2000-2004

Airborne Surveys
- Ikonos and Landsat

2005
Airborne Surveys
VTEM Survey (450km)
- 2 blocks Ntaka and small block directly south
- 200m line spacing 100m infill over Ntaka
- No data Supplied

Ground Surveys
None reported

2006
Airborne Surveys
VTEM Survey
- Processed and Interpreted P.Mutton (SGC)
- Inversions (EMflow) completed
- 30 Targets defines
- 10 Modelled
- Four Drilled
- No raw, processed or modelled data Supplied

Ground Surveys
MLEM and FLEM
- 8 FLEM Loops and 3 MLEM traverses over 13 VTEM targets (though 2007 and subsequent
annual reports say 9FLEM+4MLEM)
- Modelled and Interpreted P.Mutton (SGC)
- Raw Data and Models Supplied

2007
Airborne Surveys
VTEM Survey (5,971km)
- Completed Dec 2007
- No raw, processed or modelled data Supplied

Ground Surveys
FLEM
- Completed by Crone
- 11 FLEM Loops 79km
- 0.8333Hz base Freq 150ms time base (annual exploration report 1.667Hz)
- X+Z Components
- 25m stations lines 100m and 400m apart
- Modelled and Interpreted N.Hughes (Crone)
- No raw data or models supplied

DHEM
- Completed by Crone
- 33 Holes Surveyed
- Models as pdf and DXF from Crone
- Modelled and Interpreted S.Taylor (CNI) in 2008
- No raw data or models supplied

Groundwater Survey
- Completed by Ruvuma River Basin and Southern Coast Ministry of Water
- Conducted VES (8 points) and Seismic (2 lines 460m each)
- Seismic completed first then VES
- VES profiles shown, no seismic sections/shot paths

2008
Airborne Surveys
VTEM Survey (5,691km)
- 3 Blocks
- 100m-200m flight line spacings
- 100m reflight over Ntaka
- Modelled and Interpreted S.Taylor (CNI) 125 targets, 25 high priority.
- No raw, processed or modelled data Supplied

Ground Surveys
FLEM
- Completed by Crone
- 17 FLEM Loops 118km
- 1.667Hz base Freq 150ms time base
- X+Z Components
- 25m stations lines 100m and 400m apart
- Crone completed initial review and models (2008 annRep) but no Crone report provided
(should be Appendix 11)
- Modelled and Interpreted S.Taylor (CNI)
- No raw data or models supplied

DHEM
- Completed by Crone
- 41 Holes Surveyed
- Crone completed initial review and models (2008 annRep) but no Crone report provided
(should be Appendix 12)
- Modelled and Interpreted S.Taylor (CNI)
- No raw data or models supplied

Groundwater Survey
- Completed by Ruvuma River Basin and Southern Coast Ministry of Water
- Follow up to previous survey
- Conducted HES (4 areas 780m total length) and VES 5 points
- HES and VES profiles shown
- Digital data supplied
2009
Airborne Surveys
- Modelled and Interpreted S.Taylor (CNI) 125 targets, 25 high priority.
- No raw, processed or modelled data Supplied

Ground Surveys
FLEM
- Completed by Crone
- 23 FLEM Loops 99km
- 1.667Hz base Freq 150ms time base
- X+Y+Z Components
- 25m stations lines 100m apart
- Modelled and Interpreted S.Taylor (CNI)
- Only 3 of 4 Ntaka loops provided no models supplied

DHEM
- Completed by Crone
- 17 Holes Surveyed
- Modelled and Interpreted S.Taylor (CNI)
- Data for 9 Ntaka holes supplied only, no models supplied
-
2010
Airborne Surveys
- UTS-Aeroquest Mag/Rad Survey
- 250m line spacing 70m terrain clearance (33,841km)
- 256 channel Rad included
- All located data supplied

Ground Surveys
FLEM
- Completed by Crone
- 6 FLEM Loops 13.3km
- 1.667Hz base Freq 150ms time base
- X+(Y)+Z Components
- 25m stations lines 100m apart
- Modelled and Interpreted S.Taylor (CNI)
- All data supplied, no models supplied

DHEM
- Completed by Crone
- 31Holes Surveyed
- Modelled and Interpreted S.Taylor (CNI)
- All data supplied, no models supplied

No Further Annual Reports Provided.