You are on page 1of 10

Audit Observations / Actions Date: 6/25/2019

Page 1 of 10
Mirpur Mathelo

Date Location Job Audited

Behaviour Based Safety Audit

Audit Information:
01/6/2019 1225 To 1240 Bag and Liner Store Housekeeping after chipping of floor near liner store at B&S

Auditor 1: Sohaib Ejaz Randhawa Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Housekeeping was being carried out by contractor labor after finishing the Contractor's supervisor was inquired about the issue. Labor was asked to
day's chipping and manual excavation job at Liner Store entrance. One wear all safety gear during housekeeping after the job has been completed.
person was not wearing safety goggles while the other was without safety
halmet and safety goggles.

Audit Information:
09/6/2019 1430 To 1530 Urea Urea Conveyor Belts Alignment

Auditor 1: Muhammad Rizwan Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Job coordination was very good and team understanding about job
hazards and protective measures was very good.

Audit Information:
12/6/2019 1745 To 1800 Chiller # 1 Gas recovery from chiller # 1 system # 1

Auditor 1: Ghulam Sarwar Auditor 2: Kashif Yasin Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Job was being carried out safely but cylinders tagging was missing.
Audit Observations / Actions Date: 6/25/2019
Page 2 of 10
Mirpur Mathelo

Date Location Job Audited

Audit Information:
12/6/2019 1030 To 1045 V-942 C Scaffolding adjustment at V-942 C

Auditor 1: Osama Iftikhar Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Scaffolding adjustment was being performed safely. No action was necessitated.

Audit Information:
14/6/2019 100 To 130 Sphere Area Rectification of K-501B suction Isolating valve Yoke Bush

Auditor 1: Naveed Ahmad Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Ammonia Leakage possibility was evaluated incase of yoke bush Face mask and water hose pipe also provided.
dismantling.

Audit Information:
10/6/2019 1430 To 1530 Urea Fuse Tube Light Rectification at P-108 PF

Auditor 1: Muhammad Rizwan Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Multiple observations relating to WP violations observed: Job disucussed with Area Operator, Job supervisor and Area Engineer.
a) S/F installation and job execution activities performed parallel Advised them to ensure compliance of WP procedure.Moreover job also
b) S/F removed with post inspection and without WP discussed with contractor and agreed to impose fine for safety violation.
Audit Observations / Actions Date: 6/25/2019
Page 3 of 10
Mirpur Mathelo

Date Location Job Audited

Audit Information:
15/6/2019 845 To 855 MACHINE SHOP FLOOR LEAK TEST OF HYDRAULIC JACKS ON HYDRAULIC PRESS

Auditor 1: Mahmood Elahi Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Leak Test of a Hydraulic Jack was being carried out on Hydraulic Press that
is installed on one side of Walk Way of Machine Shop Floor. During this The job was immediately stopped & instructed the job supervisor to cordon off
job, in case of high-pressure oil leakage could splash / hurt to someone the Walkway on both sides to restrict movement of people on it. The job
passing thru the walkway. supervisor acted upon accordingly and then started the job. The job supervisor
was also instructed to be careful in future too.

Audit Information:
15/6/2019 1000 To 1100 Ammonia sphere K-501A suction isolating valve yoke bush rectification

Auditor 1: Ramesh Kumar Maheshwari Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 NIL Job safety discussed with EM and area operator.

Audit Information:
13/6/2019 900 To 1130 Inside Ammonia Sphere Inspection of S-502

Auditor 1: Hafiz Abdul Rahman Awan Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Inspection technicians and contractor inspectors working inside sphere The individuals were appreciated for their positive attitude towards safe work
S-502 were using all the mandatory PPE's mentioned in the approved JSA. work practices.
Audit Observations / Actions Date: 6/25/2019
Page 4 of 10
Mirpur Mathelo

Date Location Job Audited

Audit Information:
18/6/2019 1100 To 1110 Near Oil Shed Floor breaking near 05 area oil shed with Hilti Drill Machine

Auditor 1: Ahmad Bilal Zakir Auditor 2: Majad Maqbool Auditor 3: Jawad Hameed Auditor 4: Ahsan Ejaz

Observation Action Taken By Observer


1 The worker had lifted the face shield during the job. However, the Discussed with the supervisor.
supervisor nearby noted before me and instructed him to rectify.

