Discipline : PJT Document Type : PLN Revision: R01 Status: N/A Rev Date: 22-09-2020 Page 1 of 5
Date of Assessment:
Company Assessed: Aveon Offshore Limited (AOL)
5th-6th October, 2020
Address: Eagle Cement Road, Rumuolumeni, Port Harcourt, River State. Type:
Assessment Criteria:
i. ISO 9001:2015 Standard.
ii.QMS Procedures and
Persons Contacted: records.
iii.Quality Manual
Assessment Team:
Engr Emeka Nnadi -- Lead
Assessor
Njoku, Chijioke --- Assessor
Distribution: Copy
Original:
INTRODUCTION:
Hi- Development Project fabrication yard evaluation and QMS audit of AVEON OFFSHORE LIMITED (AOL) was
carried out for two days been 5th and 6th October 2020 as stated in the notification Ref P04-20001-AO- EAN-001
from 10AM at their Eagle cement road, Rumuolumeni Port Harcourt River State Nigeria.
The purpose of the Audit is to look into the company’s Quality Management system ISO 9001:2015 effectiveness on
site by means of random sampling by the audit team. Company’s compliance to approved manual, Procedures and
departmental workflows with standard requirements and the descriptions in management system documentation.
The critical areas of the organization’s business activities, the applicable statutory and regulatory requirements was
looked into. This was done by means of a sampling approach, by conducting interviews and reviewing the
appropriate documentation.
The Auditors Arrived at the AVEON OFFSHORE LIMITED yard by 9:45Am, Security Clearance and Access control
checks was conducted. HSE induction was done for the Lead assessor and Assessor in line with their HSE
procedure.
The Audit Opening meeting started at 10:15Am at the conference Hall with the introduction of all members present.
The purpose and scope of the Audit was elaborated by the lead Assessor and appealed or maximum co-operation
by all parties involved in the Audit.
Item Classification
Activity/ Observation FVR? Ref.
Ref Critical SFI
Discipline : PJT Document Type : PLN Revision: R01 Status: N/A Rev Date: 22-09-2020 Page 2 of 5
Discipline : PJT Document Type : PLN Revision: R01 Status: N/A Rev Date: 22-09-2020 Page 3 of 5
GOOD OBSERVATIONS:
In general, all departments were cooperative during the Audit.
5
As requested during the opening meeting, the auditees made
themselves available at the scheduled time of audit.
SECURITY:
The entire perimeter of the facility is fenced except for the jetty
5.1
area with 24 hours surveillance cameras covering around and
within the company premises
Discipline : PJT Document Type : PLN Revision: R01 Status: N/A Rev Date: 22-09-2020 Page 4 of 5
DOCUMENTATION:
It was Observed that the company has licenced copies of
fabrication codes which are available to key personnel for
reference purposes some seen are AWS D1.1 and ASME B31.3.
5.4
TRAININGS:
Training plan for the year 2020 was seen however it was not fully
implementation due to the Covid situation in the country
6.1
Suggestions for virtual learning is advised.
It was observed that the pipe storage area was not properly
labelled and pipe end not covered and preserved from
environmental factors in line with standard preservation practise
6.3
Observed that the temperature and humidity checks in the
consumable storage area what taken and recorded only once daily
contrary to the twice daily as stated in the welding consumable
control procedure AOL-NIG-4D-PR-05
Discipline : PJT Document Type : PLN Revision: R01 Status: N/A Rev Date: 22-09-2020 Page 5 of 5
NDT facilities
Quayside Faclity