Professional Documents
Culture Documents
RECOMMENDED: APPROVED:
SUBMITTED:
ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III
CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: DATE: DATE:
N REGIONAL MAP of REGION I PAGUDPUD
BURAYOC
BALAOI
PASALENG
PASALENG BAY
TO CAGAYAN
BINDAY
BANGUI
MASINI
BURGOS DUMALNEG
DILAVO
AGAGA
DARISDIS
TUNGEL
ADAMS
PAREDES BATO
MT. PAO
AIR STATION
LIPAY
KARUSQUIS
MT. MASADSADAC
VINTAR
S
LAOAG
LA PAZ
CITY
GABU CARASI
SAN NICOLAS PIDDIG
SARRAT UBOG
MANGITATAYU
DINGRAS
LUMBAO
PAOAY BIDDING
SOLSONA
BATAC
MARCOS
PADONG
CURRIMAO MT. SICAPDO
QUIOM
ILOCOS NORTE 2nd
PORT CURRIMAO QUIOM (BANNA) ESPIRITU
PINILI BALLAAG
BINGAO
STO. TOMAS
BADOC ISLAND MADUPAYOS
BADOC
SULAT POINT NAGREBSAN NUEVA ERA
THIS SITE
NASSADAO
SINAIT
BALACBAC
KAPAKAK
DACLABANO
SALAMAGUE 1
CABUGAO
N
SALAMAGUE
STO. DOMINGO
SAN ILDEFONSO
SAN VICENTE BANTAY
SANTA CATALINA
VIGAN CITY
CAOAYAN
TO ABRA
SANTA
SULVEC PT.
NAGBUKEL
NARVACAN
STA. MARIA
SAN ESTEBAN
SANTIAGO
BURGOS
BAYANGGUI
S
DAN-AR LIDLIDDA
BANAYOYO
CANDON CITY SAN EMILIO
GALIMUYOD
SALCEDO QUIRINO
STA. LUCIA
G. DEL PILAR
QUINIBU
STA. CRUZ
BUTAC
CERVANTES
TAGUDIN CABUGAO
ALILEM
BANGAR TO BENGUET
SUDIPEN
RIMOS
LUNA CASTRO SUGPON
BALAOAN
LA UNION 1st
BACNOTAN
SAN GABRIEL
SAN JUAN STO. ROSARIO
SAN FERNANDO PORT
LUBING NAGYUBUYUBAN
PORO POINT
NAGUILIAN
BURGOS
BAUANG
BAGUIO-NAGUILIAN
LA UNION 2nd
CABA
TO BA
UANG P BOLINAO
Santiago Island
ARINGAY SAN ANTONIO
ROP ER TO TUBAO
BAG PUGO
MARCOS HIGHWAY
UIO AGOO
CIT ANDA
Y STO. TOMAS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
A
16 175 250 150 138 200
a) ELEVATIONS WERE ASSUMED AT THE FIRST BENCH MARK AT THE BEGINNING OF EACH SECTION OF THE PROJECT
b) BENCH MARKS WERE ESTABLISHED AT EXISTING UNDISTURBED STRUCTURES AT DIFFERENT INTERVALS
D
D
ALONG THE PROJECT. A Db Db Db
Db
Do
Do
A
STIRRUP & TIE HOOK STIRRUP TIE
VI. HORIZONTAL ALIGNMENT END HOOK
Do = 6 db for db < 30 D = 4 db for db < 20
a) THE HORIZONTAL ALIGNMENT SHOWN IN THESE DRAWINGS FOLLOWS THE LONGITUDINAL JOINT OF THE Do = 8.7 db for db > 30 D = 6 db for db > 30
PCC PAVEMENT (WHICH IS DEFINED AS THE EXISTING CENTERLINE) WITH MINOR DEVIATION DUE MAINLY
TO SOME CONSTRUCTION ERRORS DURING ORIGINAL CONSTRUCTION STAGE. MINOR ADJUSTMENT OF THE X. SLOPE/EMBANKMENT PROTECTION WORKS (GROUTED RIPRAP/STONE MASONRY)
HORIZONTAL ALIGNMENT MAY BE MADE AS DIRECTED BY THE ENGINEER TO SUIT THE ACTUAL
FIELD CONDITION. a) FOUNDATION OF EMBANKMENT PROTECTION WORKS SHALL SIT ON A FIRM AND STABLE FOUNDATION. ALLOWABLE SOIL BEARING
CAPACITY SHALL NOT LESS THAN 196 KPa. SOIL BORING TEST SHALL BE CONDUCTED DURING CONSTRUCTION TO VERIFY THE
VII. REMOVAL OF EXISTING STRUCTURES & OBSTRUCTIONS ACTUAL SOIL BEARING CAPACITY OF SOIL SPOTS UNDER IF THE RESULT IF SOIL TEST REVEALS THAT BEARING CAPACITY IS
BELOW WHAT IS REQUIRED.
