No
Total
Madurai, RR
Name of the Execution Division
Madurai, C&M
Name of Q.C division:
6
6
No.of Works inspected at site
5
5
inspected
Madurai
15
15
Gradation
6
6
Binder content
-
40
40
Thickness, Width
-
9
9
Density
-
6
6
Temperature
-
Viscosity
No of tests conducted
Compressive strength /
-
76
76
Total
-
12
12
Gradation
-
6
6
Binder content
ABSTRACT
AGENDA No.2
40
40
Thickness, Width
-
8
8
Density
-
6
6
Temperature
-
Viscosity
No. of test satisfied
Compressive strength /
-
72
72
Total
-
3
3
Gradation
-
Binder content
INSPECTION REPORT OF ADE(H) QC Madurai FOR THE MONTH OF JUNE - 2017.
Thickness
-
1
1
Density
-
Temperature
-
0
0
Viscosity
No.of test Not satisfied
Compressive strength /
-
0
0
4
4
Total
--
Remarks
then Rectified
4 Not satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
NAME OF THE QC SUB DIVISION:MADURAI
BM
BM
Km. 0/080
R/S 0.80m from Thickness 50 mm 50 mm Satisfied
edge
Strengthening to Muruganeri road Width 3.75m 3.76m Satisfied
Madurai C&M/
1 brg.from Km.3/0 of Subbulapuram-
Peraiyur C&M BC
Sengulam road Km 0/0-1/6
Km 1/ 330 Thickness 30 mm 32 mm Satisfied
R/S 1.20m from
edge Width 3.75 m 3.75 m Satisfied
18.06.2017 Field Density > 100 % 100.20% Satisfied
BC
Km. 0/080
R/S 0.80m from Thickness 30 mm 31 mm Satisfied
edge
Width 3.75m 3.80m Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
Km. 2/303
R/S 0.80m from Thickness 50 mm 51 mm Satisfied
edge
Width 3.75 m 3.78 m Satisfied
19.06.2017
BM
Km. 1/412
L/S 0.80m from Thickness 50 mm 52 mm Satisfied
edge
Madurai C&M/ Strengthening to Keeranoor road Width 3.75m 3.75m Satisfied
2
Melur C&M Km 0/0-2/4 BC
Km. 2/303
R/S 0.80m from Thickness 30 mm 32 mm Satisfied
edge
Width 3.75 m 3.78 m Satisfied
21.06.2017
BC
Km. 1/412
L/S 0.80m from Thickness 30 mm 31 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
Km 2/030
Thickness 50 mm 51 mm Satisfied
R/S 1m from edge
Width 3.75 m 3.75 m Satisfied
BM
Km. 1/ 876.50
15.06.2017 R/S 0.90m from Thickness 50 mm 51 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
BM
Km 0/ 732.50
L/S 0.9m from Thickness 50 mm 50 mm Satisfied
edge
Madurai C&M/ Strengthening of Buskkaranpatti- Width 3.75m 3.75m Satisfied
3
Usilampatti C&M Kakkiveeranpatti road km 0/0-4/2 BC
Km 2/030
Thickness 30 mm 30 mm Satisfied
R/S 1m from edge
Width 3.75m 3.75m Satisfied
BC
Km. 1/ 876.50
26.06.2017 R/S 0.90m from Thickness 30 mm 30 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
BC
Km 0/ 732.50
L/S 0.9m from Thickness 30 mm 32 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
Gradation - - Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
WMM
Gradation - - Satisfied
WMM
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OFADE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Km 0/420 R/S Item of work with
S Date of As per
Exe.sub. Name of work Test from
0.90m location
edge Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Gradation - - Satisfied
FORM-2
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE- 2017.
FOR CONCRETE WORKS (AT READY MIX PLANT SITE ) FOR THE MONTH OF JUNE- 2017.
value Remarks
Ready Mix
Date of Name of Exe.Dn Grade of Name of Test
S No Name of work Plant As per As per test at
inspection Exe.sub.dn Concrete (*) Satisfied / Not
location codal Ready Mix
satisfied
Provision Plant site
- NIL -
- NIL -
- NIL -
- NIL -
- NIL -
- NIL -
ABSTRACT
INSPECTION REPORT FOR THE MONTH OF June 2015
Name of Q.C division: Madurai
No of CMP /
Execution
No.of Works
inspected
Division
Gradation
Gradation
Gradation
Thickness
Thickness
Thickness
site
Remarks
Density
Density
Density
content
content
content
Binder
Binder
Binder
No
Madurai RR
Dindigul RR
Theni RR
4 Sivagangai 1 1 1 1 1 1 1
C&M
Paramakudi 1 Not satisfied
RR
1 1 1 then rectified-
Ramnad 1 Not satisfied
5 3 1 4 1 0 1 4 0 0 0 0 1 then rectified-
C& M
Total 17 5 10 8 28 15 4 8 28 13 6 0 0 2
ABSTRACT
DETAILS OF TESTS CONDUCTED BY THE ASSISTANT DIVISIONAL ENGINEER (QUALITY CONTROL) AS ON 30.06.2017
NAME OF QC DIVISION: MADURAI (H) QC CIRCLE : MADURAI (H) C&M
NO OF WORKS TOTAL NO OF TESTS NO OF TESTS NOT
NOT RECTIFIED
NO OF
SL.
JUNE-2017)
JUNE 2017
JUNE 2017
NAME OF DIVISIONS TESTS REMARKS
NO
TOTAL
TOTAL
SATISFIED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A CONSTRUCTION & MAINTENANCE DIVISION
1 Madurai 11 6 17 94 76 170 162 4 4 8 8 -
2 Dindigul
3 Palani
4 Theni
5 Sivagangai
6 Ramnad
B MADURAI (H) NABARD & RURAL ROADS DIVISION
1 Madurai -
2 Paramakudi -