RISK ASSESSMENTS
FLAME CUTTING
DOCUMENTATION REQUIRED TRAINING REQUIRED P.P.E & SAFETY EQUIP REQUIRED PERSONS INVOLVED
OHS ACT 85 OF 1993 General safety induction – all employees Overall – Standard issue Site agent
Supervisor of construction work appointment Toolbox talks – task specific Safety boots – Standard issue Foreman
Inspection register Flame cutting equipment training Eye protection – anti glare SABS Project HSE Officer
approved
Operator / user training certificate Correct use of PPE Hand protection – Leather gloves HSE Representative
MSDS (Material safety data sheet) Face shield
Monthly inspection registers. Spats
Fire extinguisher
First Aid Box
Matrix
PROBABILITY
Risk 6(1) Contractors Common Has Happened Could Occur Not Likely to
Assessment Signature Occurrence Occur
Team A B C D
Multiple Fatality R 500 000 1 2 4 7
Signature
Serious Injury R 50 000 – R 200 000 6 9 13 17
High Risk
Medium Risk
Low Risk
HEALTH, SAFETY & ENVIRONMENT
RISK ASSESSMENTS
FLAME CUTTING
trolley may lead to injuries and A daily check should be done to ensure compliance. Checklist should be signed off
property damage. by the supervisor.
3.3 Gas cylinders lying flat on the 3.3 Cylinders to be placed in an upright position in a cylinder trolley and be secured.
ground
3.4 No flash back arrestors fitted may 3.4 Flash back arrestors to be fitted on gauges and the torch. Daily checks to be done
lead to fire and explosions. to ensure compliance.
3.5 Hose damage may result in gas leaks 3.5 Daily pre-check and monthly inspection to be done to ensure equipment is in good
which may lead to an explosion. and safe order. Checklist to be signed off by the supervisor. Inspection to be done
by a trained and competent person. Damaged equipment to be replaced.
3.6 Damaged gauges can cause a gas 3.6 Daily pre-check and monthly inspection to be done to ensure equipment is in good
leak which may lead to an ignition and safe order. Checklist to be signed off by the supervisor. Inspection to be done
and explosion. by a trained and competent person. Damaged equipment to be replaced.
3.7 Damaged torch may cause a 3.7 Soap test to be done daily before use. Daily pre use checks and monthly
flashback which may lead to an inspections to be done to ensure that the equipment is in good working order.
explosion Checklist to be signed off by the supervisor. Inspection to be done by a trained and
competent person and damaged equipment to be replaced.
3.8 User not making use of PPE may 3.8 Only trained and competent person to use flame cutting equipment. Supervisor to
cause serious burns to user. ensure that employees are issued with the correct PPE and that they use it
correctly.
3.9 Fire can cause fatalities, major 3.9 Hot work permit to be obtained and inspection of work area to be done before
property damage, serious health risk work starts. All flammable liquids and materials to be removed from the area of
and ground, water air pollution. work.
3.1 Flame cutting done at heights may 3.10 Area below work to be demarcated as a No Go zone. Spotter to be posted at
0 lead to materials below been ignited, demarcated area and warning signs to be displayed.
workers been burnt and explosions.
SITE AGENT
A Pandelani V Swart
PROJECT HSE OFFICER
FOREMAN D Hammond
HEALTH, SAFETY & ENVIRONMENT
RISK ASSESSMENTS
FLAME CUTTING