ABSTRACT

WORK INSPECTED DETAILS OF ADE(H) QC FOR THE MONTH OF JUNE 2017


Name of Q.C division:Madurai
No of tests conducted No. of test satisfied No.of test Not satisfied

inspected

No of CMP / Ready mix


Name of the Execution

Compressive strength /

Compressive strength /

Compressive strength /
Rebound hammer test

Rebound hammer test

Rebound hammer test


site inspected

Thickness/width

Thickness/width

Thickness/width
Binder content

Binder content

Binder content
Temperature

Temperature

Temperature

Remarks
Division

Gradation

Gradation

Gradation
at site
S No

Vicosity

Vicosity

Vicosity
Density

Density

Density
Slump

Slump

Slump
Total

Total

Total
No.of Works

Madurai
1
C &M
Madurai RR
Dindigul
2
C &M
Dindigul RR
Palani C
&M
Theni
3
C &M
Theni RR

5 Nos. Not
Sivagangai satisfied
4 6 3 6 3 46 17 _ _ 3 3 78 4 3 46 16 _ _ 3 1 73 2 _ _ 1 _ _ _ 2 5
C &M then
Rectified

Sivagangai
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
RR
Ramanathapu
5 ram
C &M
Ramanathapu
ram RR

5 Nos. Not
satisfied
Total 6 3 6 3 46 17 _ _ 3 3 78 4 3 46 16 _ _ 3 1 73 2 _ _ 1 _ _ _ 2 5
then
Rectified

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai
FORM - 1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE 2017
NAME OF THE QC DIVISION: SIVAGANGAI
Item of work value Remarks
Name of
Date of with As per
S No Exe.Dn Name of work Test location As per test Satisfied / Not
inspection Name of Estimate
/Exe.sub.dn at site satisfied
Test (*) JMF
NAME OF THE QC SUB DIVISION : SIVAGANGAI
BM
Km 0/235.20 Depth 50 53 Satisfied
07.06.2017 L/S 1.00m Width 5.50 5.52 Satisfied
Km 0/689.20 Depth 50 52.00 Satisfied
Widening from Intermediate lane to Double lane R/S 1.00m Width 5.50 5.50 Satisfied
Sivagangai (H) BC
and Strengthening of Madhagupatti -
1 C&M/ Sivagangai
Alagamanagari road at km 0/0-1/0, Depth 30 31 Satisfied
(H) C&M Km 0/235.20
Improvements at km 1/0-3/0 Width 5.50 5.52 Satisfied
L/S 1.00m
09.06.2017 FD 100% 100.2% Satisfied
Depth 30.00 30.00 Satisfied
Km 0/689.20
Width 5.50 5.50 Satisfied
R/S 1.00m
FD 100% 100.6% Satisfied
CRM
Depth 150 164 Satisfied
Km 0/152.6 Width 3.75 3.77 Satisfied
L/S - 0.80 Not Satisfied then
FD 100% 98.4%
Rectified
16.06.2017 Depth 100 123 Satisfied
Km 1/803.4
Width 3.75 3.76 Satisfied
R/S - 0.80
FD 100% 100.4% Satisfied
Improvements of Thiruvegampathur -
Sivagangai (H)
Pavanakottai road at km 0/0-3/0 using plastic
Depth 100 128 Satisfied
2 C&M/Devakottai(H Km 2/654.20
wastes including Reconstruction of culverts and Width 3.75 3.75 Satisfied
) C&M L/S - 0.80
Construction of retaining wall FD 100% 100.6% Satisfied
CGPC
Depth 20 20 Satisfied
1/426.5 L(0.80)
Width 3.75 3.78 Satisfied
20.06.2017 Depth 20 21 Satisfied
2/312.4 R(0.80)
Width 3.75 3.80 Satisfied
Depth 20 23 Satisfied
3/687.1 R(0.80)
Width 3.75 3.76 Satisfied
Item of work value Remarks
Name of
Date of with As per
S No Exe.Dn Name of work Test location As per test Satisfied / Not
inspection Name of Estimate
/Exe.sub.dn at site satisfied
Test (*) JMF
CRM
Depth 100 124 Satisfied
Km 23/305
Width 3.75 3.77 Satisfied
L/S - 0.80
16.06.2017 FD 100% 100.1% Satisfied
Depth 100 120 Satisfied
Improvements of Salaigramam - Sarugani road Km 22/750
Width 3.75 3.80 Satisfied
3 at km 22/0-24/0 using plastic wastes in cluding L/S - 0.80
Reconstruction of culverts FD 100% 100.3% Satisfied
CGPC
Km 23/305 Depth 20 22 Satisfied
21.06.2017 L/S - 0.80 Width 3.75 3.8 Satisfied
Km 22/750 Depth 20 21 Satisfied
L/S - 0.80 Width 3.75 3.77 Satisfied
WMM
19.06.2017 Not Satisfied then
Yard Gradation
Rectified
Depth 150 155 Satisfied
Km 5/165.50
Width 3.75 3.77 Satisfied
L/S (0.80)
Sivagangai (H) FD 100% 100.40% Satisfied
Strengthening of Kandanur - Aravayal road at
4 C&M/Karaikudi
km 5/0-7/420 using plastic waste (OSGO12) Depth 100 125 Satisfied
(H) C&M Km 6/119.80
21.06.2017
L/S (0.80) Width 3.75 3.8 Satisfied
FD 100% 101.00% Satisfied
Depth 100 120 Satisfied
Km 7/067
Width 3.75 3.77 Satisfied
L/S (0.80)
FD 100% 100.20% Satisfied
CRM
Gradation Satisfied
Km 2/994.4
Sivagangai (H) Improvements of Velayuthapattinam - R/S (1.20) Depth 150 155 Satisfied
5 23.06.2017 C&M/Devakottai(H Nedunkulam road at km 2/0-4/4 including FD 100% 100.40% Satisfied
) C&M Reconstruction of culverts
Gradation Satisfied
Km 4/250
Depth 200 220 Satisfied
R/S(1.20)
FD 100% 100.40% Satisfied
Item of work value Remarks
Name of
Date of with As per
S No Exe.Dn Name of work Test location As per test Satisfied / Not
inspection Name of Estimate
/Exe.sub.dn at site satisfied
Test (*) JMF
WMM
Depth 150 150 Satisfied
Km 0/010 Width 3.75 3.75 Satisfied
L/S -1.10
FD 100% 100.40% Satisfied
Depth 150 161 Satisfied
Km 1/690
Width 3.75 3.75 Satisfied
R/S -1.10
FD 100% 100.20% Satisfied
Sivagangai (H) Strengthening of O.Siruvayal - Kunnakudi road
6 23.06.2017 C&M/Karaikudi at km 0/0-4/4 including Reconstruction of Depth 150 155 Satisfied
Km 2/310
(H) C&M culverts Width 3.75 3.77 Satisfied
L/S -1.10
FD 100% 100.60% Satisfied
Depth 100 121 Satisfied
Km 3/399
Width 3.75 3.78 Satisfied
L/S -1.10
FD 100% 100.60% Satisfied
Depth 150 168 Satisfied
Km 4/060
Width 3.75 3.8 Satisfied
L/S -1.10
FD 100% 100.60% Satisfied

