Professional Documents
Culture Documents
D-71C D-71D
DMA DMA
DMA BOUNDARY D-71B
D-16AU
DPE
EXISTING PIPE LINE D-16AL 160
ØH
HDPE
90 Ø
A D-16AK 23A-D-71A
DM
160
D-16AS
PROPOSED PIPE LINE
90 Ø HDPE
63 Ø HD
90 Ø HD
D-16AJ
ØH
D-71
90 Ø HDPE
23A-D-69B
PE
DPE
PE
D-16AI D-16AZ
D-71E
23-D-68A
225 Ø
E
D-16AH HDP Stupa 90 Ø
AIR VALVE (NEW)
90 Ø HDPE
Ø D-16AAA
160
160 Ø
23A-D-69C DMA D-16AP D-16AX 90 Ø
HDPE
90 Ø HD
D-71F
90 Ø HDPE
HDPE
D-16AT D-70
160
HDPE
D-16AQ D-70A
PE
160 Ø PVC -EX 23A-D-69E
ØH
2 EH-23A-5
63
D-16AY
23-D-68C PE D-16AO
Ø
Ø HD
16AAH
DPE
1
90 Ø HDPE
23A
160 D-16AR D-16AW
160 Ø HDPE
D-70B
/LS/0
225 Ø HDPE 160 Ø PVC -EX D-16AQ
WASHOUT (NEW) D-16AN 23A-D-69E 23A-D-69B
11
D-16AQ N
16AAF 1
HDPE
PE
D-16AG 63 Ø
E
HDPE
90 Ø HD
HDP
63 Ø HD
-EX
90 Ø 400 Ø 160 Ø PVC 23A-D-69 16AAG
D-93B D-16AM AV-23A-15 23A-D-69A
90 Ø
23A-D-69C
PE
PE
16AAD SEE DETAIL
E
160 Ø
HDP
HD
D-16O
BRANCH / LINE VALVE 23A-D-69D DMA D-16AF
Gos
D-16AV D-16M1
HDPE
315 Ø
"C"
Ø
D-16M2
63
pel La
HDPE
D-16N
225
HDPE
23-D-93A HDPE
160 Ø
ne
110
110 Ø
90 Ø
Ø 23A-D-69
110
90 Ø HD
D-90AL
23A-D-69A Ø
Ø HD
16AAE 63 FH-23-08
16AAC D-90L
HDPE
63 Ø D-16M
Res
23-D-68 90
Ø
STEP VALVE D-90K D-69D
Res
E Ø
11
PE
HD
DP
PE
D-90J
HDP
0Ø
160
PE
Ø
ØH
ervo
ervo
90 Ø HDPE
90 Ø HD
D-90I
63
0 HD
11 16AAI
ØH
PE
ir Roa
3 3
D-16L D-90AM
90 Ø HD
S/0 DPE
ir R
A 16AAK
DPE
DM WO-23A-31 23
A/L ØH
160
PE
23A
E
63 Ø HDP
110 Ø
oad
D-90H
23A
PE D-16AE
PE
PE
HD
/LS/0
E ALREADY LAID
90 Ø HDP
BOUNDARY VALVE Ø
/LS/0
HD
NOTE 90 D-16AC
HDPE
10
0Ø
16AAL 63 Ø
90 Ø HD
PE
STEP VALE &
31
D-90Y D-88C
63
AV-23A-10 D-90X
11
D-90G
HD
63
D-76L D-76I D-88B
BOOSTER PUMP SUB ZONE VALVE D-94 Ø D-90V
0Ø
16AAJ D-90AN
90 Ø HD
D-88A
16
PE
Ø
DETAIL - "C" 16AAM 90 90 Ø
63
D-91D D-91B Ø
HD 16AD 90 Ø HDP
E
D-76K
HDPE
PE D-90AJ HDPE
BOOSTER PUMP SUB ZONE VALVE
PE
DETAIL - "B" WO-23A-32 23A
110 Ø HDPE
D-16AB
11
23
A/L
S/0
33
16K
90AK 90 Ø
D-76J
D-76B
D-76A
90 Ø
PE
23A-D-18R DP PE D-76D D-76C
90 Ø
HD
E
0Ø
D-91C
23A-D-1 NODE No. D-90AO
HDPE
11
D-77F 77D
23A-D-18Q D-16Z D-16I D-93 90 Ø DETAIL - "E"
90
90 Ø HD
90 Ø
PE
90 Ø
Ø
23A-D-18O
PE
HD
23A-D-18W