a) ALL WORKS SHALL COMPLY WITH CLAUSE 39 "REQUIREMENTS AND CONDITIONS OF CONTRACT VOLUME-1 THE FOUNDATION SHALL BE REMOVED AND REPLACED WITH SUITABLE BEDDING MATERIALS OR CONCRETE CLASS "B"
OF THE STANDARD SPECIFICATION FOR PUBLIC WORKS AND HIGHWAYS, 1988. b) SOFT SPOTS BETWEEN THE CUT FACE AND SLOPE/ EMBANKMENT PROTECTION WALLS MUST BE FILLED WITH ROCKS OR SUITABLE
b) PORTIONS OF EXISTING UTILITIES, SUCH AS WATER MAINS. IRRIGATION CHANNELS, TELEPHONE POST AND MATERIALS SUCH BACKFILL MATERIALS PLACED BEHIND THE WALL SHALL BE FREE DRAINING AND NON EXPANSIVE AND WATER
TRUNKLINES, ETC. THAT MAY CAUSE OBSTRUCTION TO THE CONSTRUCTION OF THIS PROJECT SHALL BE SHALL BE DRAINED BY WEEPHOLES PLACES AT SUITABLE INTERVALS AND ELEVATIONS.
RELOCATED BY THE ENTITY OR OWNER CONCERNED, EXTREME PRECAUTION SHALL BE EXERCISED BY c) THE DEPTH OF PENETRATION SHALL BE MEASURED FROM THE LEVEL OF THE ORIGINAL GROUND SURFACE AND SHALL NOT
THE CONTRACTOR NOT TO DAMAGE ANY SECTION OF THE EXISTING PUBLIC UTILITIES DURING INCLUDE EXCAVATED MATERIALS
CONSTRUCTION. ANY REPAIR OF DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF THE CONTRACTOR, d) THE THICKNESS OR DIAMETER OF STONES FOR STONE MASONRY SHALL NOT BE LESS THAN 150mm.
ANY REMOVAL OF MISCELLANEOUS STRUCTURES THAT MAY BE REQUIRED SHALL BE CONSIDERED
SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEM. NO DIRECT PAYMENT SHALL BE MADE
FOR THIS WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY FOR PAYMENT IN THE BID SCHEDULE. XI. PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
1. CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD
AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
2. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN
VIII. DRAINAGE STRUCTURES THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.
3. TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BAR SHALL BE SMOOTH ROUND STEEL BAR FREE FROM
a) EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE
RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR MOVEMENT.
CHECKED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENT MAY BE MADE WITH THE APPROVAL OF THE
4. TYPE OF WEAKENED JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED
ENGINEER TO SUIT ACTUAL FIELD CONDITIONS.
FOR THE WHOLE PROJECT.
b) ANY REVISIONS REMOVAL AND /OR RELAYING OF DRAINAGE STRUCTURE AS DIRECTED BY THE ENGINEER TO SUIT
5. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18OF BLACK IRON FREE
EXISTING FIELD CONDITIONS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER
FROM RUST AND LINKS.
CONTRACT ITEMS NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE SPECIFICALLY
6. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AS NORMAL JOINT SPACING SHALL BE PROVIDE BEFORE OR
IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE.
