You are on page 1of 4

SJA Safe Job Analysis

Work task: Bilfinger Sweden 05 Lift Participants in the


Dzianis Sliuko HSE
Safe Job Analysis
Business Unit Frederik Gustafsson Site Lead
Bilfinger Industrial Services Sweden AB (Name and role):
Department/Customer:

Date: 24.10.22 Work is performed by:


Bilfinger Industrial Services Sweden AB
Order of the Safe Job (Name and role):
IND 3 Mönsterås
Analysis *:

* Order of the Safe Job Analysis is responsible for ensuring that all risk mitigation measures have been implemented before work starts

Work task and risk analysis:


Describe the work steps step-by-step, the risks with the respective steps and measures to be implemented to eliminate, prevent or
reduce the risk. To assess consequence (C), probability (P) → risk factor (RF), use the risk matrix at the end of the document
# Work task/ Hazard: Existing safeguards: Initial risk: Risk mitigation Responsible Remaining
Method Statement (What can cause ill health, harm or (Routines, training, experience, measures: : Risk:
environmental impact) protective equipment, etc.)
C P RF C P RF

1 Lift Dropped objects due to Only certified personal 4 3 12 All lifting equipment All 4 2 8
misuse or faulty (Secure lifting or similar) must be controlled
equipment yearly and self-check
before use
2
2 Transport of lifting Damage to facility or One hand should always be 4 3 12 TA2 All 4 2 8
equipment to work people due to falling free
site equipment Control scaffolding
Plan on how to move before and during use
equipment
SJA Safe Job Analysis

3 Using rope to lift Falling load Cordon off the area 4 3 12 Always take extra time All 4 2 8
pipes to plan the job
Only lift pipes of appropriate
weight Consider the
maximum load weight
of the scaffolding

4 Use tackles to lift Falling load Cordon off the area 3 3 9 Always take extra time All 3 2 6
pipes to plan the job
Only lift pipes of appropriate
weight Consider the
maximum load weight
of the tackle

5 Use crane to lift Falling load Cordon off the area 3 3 9 Perform a search to All 3 2 6
material find and clear all
Important to consider the individuals in the lifting
entire area over which the zone
object is being lifted

6 Handling and Pinch and crush injuries Be observant of placement of 3 3 9 Secure material on All 3 2 6
receiving of lifted on hands fingers and hands ground level
objects
Crush protection gloves if
needed

7 Lift Loose objects on top of Control of equipment/object 3 2 6 Control objects to All 3 1 3


what is being lifted falls make sure nothing is
down Keep tools in buckets/trays loose

8 Work finished Falling objects Always carry down what’s 3 2 6 Conduct daily All 3 1 3
Equipment left behind been carried up cleanings in the field
SJA Safe Job Analysis

9 Hanging load Falling load Cordon of the area 4 2 8 Use security personal All 4 1 4
to keep people out of
the area
SJA Safe Job Analysis