HD
HDPE D-90U TO BE LAID
PE
L WO-23A-33 D-16J 90 Ø
23A-D-18N 23A-D-18P 90 Ø
0Ø
D-16Y D-16H 77A
90
16
90
90
Ø
FLOW METER
110
D-77E D-77C
HD
ØH
Ø
FM PE D-77B D-88D
Ø HD
PE
HD
110
ØH
M AV-23A-9
DP
23A-D-18M D-90D
PE
E
HDPE
DPE
23A-D-18L 90 Ø 23A-D-18S K 23A-D-91
DPE 23A-D-92 To Ho D-90T PE
ØH
90
110
uses
160 Ø HD
PE AV-23A-5 90 HD
RAILWAY STATION
160
ØH
23A-D-18K 23A-D-18A 90 Ø
MARADHANA WO-23A-36 HDP D-90S
DPE
DP
ØH
E PE
H
FIRE HYDRANT 23A-D-18F PE 225 Ø HD
DP
23A-D-18G F
Ba
N
ØH
E HD 90 Ø
DM
HDP
ay
E
HDP
90 Ø 0Ø
Reservoir Road
160
Wa
E
A
16 90 Ø HDPE
90 Ø
Fro
tta
AV-23A-12 23A-D-18H D-16X D-90C
/037
mH
23A-D-18E
90 HD
LS
23A/
HD
ouse
PE D
38
HD O D-16W D-16G
PE
s
/LS/0
90 Ø
PE
23A-D-17 D-18Y D-90B 90 Ø
90
E 37
90
HDP HDP
B /LS/0
ØH
90
23A
Ø D-90Q E E
ØH
END HYDRANT 110 23A PE 90 Ø HDP D-68P
90
POLICE STATION D-90A
DP
HDPE
ØH
Temple D
63 Ø HDPE
ØH D-16V
DP
P.D
HDPE
ST 30
23A-D-18D
Ø H House
E
160
90 Ø
280 Ø
DP
C MARADHANA D-90AI Existing Reservoir
To
E
e.S
J D-90R
DP s
ATHA A
90 Ø
DMA
.K
E
" EX
MAW
90 HD
PE
90
HDPE
E
ula
90 Ø
YAH 02 23A-D-18i FH-23-16
PE
AV-23A-7 HD
LS/0 E
rath
T.B.JA EH-23A-2 D-90O
ØH
23A-D-18A D-16T D-16U P
23A/ 23A-D-18C HD
90 Ø HD
0Ø
na
PE
HDPE
EH-23A-4 Ø
DP
G 16 90 D-68i D-68K 90 Ø HDPE
Ma
R33
90
D-90AE DETAIL - "H"
E
D-90AF
wa
23A-D-18A I
END CAP
90 Ø
23A-D-18B
160 Ø
23A-D-18J D-
tha
PE
HD
D-16F DETAIL - H
90
HD
90
C D-16S
63 Ø
Ø 16AAB
P
HDPE
23A-D-18A 23A-D-18X
ØH
WO-23A-34
90
ØH
37 90 D-90AH
E
LS/0 DP
E
HDPE
63 Ø
23A/
ØH
DP
ØH D-90AG
DP
D-90AC
63 Ø
HDPE
D-68H
63 Ø
D-68o
90 Ø
90 D-68J D-68L D-3F1 HDPE
E
DP
23A-D-22E HDPE
23A HDPE
90
HDPE
D-16R D-68G
8
160 Ø D-90MA
E
/03
HDP
HDPE
23A-D-18Z D-90P
1
32.860
90MC
CNTRL
D-16E
*
H E 18AA D-68N
HDP
/LS
CRITICAL POINT
Ø
D-3O D-3F2
E
90 Ø D-90M WO-23A-28 WO-23A-8
90
90 Ø
23A-D-90
DM
90
23A/LS
Clif
23A-D-22F EX.
HD
23A/LS
Reservoi
30" CI
23
A
18AB D-90N D-90AD
ton
ØH
18AF
PE
D-103C D-3R
A/L
23A-D-68E
Lane
DP
18AE D-68M
Dema
S/0
HDPE D-103Q Ø DI
/010
D-16D
E
90 Ø 250
160
PRIORITY CONNECTION D-16Q 23 Existing Reservoir
/031
G
r Road
07
D-18 A/L 23A-D-88 WO-23A-29 New Valve House D-3P .
