Professional Documents
Culture Documents
a. Work at height
(forklift)
b. Work at height
(cutting work, without
goggles, near
electrical switch box)
c. Electric wire (without
socket)
23.10.2020 FRIDAY 1. Liquid Nitrogen filling
11
observation (driver PPE, 2
fire extinguisher, earthing,
wheel breaker)
3. Act, Rules,
Procedures.
23.10.2020 SATURDAY 1. Process Observation and
Safety Measures in
Intermediate Area of API
2. Explain the Various
Machine Guards in the
Equipment
3. Explain the safety Valves
4. Means of escape in case of
Fire
5. Road safety training
program
Week 2 26.10.2020 MONDAY 1. Onsite training
12
2. Various types of Hazards And
Control Measures
3. Explained About Personal
protective Equipment
4. Explained about Hierarchy of
controls
5. Explained various Cartridge
Mask and Dust mask
30.10.2020 FRIDAY 1. Safety pictogram symbols in
Work Area
2. Unsafe act and unsafe
conditions identifications
31.10.2020 SATURDAY 1. Disaster management plan
training
2. Disaster Management using
PHAST software
Week 3 02.11.2020 MONDAY 1. Emergency shutdown
procedure
4. Fire protection
arrangements in the form of
Fire Hydrants and Monitors
for the storage tanks.
06.11.2020 FRIDAY 1. Emergency handling checklist
and procedure.
2. Pressure alarm High and
Pressure alarm low for Storage
Tanks
3. Level indicators with
monitoring from control for
storage tanks
Week 4 09.11.2020 MONDAY 1. Risk assessment
2. Emergency response plan.
10.11.2020 TUESDAY 1. Process observation and
Safety measures in Clean
14
room area
15