You are on page 1of 3

New Bridge

Ground
Ground

Above
Under
To Main Gate Security Hut

n
Proposed Locatio Railway Line
1mx1mx0.3m) Rail bar
(Working Space

Exis. Pile

Short Wall
Exis. Pile Exis. Pile
BW
BW

Exis. Pile
Short Wall
0.9

Fence
BW
Building

BW

End Point
(Baron Jayathilaka Mawatha)

PLAN VIEW
PROPOSED DI 1000 FEEDER MAIN AT PORT AUTHORITY

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA GUO JUN

CHEC-CGC JV TITLE: CERTIFIED CORRECT : DRG.NO. REV.


DETAILS OF PROPOSED DI 1000 FEEDER MAIN AT PORT
AUTHORITY - PLAN VIEW
DATE TEAM LEADER.
CHEC-CGC/GCWMP/FM01/BC/001 0
0 ISSUED FOR APPROVAL 26.07.2020 PROJECT MANAGER OF THE CONTRACTOR.
100x10 mm Stainless
Steel Strap &
Rubber Packing

100x10 mm Stainless DI Pipe


100x10 mm Stainless Steel Strap &
Rubber Packing
0.50 Steel Strap &
DETAIL ''A'' Rubber Packing
DETAIL ''A''
0.60

M24 Stainless Steel


Rag Bolt & Nut

(Varie at Site)

(Varie at Site)
1.43

200mm Long

1.00

1.00
25mm Thick 0.40
Neoprene
0.50

0.50

Rubber Pad 0.20

3.00 G25 Concrete 2.00


Block
Section A1 - A1 2.00
G25 Concrete
1.00
Section B1 - B1 Block
0.30

0.30
(For RHS) Section A - A Section B - B
B

A A
B1

2.00 1.00

A1 A1
100x10 mm Stainless B
2.00

Steel Strap & Plan


DETAIL ''A'' Rubber Packing Detail of Pipe Support
0.60

M24 Stainless Steel


Rag Bolt & Nut
200mm Long 100x10 mm
3.00 Stainless Steel Strap
25mm Thick
0.80

B1 Neoprene 100x25 mm
Plan Rubber Pad Stainless Steel
G25 Concrete Plate
2.00
Block Section B1 - B1 Fillet
Welding
(For LHS) M24 Stainless Steel
Rag Bolt & Nut
200mm Long
Detail of Pipe Support Detail ''A''

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA DHARSHANA

CHEC-CGC JV TITLE: 2 REVISED AS PER LATEST BRIDGE DETAILS 26.07.2020 CERTIFIED CORRECT : DRG.NO. REV.
PROPOSED PIPE BRIDGE DETAILS AT PORT AUTHORITY 1 REVISED AS PER LATEST BRIDGE DETAILS 07.03.2019
PREMISES. CHEC-CGC/GCWMP/FM01/BC/002 2
0 ISSUED FOR APPROVAL 24.08.2018 PROJECT MANAGER OF THE CONTRACTOR. DATE TEAM LEADER.
Security Hut

BW

0.9
Fence
BW
Building

BW

End Point
(Baron Jayathilaka Mawatha)

1.13
0.85

2.48

SECTION X1 -X1

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN WEST OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 26.07.2020 NTS
CONTRACTOR. RASIKA INDIKA GUO JUN

CHEC-CGC JV TITLE: CERTIFIED CORRECT : DRG.NO. REV.


PROPOSED PIPE BRIDGE DETAILS AT PORT AUTHORITY 1 ISSUED FOR APPROVAL 26.07.2020
PREMISES. CHEC-CGC/GCWMP/FM01/BC/003 1
0 ISSUED FOR APPROVAL 14.03.2019 PROJECT MANAGER OF THE CONTRACTOR. DATE TEAM LEADER.