Professional Documents
Culture Documents
a. Inspection based
b. System of quality control
c. Quality Assurance
d. Total Quality Mangement
2. Quality control__________
a. Quality System
b. Product testing
c. Error detection
d. None
a. Quality strategy
b. Quality standards
c. Quality System
d. None
a. Quality System
b. Quality assurance
c. Quality planning
d. Quality as a strategy
5. Inspection __________
a. Error detection
b. Product testing
c. Quality design
d. None
6. TQM is a _______________
a. Leadership
b. Customer
c. Ethics, Integrity and trust
d. None
b. False
a. True
b. False
b. False
a. True
b. False
a. True
b. False
a. True
b. False
a. True
b. False
a. True
9. The eight key elements of TQM are Ethics, Integrity, Trust, Leadership, Teamwork,
Training, Communication and Recognition
a. True
b. False
a. True
b. False