AFTER AN EXPANSION JOINT.
c) EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE CONTRACTOR THAT ARE STILL
7. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50
SERVICEABLE SHALL BE TURNED OVER TO THE GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN
PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN
THE PROJECT SITE DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION. EXTREME
CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE MATERIALS DURING THE
8. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM EDGE TO EDGE.
REMOVAL AND HANDLING.
9. ALL LONGITUDINAL JOINT SHALL MEET AT INTERSECTION WITH NO GAPS OR OFFSET.
10. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
11. AVOID STOPPAGE OF FRAMEWORKS ALONG CURVES.
12. TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDE AT THE END OF ANY RUN WHERE LAYING OF
XIII. B.P. 344 ACCESSIBILITY LAW
CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR LONGER.
13. TRANSVERSE CONSTRUCTION JOINTS WHICH OCCUR LOCATION OF WEAKENED PLANE JOINTS WITH DOWELS IF
THE IMPLEMENTING OFFICE SHALL PROVIDE AND IDENTIFY THE LOCATIONS OF ACCESSIBILITY
JOINT OCCURS IN THE MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL (1500-300mm) IT SHOULD BE KEYED JOINTS
FACILITIES FOR PERSONS W/ DISABILITY IN ACCORDANCE WITH D.O. 37 SERIES OF 2009.
WITH THE BARS.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
0.60
0.60
P A R A P E T W A L L
SLOPE 0.0 %
0.60
10
PCCP SIDEWALK, t=0.10 M.
Ht = VARIABLE
Ht = VARIABLE
1.00
S =1 : 24 ITEM 104 - EMBANKMENT
Ht = VARIES
S =1 : 24
SELECTED BORROW MIXED SAND
& GRAVEL RIVER MIXED
H
H
ITEM 200 - AGGREGATE SUB BASE COURSE
H
S T O N E M A S O N R Y
1.00
NATURAL GRADE LINE
MIN.
0.60
MIN.
100MMØ PVC DRAIN OR WEEPHOLES WITH FILTER
0.60
MIN.
0.60
CLOTH TIED AT THE INNER END OF THE WEEPHOLES
AND 120MM MEDIUM GRAVEL AND 120MM FINE
PCCP SIDEWALK, t= 0.10 m. GRAVEL SPACED AT 2.0M. ON CENTER HORIZONTAL
B = 0.6 ITEM 200 - AGGREGATE SUB BASE COURSE
AND 1.0 M. VERTICAL STAGGERED
5H NATURAL GRADE LINE
B = 0.65 H
NATURAL GRADE LINE (RICE FIELD) E BOTTOM BASE OF STONE MASONRY
SEE DETAIL ON WEEPHOLES
STONE MASONRY
100MMØ PVC DRAIN OR WEEPHOLES WITH FILTER CLOTH TIED
100MMØ PVC DRAIN OR WEEPHOLES WITH FILTER
CLOTH OR TIED AT THE INNER END OF THE
ELEVATION AT THE INNER END OF THE WEEPHOLES AND 120MM MEDIUM SECTION "E" CUT LINE
PERSPECTIVE WEEPHOLES AND 120MM MEDIUM GRAVEL AND 120MM GRAVEL AND 120MM FINE GRAVEL SPACED AT 2.0M. ON
FINE GRAVEL SPACED AT 2.0M. ON CENTER CENTER HORIZONTAL AND 1.0 M. VERTICAL STAGGERED
HORIZONTAL AND 1.0 M. VERTICAL STAGGERED 6MMØ-15MMØ
DETAIL "D" ON STONE MASONRY FINE GRAVEL, t=120MM
SCALE 1: 60 MTS
DESIGN CRITERIA OF STONE MASONRY NOTE: ( STONE MASONRY)
25MMØ-39MMØ
MEDIUM GRAVEL, t=120MM
MASONRY = .............23.55 kN/ Cu.m.
