CONSTRUCTION OF INTERNAL ROADS AND INFRASTRUCTURE FOR 354 

RESIDENTIAL PLOTS IN SHAKHBOUT CITY, ABUDHABI

Technician‐ Electrical/Electrician
Tipper Truck/ Six wheel
Road marking machine
Sprayer‐ Prime Coat

Sprayer‐ Tack Coat

Roller Compactor

Welding machine

Jointer‐ Electrical
Vibratory Roller

Pulling machine

Grader Checker
Concrete mixer
Water Tanker

Mobile Crane
Double Drum

Water Pump

Laminator
Chainman

Carpenter

Steel fixer

Pipe fitter
Car Crane
Excavator

Surveyor
Foreman
Bob Cat
Grader

Labour
Mason
Shovel

Helper
Trailer
Dozer

Paver

Hi‐up
Unit of 

PTR
JCB
Description Production
measurement

Sewerage Network

Pipe Laying, Beding & Surround m 60 m/day 0.5 0.50 0.25 1.00 4.0 2.0 1.0

Construction  of Manholes Elements (Base, Liner and Shaft) Nos 0.5 0.5 0.5 0.5 0.50 0.25 2.0 2.0 1.0 3.0 1.0 1.0 1.0

Pipe Laying‐ NDM works m 18 m/day 0.5 0.50 0.25 1.00 4.0 2.0 1.0

Pipe Laying, Beding & Surround‐ House connection m 60 m/day 0.5 0.50 0.25 1.00 4.0 2.0 1.0

Sewer House Connection Chamber Nos 3 0.5 0.5 0.3 0.50 0.25 2.0 2.0 1.0 3.0 1.0 1.0 1.0

Storm Water Network

Construction of Manholes Elements (Base, Liner and Shaft) Nos 0.5 0.5 0.5 0.3 0.50 0.25 1.00 2.0 2.0 1.0 3.0 1.0 1.0 1.0

Pipe Laying, Beding & Surround m 60 m/day 0.5 0.50 0.25 1.00 4.0 2.0 1.0

Potable Water Network

Pipe Laying  DI Water line, Fittings, Beding & Surround m 78 m/ day 0.5 0.5 1.0 0.50 0.25 1.00 3.0 1.0 1.0

Construction of Valve Chamber Nos 0.5 0.3 0.50 0.25 1.00 2.0 2.0 1.0 3.0 1.0

Irrigation Works

Pipe Laying  m 20 0.5 0.5 0.25 1.0 3.0 1.0 1.0

Telephone Works

Laying Ducts & Surrounds m 400 m/day 0.5 0.5 0.3 0.50 0.25 1.00 1.0 3.0 1.0 1.0

Construction Chambers No 1.0 0.5 0.25 0.50 0.25 1.00 1.0 1.0 1.0 3.0 1.0

Street lighting and Power Package Works

Excavation for MV & LV Cables m 250 m/day 1.0 5.00

MV & LV Cable laying m 250 m/day 1.0 1.00 8.00

Sub Station‐ Erection of Wall Panels Sqm 100 1.0 1.00 5.00

Street light pole foundation Nos 5 1.0 1.0 1.0 1.00 2.00 1.00 5.00

Installation of Poles Nos 15 1.0 1.0 1.00 6.0


Excavation for Street light cables m 250 m/day 1.0 2.00

Street light Cable laying m 250 m/day 1.0 1.0 1.00 20.00

Earth works

Embankment m3 1,125 1.0 1.0 1.0 1.0 10.0 0.50 0.50 1.0 3.0 1.0

Aggregate Sub‐base Course (30 cm) m2 1,500 1.0 2.0 1.0 0.5 10.0 0.50 0.50 1.0 3.0

Aggregate Sub‐base Course (20 cm) m2 2,250 1.0 2.0 1.0 0.5 10.0 0.50 0.50 1.0 3.0

Aggregate Sub‐base Course (15 cm) m2 3,000 1.0 2.0 1.0 0.5 10.0 0.50 0.50 1.0 3.0

Road works

Asphalt Base Course (9 cm) m2 3,300 1.0 2.0 1.0 0.5 6.0 0.50 0.50 1.0 4.0

Asphalt Base Course (6 cm) m2 4,400 1.0 2.0 1.0 0.5 8.0 0.50 0.50 1.0 4.0

Prime Coat kg 1,964 1.0 1.0 0.50 0.50 0.50 2.0 1.0

Asphalt Binder Course (6 cm) m2 4,400 1.0 2.0 1.0 0.5 8.0 0.50 0.50 1.0 4.0

Tack Coat kg 1,463 1.0 1.0 0.50 0.50 0.50 2.0 1.0

Asphalt Wearing Course (5cm) m2 4,950 1.0 2.0 1.0 0.5 8.0 0.50 0.50 1.0 4.0

Road Marking m 1,000 1.0 0.50 0.50 4.0 2.0

Kerbstone fixing m 250 0.25 0.25 2.0 2.0

Interlocking tiles Sqm 400 1.0 0.5 0.5 1.0 3.0

Installation of Traffic signs Sqm 50 0.5 0.5 0.5 4.0 2.0

Metal works

Installation of Bollards Nos 50 0.5 4.0 2.0