PROJECT : PROPOSED TWO STOREY TOWNHOUSE (P-3)

LOCATION : HILLTOWN RESIDENCES, MARIKINA CITY


OWNER : GSI CONSTRUCTION COMPANY

TENTAVIVE WORK SCHEDULE


ITEM ACTIVITY DESCRIPTION 1st MONTH 2nd MONTH 3rd MONTH
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4
A. SITE PREPARATION M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S M T W TH F S
Clearing
Weeding / Dredging / Cleaning
Initial Structures
Bunkhouse
Storage
Layout
Batterboard
B. FOUNDATION
Column Footing
Column Footing Excavation
CF Backfilling
Wall Footing (WF)
WF Excavation
WF Backfilling
C. STEEL WORKS
Column Footing
Column Footing Steel Fabrication
Wall Footing (WF)
WF Steel Assembly
Columns
GF Column Steel Fabrication
2F Column Steel Assembly
Beams
2F Beam Steel Assembly
Roof Beam Steel Assembly
Slabs
GF Slab Steel Assembly
2F Slab Steel Assembly
Stairs
Stair Footing Assembly
Stair Steel Assembly
Roofing
Roof Framing
D. MASONRY WORKS
Masonry (Rough)
CHB Walls
GF Chb Laying
2F Chb Laying
Rafter Wall Chb Laying
Firewall Chb Laying
Masonry (Finish)
Plastering
GF Plastering
2F Plastering
Rafter Wall Plastering
Firewall Plastering
Exterior Plastering
Tileworks
T&B
Bedrooms
Balcony (if applicable)
Living / Dining / Kitchen
E. CARPENTRY WORKS
Carpentry (Rough)
Column
GF Column Formworks
GF Column Form Stripping
2F Column Formworks
2F Column Form Stripping
Scaffolding
GF Scaffolding
2F Scaffolding
Beams
2F Beam Formworks
2F Beam Form Stripping
Roof Beam Formworks
Roof Beam Form Stripping
Slabs
2F Slab Formworks
2F Slab Form Stripping
Stairs
Stair Formworks
Stair Form Stripping
Jambs
Door Jamb Fabrication
Door Jamb Installation
Carpentry (Finish)
Ceiling
Ceiling Joist Installation
Ceiling Boards Installation
Dry Wall
Dry Wall Framing Installation
Dry Wall Boards Installation
Cabinets
Bedrooms Cabinet
Kitchen Cabinet
Stairs
Stair Steps Installation
Doors
Door Installation
F. CONCRETE WORKS
Column Footing
Column Footing Concreting
Wall Footing (WF)
WF Steel Concreting
Columns
GF Column Concreting
2F Column Concreting
Beams
2F Beams Concreting
Roof Beams Concreting
Slabs
GF Slab Concreting
2F Slab Concreting
Stairs
Stair Footing Concreting
Stair Concreting
G. METAL WORKS
Steel Windows
Steel Window Fabrication
Steel Window Installation
Railings
Stair Railing Assembly
Balcony Railing Assembly
Gates
Steel Gate Fabrication
Steel Gate Installation
H. PLUMBING
Plumbing (Rough)
Sanitary Line
Water Line
Sewer Line
Plumbing (Finish)
Plumbing Fixtures Installation
I. ELCTRICAL
Preliminaries
Litghings
Outlets
Finishes
Panel Box Installation
Litghings Fixtures Installation
Switches/Outlet Installation
J. PAINTING
Preliminaries
Walls
Neutralizer Application
Konkreation (1st Coat)
Sanding
Konkreation (2nd Coat)
Cabinet
Sanding
Putty Application
Doors and Windows
Sanding
Putty Application Project End Date
Finishes
First Coating
Final Coating

ROUGHING FINISHING PAINTING

PREPARED BY :

Jose B. Santos Jr.


