RATES AS PER SCHEDULE OF REQURIMENT OF LABOUR & MATERIALS UNDER MGNREGA: ASSAM, 2010-2011 AND P.W.D. 2009-2010.

UNDER HAPJAN DEV. BLOCK: MAKUM JN.

Name of Work:- Name of G.P.:-


WAGE MATERIALS

TOTAL AMOUNT IN RS.


WAGE AMOUNT RS.

MATERIALS TO BE
DESCRIPTION OF

AMOUNT IN RS.
REQUIRED (PER
LABOUR / UNIT

RATE / LABOUR
LABOUR TO BE
QUANTITY
LOCATION

BREDTH
LENGTH

VOLUME

RATE / UNIT
DEPTH

MATERIALS

(14+19)
MATERIALS

MATERIALS
CATEGORY

REQUIRED

REQUIRED
ITEM

UNIT
DESCRIPTATION OF WORK /

UNIT)
NO HIGHT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1:1 Face wall 2 2.40 0.90 0.90 3.89 Unskilled 0.4761 2.26 183.00 413.58
m3 labour

Item no 19- Earth work in excavation in Semi skilled


0.0625 0.30 198.00 59.40
lab
foundation tranches of walls footing of
1 colum, steps etc. including back after 1:2 bed 1 3.78 0.90 8 0.85 m3
completed the work lead and lift up to Skilled
labour 0.0313 0.15 273.00 40.95
1.50 m completed

TOTAL 4.74 m3 0.5699 2.71 654.00 513.93 513.93

unskilled
labour 4.0265 6.04 183.00 1105.32 400.00 2640.00
2:2 Face wall 2 2.40 0.90 0.15 0.65 m 3
Cement 4.40 6.60
Item no 25- Plain cement concrete work semi skilled
in prop 1:3:6 in foundation abutment lab 0.50 0.75 198.00 148.50 18% GST 475.20
piers wing etc. with hard broken stone
2
aggregate of size 13 mm to 40mm
including, scaffolding etc. where Sand 0.44 0.66 1000.00 462.00
skilled
necessary completed as directed 2:2 Bed 1 3.78 0.90 0.25 0.85 m3 labour 0.1250 0.19 273.00 51.87
(suttering, scaffolding cost will be paid Chips 0.88 1.32 2100.00 2772.00
separately)

TOTAL 1.50 m3 4.6515 6.98 654.00 1305.69 1.32 1.98 6349.20 7654.89

0.80+0.3 400.00 3768.00


Face wall 2 2.30 0/2=0.5 2.10 5.310 m3 unskilled 1.727 8.13 183.00 1487.79 Cement 2.00 9.42
labour
5 18% GST 678.24

semi skilled
lab 0.385 1.81 198.00 358.38 Sand 0.253 1.19 1000.00 1190.00
Item no 31- brick work in cement motar
3 with 1st class brick including raking in (0.80x0.
Deduction
sub-structure 1:4 2 3.14 80)/4=0. 0.60 0.60 m3
for H.P.
16 Bricks
skilled 0.385 1.81 273.00 494.13 Including 487.736 2298 7.80 17924.40
labour
Vat 5%

Page 1
RATES AS PER SCHEDULE OF REQURIMENT OF LABOUR & MATERIALS UNDER MGNREGA: ASSAM, 2010-2011 AND P.W.D. 2009-2010.
UNDER HAPJAN DEV. BLOCK: MAKUM JN.

Name of Work:- Name of G.P.:-


WAGE MATERIALS

TOTAL AMOUNT IN RS.


WAGE AMOUNT RS.

MATERIALS TO BE
DESCRIPTION OF

AMOUNT IN RS.
REQUIRED (PER
LABOUR / UNIT

RATE / LABOUR
LABOUR TO BE
QUANTITY
LOCATION

BREDTH
LENGTH

VOLUME

RATE / UNIT
DEPTH

MATERIALS

(14+19)
MATERIALS

MATERIALS
CATEGORY

REQUIRED

REQUIRED
ITEM

UNIT
DESCRIPTATION OF WORK /

UNIT)
NO
Item no 31- brick work in cement motar HIGHT
3 with 1st class brick including raking in
sub-structure 1:4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