PRIOR TO CONSTRUCTION, CONDUCT SOIL INVESTIGATION IN
FILTER CLOTH TIED AT THE INNER END OF THE
SOIL = .......................15.70 kN/ Cu.m. ACCORDANCE WITH THE STANDARD TESTING REQUIREMENT ALONG
WEEPHOLES
THE ALIGNMENT OF STONE MASONRY WALL TO VERIFY THE REQUIRED
Ø = .................................35.70° ANGLE OF INTERVAL REPOSE DESIGN SOIL BEARING CAPACITY OF THE FOUNDATION BED.
Qa = ..............................196 kPa (TO BE VERIFIED DURING CONSTRUCTION) 0.12 0.12
=................................. 0.50 ASSUMED COEFFICIENT OF FRICTION MORTAR
NOTE:
Qs = ...............................22.52 kPa BOULDERS
ALLOWABLE SOIL BEARING CAPACITY = 196 Kn/m
FSo =..............................2.00
0.12 0.12
100 mm Ø PVC WEEPHOLES SPACED AT 2.0 M.
FS =..............................1.5 ON CENTER HORIZONTAL AND 1.0 M. VERTICAL,
CL STAGGERED
20.00 M. RROW
10 00 10 00
PROPOSED PARAPET WALL 0.50 0.15 SEE DETAIL "B" 0.15 0.50
S =1 : 24
SEE DETAIL ON CONCRETE GUTTER
0.50
0.60
0.60
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
1.50
0.50
Ht = VARIES
Ht = VARIES
S =1 : 24
S =1 : 24
0.40
ON FILL S=0.5 %
S=0.5 % ON FILL ON FILL SEE DETAIL ON
H
H
1.80 WEEPHOLES
MIN.
0.60
MIN.
0.60
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE SEE DETAIL ON SOLAR STREET LIGHT
PAVEMENT, t= 0.28 m. (CARRIAGEWAY) NATURAL GRADE LINE CATCH BASIN/ MANHOLE
CUT LINE
SCALE 1: 20 MTS
ITEM 200 - AGGREGATE SUB BASE COURSE ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
B = 0.65 H PAVEMENT, t= 0.28 m. (CARRIAGEWAY) PAVEMENT, t= 0.28 m. (CARRIAGEWAY) NOTES:
ITEM 104 - EMBANKMENT (FROM ROADWAY B = 0.65 H
ITEM 200 - AGGREGATE SUB BASE COURSE ITEM 200 - AGGREGATE SUB BASE COURSE 1. THE COST OF FINE MEDIUM GRAVEL, WEEPHOLES,
EXCAVATION) SELECTED BORROW MIXED SAND
(BURLAP[ CLOTH) USED FOR THE
& GRAVEL RIVER MIXED ITEM 104 - EMBANKMENT (FROM ROADWAY ITEM 104 - EMBANKMENT (FROM ROADWAY
SEE DETAIL ON WEEPHOLES SHALL BE CONSIDERED SUBSIDIARY TO
CONCRETE GUTTER EXCAVATION) SELECTED BORROW MIXED SAND EXCAVATION) SELECTED BORROW MIXED SAND
CATCH BASIN/ MANHOLE COMPLETION OF PAY ITEM WHERE IT IS USED.
PCCP SIDEWALK, t=0.10 M. & GRAVEL RIVER MIXED & GRAVEL RIVER MIXED
SEE DETAIL ON 2. ALL WEEPHOLES SHALL HAVE A SLOPE OF 0.5%.
STONE MASONRY
TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/ STONE MASONRY, AND MANHOLE ON EMBANKMENT
SCALE: 1:80 MTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
0.28
0.28
SUBGRADEDESIGN CBR = Psi
EFFECTIVE ROADBED RESILIENT MODULUS: MR = Psi
SUBBASE ELASTIC MODULUS : ESB ....................................= 15,000 Psi (CBR >30 %)
0.20
0.20
SUBBASE THICKNESS = 8'' (200 mm.)
EFFECTIVE MODULUS AT SUB-GRADE REACTION : K (PCI) = PCI CONSTRUCTION JOINT CONSTRUCTION JOINT
DRAINAGE COEFFICIENT : Cd =1.0
LOAD TRANSFER COEFFICIENT : J ...............................................= 3.80
LOSS OF SUPPORT : Ls ......................................................................= 1.0
K CORRECTION......................................................................................= ITEM 200 - AGGREGATE ITEM 200 - AGGREGATE
SUB BASE COURSE t = 0.20 m. SUB BASE COURSE t = 0.20 m.