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai
FORM-2
FOR BITUMINOUS WORKS (AT CMP SITE OF ADE) FOR THE MONTH OF JUNE 2017
NAME OF THE QC DIVISION: MADURAI
Item of work value Remarks
Date of Name of Exe.Dn with As per As per
S No Name of work CMP location Satisfied /
inspection Exe.sub.dn Name of Test code and test at
(*) Not satisfied
JMF CMP site
NAME OF THE QC SUB DIVISION : SIVAGANGAI
BM
Gradation Satisfied
Widening from Intermediate lane to 3.4 +
Sivagangai (H) Double lane and Strengthening of Binder content 3.26% Satisfied
0.3%
1 05.06.2017 C&M/ Sivagangai Madhagupatti - Alagamanagari road at Thirumalai
(H) C&M km 0/0-1/0, Improvements at km 1/0- 150 -
3/0 Temperature 165 C 155 C Satisfied
+10 C
Viscocity 350 572.3 Satisfied
CGPC
Not satisfied
Gradation
then satisfied
IImprovements of Thiruvegampathur -
Sivagangai (H) Pavanakottai road at km 0/0-3/0 using 4.85 +
Kattuva Binder content 4.79% Satisfied
2 18.06.2017 C&M/Devakottai( plastic wastes including Reconstruction 0.3%
pallivasal road
H) C&M of culverts and Construction of retaining 150 -
wall Not satisfied
Temperature 165 C 158 C then satisfied
+10 C
Viscocity 350 523.4 Satisfied
CGPC
Gradation Satisfied
Improvements of Salaigramam - 4.85 +
Sivagangai (H) Binder content 4.62% Satisfied
Sarugani road at km 22/0-24/0 using Kattuva 0.3%
3 20.06.2017 C&M/Devakottai(
plastic wastes in cluding Reconstruction pallivasal road 150 -
H) C&M Not satisfied
of culverts Temperature 165 C 155 C then satisfied
+10 C
Viscocity 350 512.3 Satisfied

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai
FORM-3
FOR CONCRETE WORKS (FIELD INSPECTION REPORT OF ADE) FOR THE MONTH OF JUNE 2017
NAME OF QC DIVISION : MADURAI
Name of Item of work value Remarks
Date of Name of
S No Exe.Dn Name of work with Grade of As per Codal As per test Satisfied /
inspection Test (*)
Exe.sub.dn concrete Provision at site Not satisfied
NAME OF THE QC SUB DIVISION: SIVAGANGAI

NIL

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai
FORM-4
FOR CONCRETE WORKS (AT READY MIX PLANT SITE OF ADE ) FOR THE MONTH OF JUNE 2017
Name of Q.C division: Madurai

value Remarks
Date of Name of
Ready Mix Grade of Name of As per test at
S No inspectio Exe.Dn Name of work
Plant location Concrete Test (*) As per codal Ready Mix Satisfied / Not
n Exe.sub.dn Provision satisfied
Plant site

NIL

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai
NOT SATISFIED TEST DETAILS FOR THE MONTH OF JUNE 2017

NAME OF QC DIVISION : MADURAI NAME OF C&M DIVISION: Sivagangai


Item of Tests

Temparature

Field density
No. of test

Slump Cone

Compaction
Undulations
Thickness

Gradation

Rectified
Not
Content
S.No Name of work(Division Wise) Not

Binder

Rectified/
Width

Total
Test
Satisfied

Name of Q.C Subdivision: Sivagangai

Improvements of Thiruvegampathur -
Pavanakottai road at km 0/0-3/0 using plastic
1 3 1 1 1 3 Rectified
wastes including Reconstruction of culverts
and Construction of retaining wall

Strengthening of Kandanur - Aravayal road at


2 1 1 1 Rectified
km 5/0-7/420 using plastic waste (OSGO12)

Improvements of Salaigramam - Sarugani


3 road at km 22/0-24/0 using plastic wastes in 1 1 1 Rectified
cluding Reconstruction of culverts

Total 5 0 0 0 2 0 0 2 1 0 5

Assistant Divisional Engineer (H)


Quality Control Sub Division
Sivagangai