PMT/Contractor JSA Form - 1/12/2008
1 Obtain work permit 1.1 Lack of hazard 1.1.1 The issuer shall approve and issue a permit only after conducting CAT WPR / SA
awareness a joint site inspection with the receiver to identify potential hazards, Issuer
perform necessary gas tests, and write on the work permit the
specific precautions necessary so the work can be performed
safely.
1.2 COVID-19 infection and 1.2.1 Temperature screening shall be conducted for all employees CAT Mgmt. / WPR /
transmission before leaving the camp and going to sites and before entering the SA Issuer
camp after the work.
1.2.2 Maintaining a physical distance of at least one (1) meter from other
individuals.
1.2.3 Maintaining one (1) seat apart arrangement while travelling with
the bus.
1.2.4 Hand wash stations and sanitizer dispensers provided at site.
1.2.5 Performing hand hygiene frequently with an alcohol-based hand
rub if available and if your hands are not visibly dirty or with soap
and water if hands are dirty.
1.2.6 Employees were encouraged to avoid touching their eyes, nose,
and mouth.
1.2.7 Practicing respiratory hygiene by coughing or sneezing into a bent
elbow or tissue and then immediately disposing of the tissue.
1.2.8 Use appropriate PPEs like face mask and gloves.
1.2.9 Checklist for COVID-19 Symptoms for each employee were being
taken.
1.2.10 All employees found with related symptoms were immediately,
reported to Site Male Nurse or Camp Clinic for immediate isolation
and further medical management.
2 Cutting, grinding, and welding of 2.1 Fire 2.1.1 Ensure that lines and equipment containing or have a potential of CAT Engineer /
pipe using: H2S, or combustible gas is covered with fire blanket and sprayed Supervisor /
with water prior to welding. Foreman /
Welding machine 2.1.2 Ensure that there is water tanker standby in the area and ready to Firewatch / HSE
Compressed gas cylinder use Officer / WPR
Power tools 2.1.3 Combustible material around the work area shall be removed. This
Hand tools includes combustible material below an elevated welding or cutting
work area.
2.1.4 Gas cylinder valves shall be kept closed when unattended
Page 2 of 9
PMT/Contractor JSA Form - 1/12/2008
work area, tagged, and moved to a safe area. It shall be returned Mechanical crew /
to the supplier when safe to do so. HSE Officer / WPR
2.4.3 Cylinders, valves, regulators, gauges, fittings, and hoses shall be
inspected for damage and leaks (e.g., soapy water) prior to use.
2.4.4 Hoses shall be protected from potential damage during operations.
2.5 Electrocution from the 2.5.1 Generator shall be grounded before use. CAT Engineer /
generators/welding 2.5.2 Portable electric power tools shall be rated for use at a voltage not Supervisor /
machines exceeding 240 V. Foreman /
2.5.3 Residual current devices (RCDs), including ground fault circuit Mechanical crew /
breakers (GFCIs) and earth leak current breakers (ELCBs), shall HSE Officer / WPR
be used for all 110/220 V portable electric power tools.
2.5.4 Direct current (DC) shall be used for welding operations in any
situation when the effect of electric shock is likely to be extreme.
2.5.5 Manual electrode holders shall be specifically designed for arc
welding and have a capacity capable of handling the maximum
rated current required by the electrodes.
2.5.6 Any current-carrying parts of the electrode holder which a welder
has in his hand (and the outer surfaces of the jaws of the electrode
holder) shall be fully insulated to protect against the maximum
voltage to ground.
2.5.7 Electrode holders shall be constructed to accommodate all sizes
of electrodes.
2.5.8 The frames of all electrical arc welding machines shall be properly
grounded.
2.5.9 Ground returns shall be securely attached by cable lugs, clamps
or bolts to the material being welded upon.
2.5.10 Ground returns shall be connected as close as possible to the
location being welded upon to avoid stray currents.
2.5.11 When the structure or nonhazardous piping being welded is used
as a ground return circuit, it shall be ensured that electrical
conductivity to ground exists in the structure or piping.
2.5.12 Splices are not allowed anywhere in welding cables.
2.5.13 Welding cables shall be continuous for a minimum distance of 3 m
(10 ft) from the end to which the electrode holder is connected.
2.5.14 If a welding cable becomes damaged beyond 3 m (10 ft) from the
end to which the electrode holder is connected, it shall be repaired
using a standard plug-and-socket coupling.
2.5.15 Welding cables shall be regularly inspected for cuts or abrasions
to the insulation. Damaged cables shall be removed from service.
2.5.16 Temporary repairs are prohibited.
2.5.17 When feasible, welding cables shall be elevated or protected by
Page 4 of 9
PMT/Contractor JSA Form - 1/12/2008
Page 5 of 9
PMT/Contractor JSA Form - 1/12/2008
spools, valves, spectacles, and by equipment the crane type/model they are using. Supervisor /
flanges using: 3.1.2 Crane lift areas shall be barricaded, and warning signs shall be Foreman / Operator
posted. / HSE Officer /
Crane 3.1.3 Only authorized personnel shall be permitted inside the barricaded WPR
Hand tools area.
3.1.4 Back-up alarm shall be installed for the equipment.
3.1.5 Spotter or flagman shall be assigned for the equipment while
maneuvering.
3.2 Equipment failure 3.2.1 Crane shall have a valid inspection sticker issued by SA or by an CAT Engineer /
approved 3rd party inspection agency. Supervisor /
3.2.2 Pre-inspection of equipment shall be conducted by operator prior Foreman / Crane
to operation. operator / HSE
Officer / WPR
3.3 Tipping of crane 3.3.1 The load shall be within the safe working load / capacity of the CAT Engineer /
crane. Supervisor /
Foreman / Crane
operator / Rigger /
HSE Officer / WPR
3.4 Falling of load while 3.4.1 Crane lifts shall not be performed in wind speeds exceeding 32 CAT Engineer /
lifting km/h (20 mph) (17.4 knots) (9 m/sec), unless otherwise specified Supervisor /
by the crane manufacturer. Foreman / Crane
3.4.2 The crane operator shall not leave the controls at any time while a operator / HSE
load is attached. Officer / WPR
3.5 Unexpected movement 3.5.1 Tag lines shall be attached to the load unless it imposes a greater CAT Engineer /
of load hazard. Supervisor /
Foreman / Rigger /
HSE Officer / WPR
3.6 Rigging tackles failure 3.6.1 All riggers shall be certified by SA. The rigger shall have CAT Engineer /
responsibility for coordinating activities of all personnel involved Supervisor /
with the lift. Foreman / Rigger /
3.6.2 Rigging tackles shall be inspected by the certified rigger prior to HSE Officer / WPR
each lift.
3.6.3 Fasteners or other rigging hardware manufactured in-house from
bolts, rods, pins, hooks, etc., shall not be used.
3.6.4 Slings shall not be modified, repaired, shortened, or lengthened.
3.6.5 Defective or damaged slings and other rigging hardware, or slings
and other rigging hardware not complying with SA requirements,
shall be recorded in the Sling Inspection Log, and immediately
removed from the job site and destroyed.
3.6.6 Working conditions that may affect slings and other rigging
hardware shall be evaluated, with special attention to
Page 7 of 9
PMT/Contractor JSA Form - 1/12/2008
Page 9 of 9