be covered to avoid any
accidental approach of workmen.
Fall of Material. Ensure no materials shall be carried
while using ladder.
Ensure the working area
barricaded by caution tape and
display the signage board.
Ensure no other activities are executed
below overhead height work area.
Ensure tool lanyard for hand tools to
prevent accidental fall.