You are on page 1of 3
iY aarvee associates architects engineers & consultants pvt. Itd, Letter No.: AA/HW/NHAI/Narmada/1681/17-18/1726 Date: 05" March, 2018 To, ‘The Project Manager, L&T 3° Narmada Bridge Project site, Zadeswar Chowkdi, NH-8, Toll Plaza Complex, Bharuch (Gujarat) ~ 392 011 ‘Sub: Six laning of Km 192.00 to Km 198.00 between Vadodara-Surat section of NH-8 including construction of a new four lane Extra Dosed across river Narmada in the State of Gujarat ‘on EPC mode-Reg: Provisional Certificate - Issued 1. NHAI letter No. NHAI/PIU-Surat(Expressway)/Narmada-7 1/2018/1079, dated 01.03.2018 2. Our Letter No. AA/HW/NHAI/Narmada/1681/17-18/1184, dated 28.11.2017 3. Contractor’ letter no. L&T-HCIC-Narmada-17-01-169, dated 15.09.17 Dear Sir, AAs per provisions of Clause 12.2 of EPC Agreement, we are pleased to issue the ‘Provisional Certificate’ for the above Project w.e.. 27.10.2017, along with the jointly signed "Punch List’, Part I containing works to be completed within 30 days from the effective date of Provisional Certificate, Part ~ II containing works that could not be completed due to hindrance / resistance from local public to be completed as and when the front is made available, We wish you all the best. With best regards, For Aatvee Associa 5 JaSwant Kumar ‘a Authorized Signatory Encl: As above. Copy to: The Chief General Manager (Tech) & RO, NHAI, Gandhinagar 2. The General Manager (Tech), Gujarat, NHAI, New Delhi 3. Project Director, PIU ~ Surat 4, Team Leader, Aarvee Associates in JV with NICE Pvt Ltd. Hyderabad - 500 089, India nail: aarvee@aarvee.net; web: www.aarvee.com 74200G2005°1C045491 Ravula Residency, Srin Tel: +91-40-93737633,48483456; Fox: +9 cn ar Colony Main ‘ix Laning of km. 192.000 to km. 198,000 between Vadodara ~ Surat section of NH-8 including construction of a new four lane Extra Dosed Bridge across river Nacmada inthe State of Gujarat on Engineering Procurement and Construction (EPC) contract mode [ - PUNCH UST (as on 27102017) Chanage [Sno | Description of work ‘From to Side Remarks ‘Part-|: LIST OF WORKS TO BE COMPLETED WITHIN 30 DAYS OF PROVISIONAL CERTIFICATE 1924000 | 192+800 i MBCB in Median Median | Yet to be started for a a length of 160m 1974660 | 1984540 2 | Garage near Admin building (Toll Paza) 1 overhead gantry before start of the Project i to 3 Sign Boards org tat 1964447 RHS | 196+500 RHS 4 Chute drains Sane ane Rectification of damaged portion 197+660, LHS 5 Shoulder Kerb & MBCE ETOH sos.s09 | 196,000 | BHS Work in progress 6 | Pipe and Box Culvert aprons | 194+700 cw 7 | Paver block at toll plaza Toll plaza x-ll: LIST OF WORKS WHICH COULD NOT BE COMPLETED DUE TO HINDRANCES AND TO BE COMPLETED AS AND WHEN THE SAME IS MADE AVAILABLE 1 | Guidebundonatside [Riverbank | AL CWPRS report anated [2 | Boundary fencing [Along the Project Highway | 3 | Eneuyatsipatonchanber | AFiéhembentmes Workin progress test stiles rom cal 4 tensa drain Along the Projet hay [5 | Footpatneumarain | 1924405 | 1924900 | tHS | Yettobe started objection fom locas) rao PROVISIONAL CERTIFICATE We, M/s Aarvee Associates Architects Engineers & Consultants Pvt. Ltd., acting as Authority's Engineer, under and in accordance with the Agreement dated 25.02.2014 (the “Agreement’), for “construction of Vadodara - Surat section (Km 192,000 to Km 198.000) of National Highway No. 8 (the “Project Highway”) on Engineering, Procurement and ‘Construction (EPC) baiss through M/s Larsen & Toubro Limited having its registered office at L&T House, N.M.Marg, Ballard Estate, Mumbai 400 001, hereby certify that, the Tests in accordance with Article 12 of the Agreement have been undertaken to determine compliance of the Project Highway with the provisions of the Agreement and are found to be in order. Works that are incomplete on account of Time Extension have been specified in the Punch List appended hereto, and the Contractor has agreed and accepted that it shall complete all such works in the time and manner set forth in the Agreement. In addition, certain minor works are incomplete and these are not likely to cause material inconvenience to the Users of the Project Highway or affect their safety. The Contractor has agreed and accepted that as a condition of this Provisional Certificate it shall complete such minor works within 30 (thirty) days hereof. These minor works have also been specified in the aforesaid Punch List. In view of the foregoing, we are satisfied that the Project Highway from Km 192,000 to Km, 198.000 can be safely and reliably placed in service of the Users thereof, and in terms of the ‘Agreement, the Project Highway is hereby provisionally declared fit for entry into operation wef 27" day of October, 2017. ACCEPTED, SIGNED, SEALED SIGNED, SEALED AND ‘AND DELIVERED DELIVERED For and on behalf of For and on behalf of opRACTER by AUTHORITY'S ENGINEER by (Signature) (Signature) _ Authorized Signatory Larsen & Toubro Limited, Authorized Signatory a> Aarvee Associates Architects En & Consultants Pvt. Ltd., in JV with Nag Infrastructure Consulting Engineers Pvt, Ltd. 8-2-5, Ravula Residency, Srinagar Colony Main Road, Hyderabad.

You might also like