S No
Total
C &M
Name of the Execution
Division
Paramakudi RR
Ramanathapuram
No.of Works inspected
8
8
-
at site
Name of Q.C division:Madurai
4
4
-
site inspected
-
Gradation
26
26
16
16
Binder content
37
37
Thickness/width
-
Density
13
13
Compressive strength /
0
0
-
Rebound hammer test
0
0
-
Slump/PH
No of tests conducted
8
8
Vicosity
-
Temperature
0
Total
-
Gradation
13 113 19
13 113 19
Binder content
16
16
Thickness/width
37
37
ABSTRACT
Density
11
11
Compressive strength /
0
0
Slump/PH
No. of test satisfied
8
8
Vicosity
-
Temperature
13
13
Total
104
104
WORK INSPECTED DETAILS OF ADE(H) QC FOR THE MONTH OF June 2017
Name of Q.C sub division:Ramanathapuram
7
7
Gradation
0
0
Binder content
0
0
Thickness/width
2
2
Density
Compressive strength /
0
0
Slump/PH
0
0
Vicosity
No.of test Not satisfied
0
0
Temperature
9
0
9
Total
-
Remarks
satisfied
satisfied
and then
Rectified
Rectified
and then
9 Nos. Not
9 Nos. Not
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE2017
NAME OF THE QC DIVISION: MADURAI
value Remarks
Item of work
Date of Name of Exe.Dn
S No Name of work Test location with Name of As per
inspection Exe.sub.dn As per test Satisfied / Not
Test (*) Estimate
at site satisfied
JMF
BC
BC
Depth 30 31 Satisfied
km 0/908.60
Width 3750 3780 Satisfied
1.50 m LS
Ramanathapuram
Special Repairs to Kovilankulam -
2 25.06.2017 (H) C&M/Kamuthi (H) FD using PQI 100.00% 100.40% satisfied
Komboothi Road Km.0/800-3/900
C&M
Depth 30 30 Satisfied
km 1/689.10
Width 3750 3750 Satisfied
1.40 m LS
WMM
Km 2/472.20
04.06.2017 Gradation --- --- Satisfied
1.00 m LS
Km 2/440.30
05.06.2017 Field density 100.00% 97.25% Not Satisfied
1.30 m RS
Field density 100.00% 100.65% Satisfied
Km 2/447.10
06.06.2017
1.35 m RS
Depth 200 203 Satisfied
BM
Depth 50 51 Satisfied
km 2/452.20
08.06.2017
1.10 m LS
Width 3780 3750 Satisfied
BC
Depth 30 30 Satisfied
km 2/670.50
09.05.2017 Width 3750 3760 Satisfied
1.10 m RS
FD using PQI 100.00% 100.90% satisfied
value Remarks
Item of work
Date of Name of Exe.Dn
S No Name of work Test location with Name of As per
inspection Exe.sub.dn As per test Satisfied / Not
Test (*) Estimate
at site satisfied
JMF
BM
GSB-V
02.06.2017 Ramanathapuram(H) Widening from SL To IL and strengthening Yard Gradation --- --- Satisfied
5 C&M/ Thiruvadanai(H) of Anjukottai - Neerkundram road at Km
km 6/429.80
06.06.2017 C&M 6/0-7/8. Field density 100.00% 101.607% Satisfied
0.90 m LS
Depth 200 200 Satisfied
km 6/635.90
07.06.2017
1.00 m LS
Width 1750 1750 Satisfied
BM
Depth 50 50 Satisfied
km 9/235.50
24.06.2017
1.80 m RS
5 C&M/ Thiruvadanai(H) of Anjukottai - Neerkundram road at Km
C&M 6/0-7/8.
value Remarks
Item of work
Date of Name of Exe.Dn
S No Name of work Test location with Name of As per
inspection Exe.sub.dn As per test Satisfied / Not
Test (*) Estimate
at site satisfied
JMF
km 9/235.50
24.06.2017
1.80 m RS
Width 5500 5500 Satisfied
value Remarks
Item of work
Date of Name of Exe.Dn
S No Name of work Test location with Name of As per
inspection Exe.sub.dn As per test Satisfied / Not
Test (*) Estimate
at site satisfied
JMF
BM
Depth 50 50 Satisfied
km 2/032.30
1.30 m LS
22.06.2017 Width 5500 5500 Satisfied
Depth 50 50 Satisfied
km 3/269.60
1.10 m LS
Width 5500 5500 Satisfied
Ramanathapuram(H) Widening from SL To IL and strengthening
6 C&M/ Thiruvadanai(H) of Anjukottai - Neerkundram road at Km BC
C&M 2/0-4/0.
Depth 30 31 Satisfied
km 2/737.80
Width 5500 5500 Satisfied
1.30 m LS
24.06.2017 FD using PQI 100.00% 100.70% Satisfied
Depth 30 30 Satisfied
km 3/876.10
1.10m RS
Width 5500 5500 Satisfied
BM
wmm
BM
06.06.2017 Viscocity Min 350 cP 522.8 cP Satisfied
Strengthening of
Ramanathapuram km 9/6 of Gradation --- --- Not Satisfied
Keelasemanur -
(H) Vikirapandi
3 Veeraperumalkoil road (Via)
C&M/Paramakudi Kolunthurai Gradation --- --- Satisfied
S.Kodikulam road at Km 2/2
07.06.2017 (H) C&M road
-3/700. Binder
3.50% 3.320% Satisfied
content
150 o C - 165 o C
Temperature 156°C Satisfied
+ 10 oC
BM
BC
BM
-------------------NIL------------------
FORM-4
FOR CONCRETE WORKS (AT READY MIX PLANT SITE ) FOR THE MONTH OF JUNE 2017
NAME OF QC DIVISION : RAMANATHAPURAM
1 2 3 4 5 6 7 8 9 10 11
1 Madurai
2 Dindigul
3 Theni
4 Sivagangai