From
18AD EX
tagoda
CI
Ø HD
D-103P SEE DETAIL
EX
16 S/0 20"
Hous
DPE 63 Ø D-103O 17
90 Ø
0Ø D-90MB 23A-D-68C "B"
C
ØH D-103H D-3K
225 Ø
PE
DPE
PV
es
160
passa
WO-23A-03 HD ØH 2 63Ø HDPE
HDP
160
P 160 D-3V
90 Ø
E )
DIAMETER CHANGING POINT Mosque Land BOOSTER PUMP
HDPE
ge
D-90MB (WB
E
23A-D-68A
63 Ø
D-103I
90 Ø
E
D-103G New Reservoir
HDP
FM
w
160 Ø HDP
aM 1 D-3V1 23A-D-10
ghan D-103M
HDPE
D-21F
HDP
E
23A-D-21 WO-23A-6 ajira
90 Ø
16P Clifton Balika Vidyalaya D-3W
HD
PE Sri V D-103L AGE Ø
16
NRW Building
160
E
PE
ha
LL
Ø D-103K PE A CO 23A-D-68F
HDPE
0
(Under construction)
63 HD 90 Ø HD 23A-D-3H O&M
awat
63 Ø BALIK 63 Ø
ØH
23A-D-22G DP E 41 WO-23A-7
LS/0
Ø DA Building
D.R.W D-103F ØH 63 ANAN
23A/
DP
IJEWA 90
oM
RDENA D-21E 89H 23A-D-68D D-3W1 23A-D-9B
E
AV-23A-14 Cli
MAWA
DPE
D-103N D-103J 35 HDPE
Ther
THA FH-23-31 D-16C
ØH 90 Ø
fto
nL LS/0 110 Ø
D-16B D-15B 160
D-103R an 90MB AV-23
A-11 23A/ a Ro
ad
kand E
sa
89Z e DP 225
Rev
63 Ø Public Maliga ØH ØH D-3J D-3N
awan
D-16A 63 89 23A-D-68 DPE
D-103L D-85 110 Sump
DPE
Toilet Ø D-3Q
. Hik
23A-D-4D
I -EX
/036
DPE
imal
28
HDPE 23A/LS
D-20 EH-23A-7
HDPE
89A
90
ØH
kadu
0Ø
90 Ø
23A-D-22H 90 Ø
ØC
PE
ØH
/017
Ø
63
aW
23A/LS
5 Ø HD D-3S
HD
D-103E LS 89Y Ø
160
D-16 23A/ D-84A 31
we Su
HD E
110
HDPE
DP
PE
225 Ø
gam
700
160
D-20O PE
ØH
160
D-89i 23A-D-68B 23A-D-9A
Ø HD
PE 90
P.D
23A-D-21A SecurityHut
adde
HDPE 84D HD HDPE
man
D-3C
/023 63 Ø
D-86 90 Ø 110 Ø D-3D
Ø HD
DPE
e.S
22 90 Ø D-84 /039 FH-23-32 CMC Building
ØH
.B
ga
PE
5
.K
LS 63Ø HDP
63
23A/LS/002
Ø 160 23A/
ula
Ven
T.B.JAYA MAW
la R
ØH
PE PE
PE
20N 89C 23A-
23A
D-20P D HD E
rath
D DP 13U D-1
A ØH PE ØH ØH 00 DMA
DP
89D
oad
DM D-103A
na
90 63
/LS/0
90
HDPE
8
E
/00
HDP
M
D-20A 2 23A-D-89B
90
LS/03 D-3B
aw
PE Ø 84C 23A/ 89P /LS Mahinda Collage
13U1
Ø
ath
HD 90 D-15A 23A
39
E
PE Colombo
HD
225 Ø
23A-D-22D 90 Ø D-9
a
HD HDPE 89U D-3i Sump
160
PE
Ø 90 Ø
ATHA
23A-D-22
23
90 Ø
90
0Ø /040 90
400
PE D-103B
90
E Ø
A/L
DP HD 16 LS 63
Ø
DPE 89Q
ØH
23A/
90 Ø
ØH
ØH ØH D-89N
S/0
Ø
HD
ØH
90 20M 20B 110 D-20E D-15 35 315 HDPE AV-23A-3 D-3M Mw
01
63 Ø
DPE
90 Ø
PE
90 Ø
/LS/0
DP
90 Ø eka
90
DPE
13U2
HDPE
110 Ø HDPE 90 Ø D-89E ons
23A
90 Ø
D-89F EH-23A-1 A
E