PAVEMENT THICKNESS 280 mm.
ITEM 105 - SUB-GRADE ITEM 105 - SUB-GRADE
NOTE: CBR OF SUB-GRADE SHOULD BE VERIFIED/CHECKED PRIOR TO CONSTRUCTION PREPARATION PREPARATION
DETAIL "B" CONSTRUCTION/ LONGITUDINAL JOINT DETAIL "A" CONSTRUCTION/ LONGITUDINAL JOINT
SCALE 1:20 MTS. SCALE 1:20 MTS.
20.00 M. RROW
10 CL 10
1.30 1.30 SHARED LANE INNER LANE INNER LANE SHARED LANE 1.30 1.30
SIDEWALK BIKE LANE BIKE LANE SIDEWALK
0.19 SEE DETAIL "B" 0.19
SEE DETAIL "A"
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (CARRIAGEWAY) PAVEMENT, t= 0.28 m. (CARRIAGEWAY) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
ITEM 200 - AGGREGATE SUB BASE COURSE ITEM 200 - AGGREGATE SUB BASE COURSE PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
ITEM 105 - SUB-GRADE PREPARATION ITEM 105 - SUB-GRADE PREPARATION ITEM 200 - AGGREGATE SUB BASE COURSE
ITEM 105 - SUB-GRADE PREPARATION
TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/
PROVIDE ROUNDING SLOPE CONCRETE CANAL W/ SIDEWALK ON THE U-TURN SLOT PROVIDE ROUNDING SLOPE
1.5 CL 0
0 1.5
TO BE CUT
NATURAL GRADE LINE
20.00 M. RROW
1
SL
1:
10.00 10.00
O
PE
PE
O
0.50 7.00 0.60 7.00 0.50
1:
SL
TO BE CUT CONCRETE GUTTER
1
CUT LINE 3.35 3.35 ISLAND 3.35 3.35 PCCP SIDEWALK, t=0.10 M. CUT LINE
1.90 1.30 SHARED LANE INNER LANE INNER LANE SHARED LANE 1.30 1.90 0.80
SIDEWALK BIKE LANE BIKE LANE SIDEWALK
0.15 SEE DETAIL "B" 0.15 0.15 0.15
20.0 MTS RROW
h=2.75
S=0.5 %
S=0.5 %
SEE DETAIL ON CONCRETE GUTTER 0.50
0.50
0.65
0.50
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
10.00 CL 10.00
SIDEWALK, t=0.10 M.
VARIES 0.60 7.00
2.00 LATERAL RCPC
DIA.
VARIES 3.35 ISLAND 3.35 3.35 DRAINAGE
SIDEWALK
0.50
e= %
0.50 BIKE LANE e= %
SEE DETAIL ON CONCRETE GUTTER
NOT TO SCALE
e= %
0.60
2.00% e= %
1.50
e= %
Ht = VARIES
0.50
0.15
CONCRETE COLLAR
Ht = VARIES
0.40
S =1 : 24
S =1 : 24
PIPE DIA.
H
RCPC
ON FILL 1.80 ON FILL
ON FILL
H
FOUNDATION FILL,
t=0.15
0.19
MIN.
0.60
MIN.
0.60
0.15
SCALE: 1:80 MTS SLOPE 0.5 %
20.00 M. RROW
10.00 10.00
2.00 1.30 SHARED LANE INNER LANE INNER LANE SHARED LANE 1.30 2.00
CL
SIDEWALK BIKE LANE BIKE LANE SIDEWALK
0.50 0.19 SEE DETAIL "B" 0.15 0.15 0.15
LATERAL RCPC DRAINAGE CANAL
0.50 0.25
SEE DETAIL ON CONCRETE GUTTER
0.15
0.60
0.60
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
0.30
0.30
min.
min.
S =1 : 24
PIPE DIA.
