2019 2020
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
14-Aug-20,ACENX1 Jacket Offs
14-Aug-20,ACENX1.ACENX1.1
29-Jun-20,ACENX1.ACENX1.1.Start Start
Actual Level of Effort Actual Work Page 1 of 3 TASK filter: All Activities
Project Baseline Bar Remaining Work © Oracle Corporation
Jacket Offshore Structure Classic Schedule Layout 04-Aug-20 12:50
2019 2020
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Took Research Methodology
Dr. Abdallah Accary was assigned as the supervisor of this project.
Wrote and prepared proposal with world report and power point presentation
Learned and Trained on SACS software
Dr. Marie-Nour Kaydouh, Eng. Jihane Aouf were assigned as examiners of this project
Make presentation
27-Feb-20,ACENX1.ACENX1.1.3 Monthly report 2
Checked the maximum base shear with 8 directions, and then took the maximum.
I checked the maximum overturning moment with 8 directions, then took the maximum.
Created appendix at the end of the report where AutoCAD & SACS models are presented.
Started the reduction of my scientific paper: abstract redaction and outlines.
Showed progress and wrote down notes and recommendations.
Met with the members of my jury on the 22nd of April 2020.
Submitted the monthly report 4 on 24th of April 2020.
03-Jun-20,ACENX1.ACENX1.1.6 Monthly report 5
Took different members with the maximum load applied on them (Leg, Bracing
Checked the stresses (Shear, Moment) manual calculation.
Submitted the monthly report 5 on May 22nd 2020.
22-Jun-20,ACENX1.ACENX1.1.r Monthly report 6
Actual Level of Effort Actual Work Page 2 of 3 TASK filter: All Activities
Project Baseline Bar Remaining Work © Oracle Corporation
Jacket Offshore Structure Classic Schedule Layout 04-Aug-20 12:50
2019 2020
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Emailed Dr. Walid Kamali, and wait their c
Sent the final book to Dr. Abdallah Accary
Finish the abstract of the publication
Finish the presentation, the paper an
Present the ENGR599B
14-Aug-20,ACENX1.ACENX1.1
Actual Level of Effort Actual Work Page 3 of 3 TASK filter: All Activities
Project Baseline Bar Remaining Work © Oracle Corporation