TOTAL 4.71 m3 2.497 11.75 654.00 2340.30 489.99 2308.61 23560.64 25900.94

2x1 2.30 0.90 4.14 m2 400.00 792.00


unskilled 0.2721 3.66 183.00 669.78 Cement 0.147 1.98
labour
m2 18% GST 142.56

3:1 Face wall 2x1 2.30 1.40 6.44 m2

Top Face wall 2x1 2.30 0.30 1.38


m2 semi skilled 0.0625 0.84 198.00 166.32
Item no 33- 12 mm thick cement lab
4
plastering including clearing the surface
and curring etc.complete (i) In proportin
1:3 0.61+0.3 skilled
Side Wall 2x2 1.40 2.52 m2 0.0333 0.449 273.00 122.58 Sand 0.015 0.20 1000.00 140.00
0/2 labour

2x1x3.
3:2 14x 0.80x0.
Deduction (0.80x 1.00 m2
for opening 0.80) / 80/
4

TOTAL 13.48 m2 0.3679 4.949 654.00 958.68 0.162 2.18 1060.00 1074.56 2033.24

4160 20800.00

Rate
Hume pipe including
@Rs. 2 2.50 5.00 RM transporting,
4160/RM loading &
Providing and supplying RCC hume pipe unloading 18% GST 3744.00
5
culvert of class NP3, 600 mm dia 5.00 RM

TOTAL 5.00 RM 24544.00 24544.00

Page 2
RATES AS PER SCHEDULE OF REQURIMENT OF LABOUR & MATERIALS UNDER MGNREGA: ASSAM, 2010-2011 AND P.W.D. 2009-2010.
UNDER HAPJAN DEV. BLOCK: MAKUM JN.

Name of Work:- Name of G.P.:-


WAGE MATERIALS

TOTAL AMOUNT IN RS.


WAGE AMOUNT RS.

MATERIALS TO BE
DESCRIPTION OF

AMOUNT IN RS.
REQUIRED (PER
LABOUR / UNIT

RATE / LABOUR
LABOUR TO BE
QUANTITY
LOCATION

BREDTH
LENGTH

VOLUME

RATE / UNIT
DEPTH

MATERIALS

(14+19)
MATERIALS

MATERIALS
CATEGORY

REQUIRED

REQUIRED
ITEM

UNIT
DESCRIPTATION OF WORK /

UNIT)
NO HIGHT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

2 1x2.50 5.00 RM Unskilled 6.00 183.00 1098.00


labour

Labour charge for fitting and fixing H.P.


6 including charge from place of delivery of
site of excavation TOTAL 5.00 RM 6.00 183.00 1098.00

Earth work in filling embankment in layer


not than 20 cm thick including sectioning, 1 5.15 3.80 1.20 23.48 m3
dressing etc. as directed. unskilled
labour 0.5224 12.5800 183.00 2302.14
7
1 3.80 3.14 x 0.61
(0.80x0.80/4) m3

Deduction for H.P. opening


TOTAL 24.09 m3 0.5224 12.58 183.00 3400.14 3400.14

GRAND TOTAL 64047.14

Say Rs. 64000.00

(Rupees Sixty Four Thousand ) Only.

Junior Engineer B.D.O


Hapjan Dev. Block Hapjan Dev. Block
Makum Jn. Makum Jn.

Page 3
4160

Page 4
Makum Jn.

Page 5
Page 6
Page 7
ABSTRACT OF LABOUR & MATERIALS

ITEM NO DESCRIBTION Rate in Rs Qunty AMOUNT IN RS.

Wage cost.
1
a) Unskilled Labour 183.00 38.67 7076.61
Materials cost.
1. Semi skilled labour. 198.00 3.12 617.76
2. Skilled Labour. 273.00 2.60 709.80
3. 600 mm dia NP-3 Hume Pipe = 5.000 RM 4160.00 5.00 RM 20800.00
18% GST 3744.00
2 4. Cement 400.00 19 Nos 7600.00
18% GST 1368.00
5. Sand 1000.00 2.05 1435.00
6. Stone Chips 2100 1.32 Cum 2772.00
Bricks-Including GST 7.80 2298 17924.40

Total 64047.57
Say Rs. 64000.00

Wage cost = Rs. 7076.61


Materials Cost = Rs. 56970.96
Total = Rs. 64047.57
Say Rs. 64000.00

(Rupees Sixty Four Thousand ) only.

JE/AE (DH) B.D.O


Hapjan Dev. Block Hapjan Dev. Block
Makum Jn. Makum Jn.