Observation Action Taken By Observer


2 The worker stopped the job to clean his spectacles. He removed them and Discussed with supervisor and unit incharge.
gave a jerk to de-dust them. The spectacle lens separated from the frame.

Audit Information:
17/6/2019 1145 To 1215 Sphere Dyke Sphere dyke inside toe wall constrcution

Auditor 1: Affan Mahmood Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Tools (hammer and mesh for sand screening) in use by USL were in Job was stopped and contractor called out for rectification of all observations,
inadequate condition. Water was also present on soil (applied for bricks area operator also instructed for close supervision.
wetting) and area was not barricaded.

Audit Information:
19/6/2019 1430 To 1515 MP-101C Preventive Maintenance of MP-101C

Auditor 1: Asif Aziz Auditor 2: Shafqat Hussain Auditor 3: Ayaz Ali Jamali Auditor 4: Zahid Iqbal

Observation Action Taken By Observer


Audit Observations / Actions Date: 6/25/2019
Page 5 of 10
Mirpur Mathelo

Date Location Job Audited

1 Oil spillage on electrical cable,electrical motor and floor from Exchanger Discussed with operator and maintenance staff to take care in future.
E-132C of MP-101C. Proper oil was not drain and tray was not placed before
exchanger opening.

Audit Information:
19/6/2019 1030 To 1100 P-101C Replacement of Elbow near P-101C

Auditor 1: Naeem Iqbal Auditor 2: Ikram Ul Haq Auditor 3: Syed Faran Hussain Auditor 4:

Observation Action Taken By Observer


1 Cutting was carried out with all PPEs and Procedure compliance. Team was appreciated.

Audit Information:
20/6/2019 1100 To 1115 Near P-101C P-132C pressure adjustment

Auditor 1: Muhammad Junaid Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Job was executed safely

Audit Information:
20/6/2019 1330 To 1500 Open Yard Shifting of Heavy Steel Racks

Auditor 1: Ashfaque Ali Mandan Auditor 2: Manzoor Ahmed Mehr Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Proper PPEs were in use by team working on the job

Observation Action Taken By Observer


2 Heavy Duty Crane was used for shifting of Steel Racks
Audit Observations / Actions Date: 6/25/2019
Page 6 of 10
Mirpur Mathelo

Date Location Job Audited

Observation Action Taken By Observer


3 Shifting of Steel Racks from Open Yard toward Vehicle Shop was
completed in a safe manner

Audit Information:
20/6/2019 1100 To 1200 Materials Unit Construction of Shed at Bags & Liner Store

Auditor 1: Muhammad Ishaque Shaikh Auditor 2: Farhan Mahmood Auditor 3: Mansoor Ahmad Khan Auditor 4:

Observation Action Taken By Observer


1 Labor was in proper PPEs
Barrication need adjustment which was adjusted

Audit Information:
20/6/2019 1100 To 1110 In front of Workshop Fixing of curb stones along the road.

Auditor 1: Sohail Sarwar Bhatti Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Tool audit was carried out, contractor was using civil job by using 05 tools. Contractor was asked to change the defective tool.
Hammer and Chisel tools were issued from tool room.

While, other three civil tools were contractor tools. One tool was loose in
wooden arm and may cause accident.

Audit Information:
21/6/2019 900 To 930 01 area cooling towers Calibration of analyzer

Auditor 1: Umair Akbar Khan Auditor 2: Auditor 3: Auditor 4:


Audit Observations / Actions Date: 6/25/2019
Page 7 of 10
Mirpur Mathelo

Date Location Job Audited

Observation Action Taken By Observer


1 All work was being done safely with all PPEs and precautionary measures Appreciated the team

Audit Information:
18/6/2019 1030 To 1100 S-501 Walkway construction inside dyke of spheres

Auditor 1: Ghulam Murtaza Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Walkway wall was constructed in front of landing stairs and manpower was Observation and its hazard was discussed with shift incharge, area operator
crossing to approach other side. and contractor workforce. The excavation was back filled and wooden planks
were placed to secure the walkway.