PROJECT : PROPOSED TWO STOREY TOWNHOUSE (P-3)
LOCATION : HILLTOWN RESIDENCES, MARIKINA CITY
OWNER : GSI CONSTRUCTION COMPANY

TENTATIVE WORK SCHEDULE


ITEM ACTIVITY DESCRIPTION 2nd MONTH 3rd MONTH
WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4
A. SITE PREPARATION
M T W TH F S M T W TH F S M T W TH F S
Clearing
Weeding / Dredging / Cleaning
Initial Structures
Bunkhouse
Storage
Layout
Batterboard
B. FOUNDATION
Column Footing
Column Footing Excavation
CF Backfilling
Wall Footing (WF)
WF Excavation
WF Backfilling
C. STEEL WORKS
Column Footing
Column Footing Steel Fabrication
Wall Footing (WF)
WF Steel Assembly
Columns
GF Column Steel Fabrication
2F Column Steel Assembly
Beams
2F Beam Steel Assembly
Roof Beam Steel Assembly
Slabs
GF Slab Steel Assembly
2F Slab Steel Assembly
Stairs
Stair Footing Assembly
Stair Steel Assembly
Roofing
Roof Framing
D. MASONRY WORKS
Masonry (Rough)
CHB Walls
GF Chb Laying
2F Chb Laying
Rafter Wall Chb Laying
Firewall Chb Laying
Masonry (Finish)
Plastering
GF Plastering
2F Plastering
Rafter Wall Plastering
Firewall Plastering
Exterior Plastering
Tileworks
T&B
Bedrooms
Balcony (if applicable)
Living / Dining / Kitchen
E. CARPENTRY WORKS
Carpentry (Rough)
Column
GF Column Formworks
GF Column Form Stripping
2F Column Formworks
2F Column Form Stripping
Scaffolding
GF Scaffolding
2F Scaffolding
Beams
2F Beam Formworks
2F Beam Form Stripping
Roof Beam Formworks
Roof Beam Form Stripping
Slabs
2F Slab Formworks
2F Slab Form Stripping
Stairs
Stair Formworks
Stair Form Stripping
Jambs
Door Jamb Fabrication
Door Jamb Installation
Carpentry (Finish)
Ceiling
Ceiling Joist Installation
Ceiling Boards Installation
Dry Wall
Dry Wall Framing Installation
Dry Wall Boards Installation
Cabinets
Bedrooms Cabinet
Kitchen Cabinet
Stairs
Stair Steps Installation
Doors
Door Installation
F. CONCRETE WORKS
Column Footing
Column Footing Concreting
Wall Footing (WF)
WF Steel Concreting
Columns
GF Column Concreting
2F Column Concreting
Beams
2F Beams Concreting
Roof Beams Concreting
Slabs
GF Slab Concreting
2F Slab Concreting
Stairs
Stair Footing Concreting
Stair Concreting
G. METAL WORKS
Steel Windows
Steel Window Fabrication
Steel Window Installation
Railings
Stair Railing Assembly
Balcony Railing Assembly
Gates
Steel Gate Fabrication
Steel Gate Installation
H. PLUMBING
Plumbing (Rough)
Sanitary Line
Water Line
Sewer Line
Plumbing (Finish)
Plumbing Fixtures Installation
I. ELCTRICAL
Preliminaries
Litghings
Outlets
Finishes
Panel Box Installation
Litghings Fixtures Installation
Switches/Outlet Installation
J. PAINTING
Preliminaries
Walls
Neutralizer Application
Konkreation (1st Coat)
Sanding
Konkreation (2nd Coat)
Cabinet
Sanding
Putty Application
Doors and Windows
Sanding
Putty Application Project End Date
Finishes
First Coating
Final Coating

ROUGHING FINISHING PAINTING

PREPARED BY :

Jose B. Santos Jr.