atha
Ø
20L D-20F D-84B 89W 89R th F DM
90 Ø
EX
HDP
A 23A-D-22A Maw
90 Ø
DM PE ero
90 Ø HD 13V ra
DI-
23A-D-23 Sa
HDP
23A-D-21C D-20J Th 13L D-97C
gala 89X 23A-D-99
23A
23A-D-21B
HDPE
0Ø
20G D-14B 89V
PE uman D-3A DPE
E
ri S 13I
50
134 135
*
5.26 4.45
D
BW
133 BW
ØH
5.33 136
BW 5.42
ve S
90 Ø
P
ØH 89S 90 Ø
/LS/0
137
5.32
P
WO-23A-02 D-28A kadu E 89M 160
225 Ø HDPE
110
90 Ø
20H D-28B .Hik HDP D-89G
13K D-97A 23A-D-3G
90 Ø
90
138
5.16
Rev
P
90 Ø
09
147
4.98
89T
LS
Ø
D-20I D-89J
63 Ø
HDPE
90 Ø
D-3U
HD
90 Ø HDPE 23A-D-21D AV-23A-6 13J AV-23A-4
HDPE
160 Ø HDPE
5Ø
PE
90 Ø
160 Ø HDPE
139
4.80
HDPE
P
90 Ø HD
140
20K
4.80
P
31 PE
HDP
D-14F PE 13D 13G ne 13T D-3T
90 Ø HD
La
HD D-14 kanda HDPE
148
5.03
D-89O
P
153
5.50
500
BW
E
liga
13B 13O 1 Ma
st
D-97B 90 Ø D-3E
ST 3
23A-D-22J 150
5.29
23A-D-26 D-28
P
149
PE
ØD
/042
4.99
D-14D 13P
LS
AV-23A-13 23A-D-4
08
LS
63 Ø
D-14G
141
5.06
23A/
P
22
152
4.99
Medical D-13C
S/0
I-EX
PE
E
5Ø
23A-D-26A HDP Center 13M 23A-D-2 DI-EX
160 Ø HDPE
63
S/029
HD
500 Ø
A/L
E 13Q D-95A D-3
169
63 Ø
HD
23A/L
170 6.07171
13A PE
6.08 P 6.06
BW TP
90 Ø HDP
165
5.96
GP
FH-17A-1 90 Ø HD
123
142
Ø
0" Ø
3.15
5.04
124 164 172
P
3.33
RW 5.49
MDN BW 6.09
E 13F
5Ø
166 LS
156 5.89
5.10
LS LS
PE
HDP
23
157
90 Ø
23A/LS
5.45
D-28C
LS
125
a
3.33
MDN 163
5.92
CP FM
wath 63 Ø DPE
22
63 Ø
173
6.41
01
P
23A/LS/012 /LS/0 13N
162
a ØH
5.89
D-26E
63
A
GP
HDPE
154
5.00
P
FM
Jayasriramaya Temple
161
6.13
D-25G
158 BW
Ø
5.66
P
14E
P
na 23A-D-14C 23A-D-14A 13E 23A-D-98
/009
90 Ø HDPE WO-23A-04 63 Ø FH-17A-2 gu 23A 12J Kuppiyawatta
Abe
160
D-13S 13R
5.25
-EX
D-23M
P
D-23O HDPE
63 Ø
AV-23A-2 DPE D-97 400 Ø
90 Ø DPE ØH DMA AV-23A-1 PROPOSED 500 BUTTERFLY
D-23S D-25B
D-26F
D-26D 160
ØH 110
90 Ø
HDPE D-12E D-12H D-12N
12I VALVE
DM
D-23N D-24A D-23Q SEE DETAIL D-96 12L D-7D D-7H
23A-D-3F
A
23A-D-22L 23A-D-5 PE
63 Ø
5 Ø HD
155
4.82
D-12D
P
7A-2 E
FH-1 Ø HDP
"A" 22
63 Ø
160
D-23H Ø 42
90 D-12M 23A-D-2A
110 Ø HD
PE
/LS/0
63 Ø
12C 23A 12K 7E
DPE
Y.C.S. Center D-23V D-23P D-13 D-12G
EH-23A-3 D-23R HDPE
90 H
D-23L D-25B 225 Ø SEE DETAIL
90 Ø
23A/LS
Ø
D-25D 23A-D-27 "F"
63
7C D-5E HDPE
-EX
90 Ø
225 Ø
90 Ø
D-12F D-7B
/012
/02 8 Collag
e 23A-D-4C
0 "Ø 63 Ø HDPE HDP
