Professional Documents
Culture Documents
ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III
CHIEF, PLANNING AND DESIGN DIVISION OIC, ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR
DATE : DATE : DATE :
INDEX OF DRAWINGS REGIONAL MAP of REGION I
SHOWING NATIONAL ROADS
SHEET NO. TITLE AND DISTRICT BOUNDARIES
TO CAGAYAN
PAGUDPUD
BANGUI
PAREDES
AIR STATION
BACARRA
VINTAR
LAOAG CITY
CARASI
SAN NICOLAS PIDDIG
SARRAT
SINAIT
CABUGAO
SAN JUAN
STO. DOMINGO
SAN ILDEFONSO
SAN VICENTE BANTAY
SANTA CATALINA
VIGAN CITY
CAOAYAN
TO ABRA
SANTA
NAGBUKEL
NARVACAN
STA. MARIA
SAN ESTEBAN
BURGOS
SANTIAGO
LIDLIDDA
BANAYOYO
CANDON CITY SAN EMILIO
GALIMUYOD
SALCEDO QUIRINO
STA. LUCIA
G. DEL PILAR
STA. CRUZ
SIGAY
SANTOL
LA UNION 1st
BACNOTAN
SAN GABRIEL
SAN JUAN
Santiago Island
ARINGAY
BOLINAO
TUBAO
PUGO
MARCOS HIGHWAY
AGOO
ANDA
STO. TOMAS
SUMMARY OF QUANTITIES
TO ZAMBALES MANGATAREM
TO TARLAC
TOTAL
LOCATION MAP
ITEM NO DESCRIPTION UNIT QUANTITIES R E M A R K S DRAWN NOT TO SCALE
512(1)a EROSION CONTROL MAT - TYPE I sq.m. 3,067.18 FOR ROCK FALL NETTING
513(1) PERMANENT GROUND ANCHOR l.m. 4,876.81 FOR ROCK FALL NETTING
522A(1) ACTIVE PROTECTION SYSTEM sq.m. 3,067.18 FOR ROCK FALL NETTING
PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BILLY JOE M. MOSTER
REPUBLIC OF THE PHILIPPINES REHABILITATION/ RECONSTRUCTION OF ROADS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SUMMARY OF QUANTITIES ENGINEER II
REGIONAL OFFICE I
TERTIARY ROADS, CERVANTES-MANKAYAN- INDEX OF DRAWINGS PREPARED: RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III 02
SAN FERNANDO CITY, LA UNION VICINITY MAP CHIEF, BRIDGES & OTHER PUBLIC WORKS CHIEF, PLANNING & DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABATAN ROAD 07
LOCATION MAP JOHN MICHAEL L. HIDALGO DESIGN SECTION
DATE: DATE: DATE:
(K0 389+800.00 - K0 389+914) DATE:
ENGINEER II
O V E R L A P D E T A I L S
P L A N V I E W
OVERLAP OF MESH AT CREST OF SLOPE
AND AT EVERY PANEL NOMINAL MINIMUM
OVERLAP = 200MM
EXISTING SOIL
CONNECTIONS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BILLY JOE M. MOSTER
REPUBLIC OF THE PHILIPPINES REHABILITATION/ RECONSTRUCTION OF ROADS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - CONNECTION DETAILS ENGINEER II
REGIONAL OFFICE I
TERTIARY ROADS, CERVANTES-MANKAYAN- OVERLAP DETAILS PREPARED: RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III 04
SAN FERNANDO CITY, LA UNION ANCHOR DETAILS CHIEF, BRIDGES & OTHER PUBLIC WORKS CHIEF, PLANNING & DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABATAN ROAD 07
JOHN MICHAEL L. HIDALGO DESIGN SECTION
DATE: DATE: DATE:
(K0 389+800.00 - K0 389+914) DATE:
ENGINEER II
A.) ITEM 522(A) D.O. SERIES OF 2019
ITEM 522- HIGH TENSILE WIRE MESH
R O C K F A L L A C T I V E S Y S T E M
PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BILLY JOE M. MOSTER
REPUBLIC OF THE PHILIPPINES REHABILITATION/ RECONSTRUCTION OF ROADS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TYPICAL CROSS SECTION ENGINEER II
REGIONAL OFFICE I
TERTIARY ROADS, CERVANTES-MANKAYAN- GENERAL SPECIFICATION PREPARED: RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III 05
SAN FERNANDO CITY, LA UNION CHIEF, BRIDGES & OTHER PUBLIC WORKS CHIEF, PLANNING & DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABATAN ROAD 07
JOHN MICHAEL L. HIDALGO DESIGN SECTION
DATE: DATE: DATE:
(K0 389+800.00 - K0 389+914) DATE:
ENGINEER II