Professional Documents
Culture Documents
CONSEQUENCE
damage Slight
2 Medical Limited response of
($10000 – $ impact
treatment for short duration 2 L (2) M (4) M (6) M (8) H (10)
100000)
personnel
2 Remote- Not likely to Once per 10 Minimum pollution / Minimum cost /
occur years Few minor Zero 3 L (3) M (6) M (9) H (12) H (15)
1 Little or no response damage
1 Very unlikely- Practically Once per 30 injuries < $10000 impact
needed 4
impossible years or more M (4) M (8) H (12) H (16) H (20)
Risk Assessment
Risk Identification Risk Analysis Initial risk
evaluation
Potential
No Hazard Existing control measures F C R
hazardous event
1 Dangerous atmosphere. Fatality Atmosphere tests carried out as per enclosed space 3 4 12
entry permit.
2 Injury due to slippery surfaces vessel's rolling. Serious injury to All P.P.E are provided and adequate illumination. no 3 3 9
personnel rolling/pitching.
Risk Assessment
Risk Identification Risk Analysis Initial risk
evaluation
Potential
No Hazard Existing control measures F C R
hazardous event
3 Accidental starting of ballast pumps. Serious injury to All valves/lines isolated and relevant warning posted 3 3 9
personnel on ballast pumps starting switches.
Note F: Frequency, C: Consequence, R: Risk
Are any amendments to SSMM required (related to the above Additional Risk Control Measures)?
Yes Describe:
No
Contingency plans (to facilitate safe management and recovery of the situation in case of any unplanned occurrences)
Emergency case Contingency Plans
RESCUE FROM REFER TO COMPANY’S EMERGENCY RESPONSE PROCEDURES (RESCUE
ENCLOSED SPACE, FROM ENCLOSED SPACE, SERIOUS INJURY) AND THE COMPANY SHOULD
SERIOUS INJURY BE CONTACTED.
Remarks: