IND3 Bilfinger Sweden 05 Lift
IND3 Bilfinger Sweden 05 Lift
* Order of the Safe Job Analysis is responsible for ensuring that all risk mitigation measures have been implemented before work starts
1 Lift Dropped objects due to Only certified personal 4 3 12 All lifting equipment All 4 2 8
misuse or faulty (Secure lifting or similar) must be controlled
equipment yearly and self-check
before use
2
2 Transport of lifting Damage to facility or One hand should always be 4 3 12 TA2 All 4 2 8
equipment to work people due to falling free
site equipment Control scaffolding
Plan on how to move before and during use
equipment
SJA Safe Job Analysis
3 Using rope to lift Falling load Cordon off the area 4 3 12 Always take extra time All 4 2 8
pipes to plan the job
Only lift pipes of appropriate
weight Consider the
maximum load weight
of the scaffolding
4 Use tackles to lift Falling load Cordon off the area 3 3 9 Always take extra time All 3 2 6
pipes to plan the job
Only lift pipes of appropriate
weight Consider the
maximum load weight
of the tackle
5 Use crane to lift Falling load Cordon off the area 3 3 9 Perform a search to All 3 2 6
material find and clear all
Important to consider the individuals in the lifting
entire area over which the zone
object is being lifted
6 Handling and Pinch and crush injuries Be observant of placement of 3 3 9 Secure material on All 3 2 6
receiving of lifted on hands fingers and hands ground level
objects
Crush protection gloves if
needed
8 Work finished Falling objects Always carry down what’s 3 2 6 Conduct daily All 3 1 3
Equipment left behind been carried up cleanings in the field
SJA Safe Job Analysis
9 Hanging load Falling load Cordon of the area 4 2 8 Use security personal All 4 1 4
to keep people out of
the area
SJA Safe Job Analysis