S =1 : 24
Ht = VARIES
Ht = VARIES
ON FILL FLOW
D
D
ON FILL
RCPC
t
t
H
H
FOUNDATION FILL, t=0.15
DIA.
DIA.
D
D
INLET
0.10
OUTLET
t
t
CONCRETE COLLAR
0.30
0.30
MIN.
MIN.
0.60
0.60
ITEM 200 - AGGREGATE SUB BASE
ITEM 200 - AGGREGATE SUB BASE
COURSE t = 0.20 m. SEE DETAIL "Y"
COURSE t = 0.20 m.
ITEM 311(1) e1 - PORTLAND CEMENT CONCRETE ITEM 311(1) e1 - PORTLAND CEMENT CONCRETE X
PAVEMENT t = 0.28 m.(CARRIAGEWAY) ITEM 104 - EMBANKMENT
PAVEMENT t = 0.28 m.(CARRIAGEWAY)
B = 0.65 H (FROM ROADWAY EXCAVATION) B = 0.65 H
ITEM 104 - EMBANKMENT ITEM 200 - AGGREGATE SUB BASE SELECTED BORROW MIXED SAND
(FROM ROADWAY EXCAVATION) COURSE t = 0.20 m. & GRAVEL RIVER MIXED
SELECTED BORROW MIXED SAND & GRAVEL RIVER MIXED
ITEM 311(1) e1 - PORTLAND CEMENT CONCRETE SEE DETAIL ON DETAIL "Y"
GRAVEL BEDDING t= 0.15 m. PAVEMENT t = 0.28 m.(CARRIAGEWAY) CONCRETE
RC PIPE CULVERT LENGTH = VARIABLE MANHOLE/CATCH BASIN
LATERAL RCPC DRAINAGE CANAL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CROSS DRAINAGE RC PIPE CULVERT AND SECTIONS 6
BAUANG- SAN FERNANDO-SAN JUAN BY-PASS ROAD, PREPARED:
SAN FERNANDO CITY, LA UNION
TYPICAL ROADWAY SECTION CONSTRUCTION OF PCCP JOSE B. EGUILOS, JR ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III 9
(SAN FERNANDO-SAN JUAN SECTION), ON SUPER ELEVATION JOHN MICHAEL L. HIDALGO OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
PACKAGE 1, LA UNION CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION
ENGINEER II
SAN FERNANDO CITY, LA UNION DATE: DATE: DATE: DATE:
CL
20.00 M. RROW
10.00 10.00
1.90 1.30 SHARED LANE INNER LANE INNER LANE SHARED LANE 1.30 1.90 1.40
SIDEWALK BIKE LANE BIKE LANE SIDEWALK
20.0 MTS RROW
0.50
SEE DETAIL ON CONCRETE GUTTER
1
SL
1:
O
PE
PE
O
8% SLOPE 2.0 % 8%
1:
SL
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
1
1.50
0.65
0.65
0.50
0.40
0.80 0.80
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (CARRIAGEWAY) 1.80 SEE DETAIL ON SOLAR STREET LIGHT
ITEM 200 - AGGREGATE SUB BASE COURSE
ITEM 105 - SUB-GRADE PREPARATION
SEE DETAIL ON
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE CATCH BASIN/ MANHOLE
PAVEMENT, t= 0.28 m. (CARRIAGEWAY) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
ITEM 200 - AGGREGATE SUB BASE COURSE
C ITEM 200 - AGGREGATE SUB BASE COURSE
ITEM 105 L- SUB-GRADE PREPARATION
ITEM 105 - SUB-GRADE PREPARATION
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BEG. OF FLARING
TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDED AT
"T" (SEE DETAILS) THE END OF ANY RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED
FOR THIRTY (30) MINUTES OR LONGER. EDGE OF EXISTING CONCRETE PAVEMENT
ALL TRANSVERSE CONSTRUCTION JOINTS SHOULD BE BUTT
400
B LINE SHOWING TRANSVERSE OF PAVEMENT TO CLOSET FREE EDGE.