PROJECT : PROPOSED TWO STOREY TOWNHOUSE (P-3)
LOCATION : HILLTOWN RESIDENCES, MARIKINA CITY
OWNER : GSI CONSTRUCTION COMPANY

TENTAVIVE WORK SCHEDULE


ITEM ACTIVITY DESCRIPTION 1st MONTH 2nd MONTH 3rd MONTH
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4
A. SITE PREPARATION
Clearing
Weeding / Dredging / Cleaning 1
Initial Structures
Bunkhouse 1
Storage 1
Layout
Batterboard 1 1
B. FOUNDATION
Column Footing
Column Footing Excavation 1 1 1
CF Backfilling 1
Wall Footing (WF)
WF Excavation 1 1
WF Backfilling 1
C. STEEL WORKS
Column Footing
Column Footing Steel Fabrication 1 1
Wall Footing (WF)
WF Steel Assembly 1 1
Columns
GF Column Steel Fabrication 1 1
2F Column Steel Assembly
Beams
2F Beam Steel Assembly 1 1 1
Roof Beam Steel Assembly 1 1 1
Slabs
GF Slab Steel Assembly 1 1 1
2F Slab Steel Assembly 1 1
Stairs 1 1
Stair Footing Assembly
Stair Steel Assembly 1 1 1
Roofing
Roof Framing 1 1 1
D. MASONRY WORKS
Masonry (Rough)
CHB Walls
GF Chb Laying 1 1 1 1 1
2F Chb Laying 1 1 1
Rafter Wall Chb Laying 1 1
Firewall Chb Laying 1 1
Masonry (Finish)
Plastering
GF Plastering 1 1 1 1 1
2F Plastering 1 1 1 1 `
Rafter Wall Plastering 1 1 1 1 `
Firewall Plastering 1 1 1 1
Exterior Plastering 1 1 1 1 1 1 1 1 1
Tileworks
T&B 1 1 1 1 1
Bedrooms 1 1 1 1 1
Balcony (if applicable) 1 1
Living / Dining / Kitchen 1 1 1 1 1 1
E. CARPENTRY WORKS
Carpentry (Rough)
Column
GF Column Formworks 1 1 1 1 1
GF Column Form Stripping 1 1 1 1
2F Column Formworks 1 1 1
2F Column Form Stripping 1
Scaffolding
GF Scaffolding 1 1 1
2F Scaffolding 1 1 1
Beams
2F Beam Formworks 1 1 1
2F Beam Form Stripping 1 1
Roof Beam Formworks 1 1 1
Roof Beam Form Stripping 1 1
Slabs
2F Slab Formworks 1 1
2F Slab Form Stripping 1
Stairs
Stair Formworks 1 1 1
Stair Form Stripping 1
Jambs
Door Jamb Fabrication 1 1
Door Jamb Installation 1 1 1
Carpentry (Finish)
Ceiling
Ceiling Joist Installation 1 1 1
Ceiling Boards Installation 1 1 1
Dry Wall
Dry Wall Framing Installation 1 1 1
Dry Wall Boards Installation 1 1 1 1
Cabinets 1 1 1 1
Bedrooms Cabinet 1 1 1 1 1 1 1 1
Kitchen Cabinet 1 1 1 1 1
Stairs
Stair Steps Installation 1 1 1
Doors
Door Installation 1 1 1
F. CONCRETE WORKS
Column Footing
Column Footing Concreting 1 1
Wall Footing (WF)
WF Steel Concreting 1 1
Columns
GF Column Concreting 1 1 1 1 1
2F Column Concreting 1 1
Beams
2F Beams Concreting 1 1 1
Roof Beams Concreting 1 1
Slabs
GF Slab Concreting 1 1 1
2F Slab Concreting 1 1
Stairs
Stair Footing Concreting 1
Stair Concreting 1 1
G. METAL WORKS
Steel Windows
Steel Window Fabrication 1 1 1 1 1 1
Steel Window Installation 1 1 1 1 1
Railings
Stair Railing Assembly 1 1 1 1
Balcony Railing Assembly 1 1 1
Gates
Steel Gate Fabrication 1 1 1 1 1
Steel Gate Installation 1 1 1
H. PLUMBING
Plumbing (Rough)
Sanitary Line 1 1 1 1 1 1
Water Line 1 1 1 1 1 1
Sewer Line 1 1 1 1 1 1 1
Plumbing (Finish) 1 1 1
Plumbing Fixtures Installation 1 1
I. ELCTRICAL
Preliminaries
Litghings 1 1 1 1 1 1 1
Outlets 1 1 1 1 1 1 1 1
Finishes
Panel Box Installation
Litghings Fixtures Installation 1 1 1
Switches/Outlet Installation 1 1 1
J. PAINTING
Preliminaries
Walls
Neutralizer Application 1 1 1
Konkreation (1st Coat) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sanding 1 1 1 1 1 1
Konkreation (2nd Coat) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Cabinet
Sanding 1 1 1 1 1 1 1 1
Putty Application 1 1 1 1 1 1 1 1 1 1
Doors and Windows
Sanding 1 1 1 1
Putty Application 1 1 1 1 Project End Date
Finishes
First Coating 1 1 1 1 1 1 1 1 1 1 1
Final Coating 1 1 1 1 1 1 1 1 1 1 1 1