Audit Information:
21/6/2019 1030 To 1050 Bulk store Installation of Split AC in Scraper, ME-1201 operator cabin

Auditor 1: Asghar Ali Auditor 2: Amanullah Shar Baloch Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Welding cable found at Scraper stairs Asked to supervisor to remove the cable. Cable removed from stairs and
placed at safe location

Audit Information:
15/6/2019 1000 To 1100 Ammonia MPI of S-502

Auditor 1: Syed Muhammad Hassan MurtazaAuditor


Gardezi2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Temperature observed on higher side during job. Job has been segregated in two shifts of 4hrs to cater for higher temperature.
Portable AC also installed.
Audit Observations / Actions Date: 6/25/2019
Page 8 of 10
Mirpur Mathelo

Date Location Job Audited

Audit Information:
13/6/2019 1100 To 1130 Outside the Laboratory Repair of Channel Outside Laboratory

Auditor 1: Hafiza Monaza Batool Auditor 2: Shahzad Hussain Auditor 3: Muhammad Ejaz Ali Auditor 4: Saqib Ejaz

Observation Action Taken By Observer


1 The workers were not using the proper PPEs which are required for the They were advised to wear the proper PPEs.
work.

Audit Information:
25/6/2019 1400 To 1500 Electrical Workshop Activity in Electrical Workshop

Auditor 1: Farhan Raza Jafri Auditor 2: Hafiz Muhammad Adeel Auditor 3: Agha Kashif Haider Khan Auditor 4:

Observation Action Taken By Observer


1 Testing activity on breaker in Electrical Workshop without safety goggles. He was asked not to repeat the mistake in future.

Audit Information:
25/6/2019 800 To 1200 Perform florr breaking near E-231 to expose CW lines

Auditor 1: Ali Rizwan Khan Auditor 2: Muhammad Ukasha Auditor 3: Bilal Mubashir Auditor 4: Farhan Naseer

Observation Action Taken By Observer


1 One casual worker was not wearing safety shoes. Counseled the worker and informed area in-charge

Audit Information:
25/6/2019 930 To 1000 Grassy Lawn Adjacnt to Sludge Drying Beds Grass Ctting by Units Helpers with the Help of New Cutter

Auditor 1: Hassan . Auditor 2: Auditor 3: Auditor 4:


Audit Observations / Actions Date: 6/25/2019
Page 9 of 10
Mirpur Mathelo

Date Location Job Audited

Observation Action Taken By Observer


1 Helper was wearing Following PPEs; Stopped the job and arranged Ear Muffs for him and asked him to in future
Helmet start job after ensuring all required PPEs.
Face Shield
Gloves
Legs Guards
But he was not wearing Ear Muffs

Audit Information:
25/6/2019 1100 To 1200 Near MK-212 Excavation near K-212

Auditor 1: Hassan Muzaffar Auditor 2: Farhan Raza Jafri Auditor 3: Hafiz Muhammad Adeel Auditor 4: Shafqat Hussain

Observation Action Taken By Observer


1 Casual worker was standing near excavation area, without wearing face The casual worker was asked to wear the dust mask and the safety
mask during excavation by pneumatic hammer. Dust was clearly all around instructions were also given to supervisor.
him.

Audit Information:
24/6/2019 1130 To 1145 P-920A pump oil cup replacement

Auditor 1: Muhammad Fazil Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Tag out and lock out procedure was being followed with true letter and
spirit. PPE compliance was also up to the mark.

Audit Information:
25/6/2019 933 To 1030 ME-1363 Preventive Maintenance

Auditor 1: Muhammad Junaid Khan Auditor 2: Muhammad Usman Auditor 3: Syed Asfandyar Gilani Auditor 4:
Audit Observations / Actions Date: 6/25/2019
Page 10 of 10
Mirpur Mathelo

Date Location Job Audited

Observation Action Taken By Observer


1 Preventive maintenance job of ME-1363 belt was audited. All steps Housekeeping carried out.
necessary for hazard free job execution were taken by the executing team.
However, housekeeping of the area needed attention. The same was
communicated to the team and rectified thereafter.

Audit Information:
25/6/2019 1400 To 1430 Machine Shop Cleaning of Machine shop pillars

Auditor 1: Zishan . Auditor 2: Auditor 3: Auditor 4:

Observation Action Taken By Observer


1 Cleaning of pillar was being carried out using air. However individual was Hazards were discussed with individual and supervisor as well. He arranged
not wearing dust mask dust mask for worker.

( End of Report )