E
23A/LS Ananda
HDPE
D-12B
ST 3 90 Ø
D-23T D-25A WO-23A-35
ØH
DP
E 90 Ø 90 Ø
To
160 Ø
90 Ø
D-12A D-7A 225 Ø
D-23I
HDPE
90 Ø
110 Ø HDPE
S/005
23A/LS/012
110 Ø
DM
23A/L
No. 119
FM
D-12 HDPE Mw
A
D-23J 90 Ø nda
HDPE
Ana
No. 149
Garden
D-7G D-5A
90 Ø HD
110
D-25C 225 Ø PVC
110 Ø HDP
No. 141
D-23W D-7F
ØH
110 Ø HDPE
110 Ø HDPE
23 MA
Garden
23A
A/L
16
225 Ø HDPE
DPE
23A-D-23A
PE
E NOTE
S
Garden
DP
D-25 E
/LS/0
D-23K
/00
0Ø 23A-D-26C
ØH
DP
60 H
6
E
22 225
21
1
PE
23A/LS/004 WO-23A-01 5Ø
110 Ø
23A-D-3F1 C- DMA
WO-23A-26
1. END CAP SHOULD ALWAYS BE PROVIDED AFTER LAST
EX Dewanampiyatissa Road F.B.(T)
23A-D-26B
BOUNDARY VALVE
St. Joseph's College Ananda College 2. ONLY BRANCH/LINE VALVES ASSOCIATED WITH
A
DM NEW PIPE LAYING SHOULD INSTALLED DURING
CONSTRUCTION PHASE. ADDITIONAL VALVES MAY BE
22
23A-D-8A
5Ø
23
HD
A /LS
DETAIL - "H" D-26U
PHASE IF REQUIRED.
PE
/04
DM
28
0
Peoples Bank
0Ø
E
HD
DM
HD
PE
A
DMA
315
Ø
D-26T
FINAL VALVE CONFIGURATION SHALL BE CONFIRMED
PE
DMA
HDP
E Ø
HD ON SITE AND SHOWN ON SHOP DRAWINGS FOR
AV-17A-02 63
DMA
5Ø 90 Ø CLIENT APPROVAL.
31
DMA 31 PE
5Ø
HD
HD
PE
23A-D-4
5Ø
22
22
5Ø
23-D-14A HD
4. PROPOSED DIAMETER MAY CHANGE WITH THE
PE INVESTIGATION RESULT.
16
0Ø 23-D-14
315 Ø
HD
PE HDPE
400 Ø
23-D-14C
23A-D-26
5. THE CONSTRUCTION METHOD TO CONNECT TO SUMP.SHALL
400 Ø
HDPE BE DECIDED AT THE SITE
23A-D-2A
6. PIPE & FITTINGS MATERIAL FOR RIDER MAIN(R.M, Dia. 90mm.)
CONNECTION WILL BE ARRANGED ACCORDING
DETAIL - "F" DETAIL - "A" TO THE SITE CONDITION
CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN EAST PART OF THE COLOMBO CITY R33 PIPE DETAILS REVISED AND ADDED 08.06.2021 RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 14.06.2016 1 : 5000
CONTRACTOR. CONTRACT NO : CWSSIP/ADB/CIVIL/ICB/02 R32 EXTENDED PIPE LINE & REVISED PIPE DIAMETER 22.01.2021 MARK NIKESHALA BAE
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
TITLE: R31 PIPE LINE CONNECTED & END WASHOUT ADDED 31.12.2020 CERTIFIED CORRECT : DRG.NO. REV.
KOLON GLOBAL CORPORATION KEY PLAN - DMA 23A
R30 ADDED NEW PIPE LINE 30.11.2020
R29 ADDED BY ROADS 17.09.2020 PROJECT MANAGER OF THE CONTRACTOR. DATE PROJECT DIRECTOR. CWSSIP/P2/23A/G/001 R33