HIRARC FORM
Conducted by :
Ahamad Syahir Bin
Company Kyocera Propel Network (Name & Designation)
Radzan
Date :
Process/Location Work at height/tower (from 28/10/2021 to 7/11/2021 )
Date 28/11/2021
Next Review date
7/11/2021
2
Installation Running and Muscular/Back PPE, Competent carry Supervisor,
6 Activities, incl. cutting injuries Training, out risk Team
Position, align and cables, Fibre Foreign bodies in Competency assessments. members,
tighten down optics eyes, Minor Procedures and PM,
equipment Card/plug-in injuries (cuts, guidance within Engineers
units strains, sprains, the Installation &
installation bruises, hand/arm Commissioning
Battery injuries, trapping of Manual, Work
fluid/corrosion fingers or toes). Standards and
Weight, size - Fatality & Health and
handling and permanent Safety Manuals
lifting disability, supplied to all
equipment Battery short circuit Field Engineers
Use of hand Size and weight
tools of equipment
known
Site Safety
Induction
Checklist
3
Working above Falls from Fatality, slips, PPE, WAH 4 5 20 Training Supervisor/
8 at height, unprotected edges, trips and falls, training, provided for Team
rooftops, ladders, scaffolding minor/severe Proper tools & working at members/
Climbing towers and through injury Equipment. height. PM/ SHO/
etc. skylights. Medical condition, Regular review Engineers
Materials/tools/waste e.g. vertigo of training
packaging, falling Striking and undertaken for
from height. injuring persons at all staff
lower level conducting
Damage to climbing.
equipment/tools Assessment of
access and
egress
equipment
undertaken.
Access route
identified and
agreed with site
provider.
Ensure
tools/equipment
secure at
height. Waste
materials
removed from
site at the end
of the work
period.
Use of suitable
mechanical aids
to remove
equipment from
height.
9 Swapping Electrical hazard/ Electrocution/ Competent & PPE/ Training/ Engineers/
activities Falling from height/ Shock/ Fatality/ trained Safety Supervisor/
Inside Cabin/ fracture/ cut / bruises Injury/ Equipment workers/ awareness/ PM/ SHO
tower damage Proper tools/ Monitoring &
PPE supervision
4
10 Decomm Electrical hazard/ Electrocution/ Competent & PPE/ Training/ Engineers/
Falling from height/ Shock/ Fatality/ trained Safety Supervisor/
fracture/ cut / Injury/ Equipment workers/ awareness/ PM/ SHO
bruises/ lifting damage/ Proper tools/ Monitoring &
hazard Collision, PPE supervision/
major/minor Monitor
injuries, contractors
equipment training records
damage (Lifting
Unsecured load, operations
unexpected Policy &
shifting of weight, Procedure?),
back injury, House keeping
fracture, cut &
bruises
11 Remove, Handling and lifting Slips, trips and Proper Appropriate Supervisor
contain and broken crates onto falls, puncture housekeeping gloves supplied. & Team
dispose of lorry wounds, muscular training. Correct members
waste materials Bent nails and wood injuries, Environmental implements to
from site splinters asphyxiation, awareness cut or remove
Polythene, nylon splinters nails and
banding Environmental staples
Unsecured waste implications Control and
monitoring of
contractors
12 De-mob Physiological Disorientation, , Supervision & Safety Supervisor
hazard, left over knocks & falls, team awareness, & team
tools un attended, cuts environmental members
locking site awareness