FLARING OF NEW CONC. PAVEMENT
WIDTH AS SHOWN ON PLANS
@38MM DIA.
S1, L=600MM SPACING 750 MM @16MM DIA. TRANSVERSE CONSTRUCTION JOINT WITHIN
THE MIDDLE THIRD OF THE SLAB
T/3
LANE SHOWING TRANSVERSE CONSTRUCTION EXISTING CONCRETE PAVEMENT EXISTING CONCRETE PAVEMENT E
11
JOINT AT MIDDLE THIRD OF NORMAL JOINT INTERVAL
375 375 S S S S S 375 375 S S S S S 375 375 S
T/3
11
S D 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
T/3
VARIABLE
25
75 25
FORMED GROOVE WITH KEYWAYS ON ALTERNATE END (SEE DETAIL "F") 12 O.C. TIE BARS
FIXED SLIDING
12 FILL WITH POURED JOINT FILLER
DEFORMED TIE BAR
T
5
25
Te/2
HALF OF THE BAR ON THE SIDE OF THE
T/4
T/3
T
METAL DOWEL CAP SHALL BE PAINTED
W/ RED LEAD AND THEN GREASED
T/3 T/3
25MM PRE-MOLDED
T
EXPANSION FILLER
SEE DETAIL "F"
FIRST SLAB 300 300
ON METAL CAP
600
300
600
300
DETAIL "C" EXISTING CONCRETE PAVEMENT
NEW PAVEMENT
C (EXPANSION JOINT)
16MMØ DRILLED HOLES FILLED
DETAIL "A" SCALE: 1:20 MTS WITH EPOXY RESIN
D+1.56
SCALE: 1:20 MTS
T
LEAD AND THEN GREASED. 260 500 750 250 32 300 BLACK IRON FREE FROM RUST AND LINKS.
270 500 750 7. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE
260 32 300
T/4
300 500 750 NOTE: CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
FIRST SLAB 310 400 750 DIAMETER AND SPACING OF PLAIN DOWEL BARS MAY BE PENETRATION ASPHALT SEAL ON CONCRETE PAVEMENT JOINTS SHALL BE POURED IN SUCH A
320 400 750 MODIFIED AS LONG AS THE EQUIVALENT STEEL AREA MANNER THAT SPILLING WILL BE PREVENTED THUS, PROVIDING A SMOOTH LEVELING/RIDING
300 300
IS SUSTAINED. SURFACE.
600 330 400 750 9. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT SHALL BE CONTINUOUS FORM EDGE TO
340 400 750 EDGE
BASED ON AASHTO GUIDE FOR DESIGN OF PAVEMENT STRUCTURES 1993.
DETAIL "D" 10.
11.
ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
D (BUTT TRANSVERSE CONSTRUCTION JOINTS) 12. AVOID STOPPAGE OF FORM WORKS ALONG CURVES.
STANDARD PORTLAND CEMENT CONCRETE PAVEMENT JOINTS 13. CONSTRUCT EXPANSION JOINT AT EVERY 60 METERS ANCHOR AT EVERY ADJACENT EXISTING
SCALE: 1:20 MTS STRUCTURES.
SCALE: AS SHOWN
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO
I ON
SS
AU
MI
80 80
COMMISSION ON AUDIT
DI
CO M
T
(PROVINCE AND CITY)
R EP
E S
U
I N
BL
I
P
C
P
50
I
L
F
T H I
E P H
Project: Cost:
210
WHITE BACKGROUND
Fund BLACK TEXT
Location: Source:
50
20
Implementing Agency:
50
HELVETICA 3"
2400 (8 ft)
1200 mm (4 ft.)
50 50
Contractor/Supplier:
LOCATION:
30
CONTRACT COST:
50
HELVETICA 1"
IMPLEMENTING OFFICE:
50
30
SOURCES OF FUND:
20 30 50
20 20
50 X 50
WOODEN STAKE 50 X 75 VERTICAL
COCO LUMBER
1000 1000
50 X 50
WOODEN STAKE
GROUND LEVEL 1000 1000
500 500
GROUND LEVEL
500 500
1000 2400