1% 1% 2% 4% 4% 5% 6% 8% 10% 11% 12% 13% 15% 17% 18% 20% 22% 23% 25% 27% 29% 30% 32% 35% 37% 39% 41% 43% 43% 44% 45% 46% 47% 49% 51% 54% 55% 57% 59% 62% 64% 67% 69% 71% 74% 75% 77% 79% 81% 83% 85% 86% 87% 88% 88% 89% 90% 91% 92% 93% 94% 95% 96% 97% 98% 98% 99% 99% 99% 99% 100% 100%

PREPARED BY :

Jose B. Santos Jr.


area price/sq.m. amount qty total retention 0.65
79 12,000.00 948,000.00 x2 1,896,000.00 10%

may 15 10 % 189,600.00 18,960.00 170,640.00 110,916.00


may 30 15 % 284,400.00 28,440.00 255,960.00 166,374.00
june 15 15 % 284,400.00 28,440.00 255,960.00 166,374.00
june 30 15 % 284,400.00 28,440.00 255,960.00 166,374.00
july 15 15 % 284,400.00 28,440.00 255,960.00 166,374.00
july 30 15 % 284,400.00 28,440.00 255,960.00 166,374.00
aug 15 15 % 284,400.00 28,440.00 255,960.00 166,374.00
100 %
1,706,400.00
0.35 65 35 THEORETICAL
616,200.00 331,800.00 420,000.00

72,095.40 60,000.00 47,400.00 23,700.00


108,143.10 60,000.00 47,400.00 23,700.00
108,143.10 60,000.00 47,400.00 23,700.00
108,143.10 60,000.00 47,400.00 23,700.00
108,143.10 60,000.00 47,400.00 23,700.00
108,143.10 60,000.00 47,400.00 23,700.00
108,143.10 60,000.00 47,400.00 23,700.00
PROJECT : PROPOSED TWO STOREY TOWNHOUSE
LOCATION : HILLTOWN RESIDENCES, MARIKINA CITY
OWNER : GSI CONSTRUCTION COMPANY
TENTAVIVE WORK SCHED

ITEM ACTIVITY DESCRIPTION 1st MONTH

WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1


A. SITE PREPARATION
Clearing
Weeding / Dredging / Cleaning
Initial Structures
Bunkhouse
Storage
Fence
Utilities
Temp Water
Temp Electricity
Layout
Batterboard
B. FOUNDATION
Column Footing
Column Footing Excavation
CF Backfilling
Wall Footing (WF)
WF Excavation
WF Backfilling
C. STEEL WORKS
Column Footing
Column Footing Steel Fabrication
Wall Footing (WF)
WF Steel Assembly
Columns
GF Column Steel Fabrication
2F Column Steel Assembly
Beams
2F Beam Steel Assembly
Roof Beam Steel Assembly
Slabs
GF Slab Steel Assembly
2F Slab Steel Assembly
Stairs
Stair Footing Assembly
Stair Steel Assembly
Roofing
Roof Framing
D. MASONRY WORKS
Masonry (Rough)
CHB Walls
GF Chb Laying
2F Chb Laying
Rafter Wall Chb Laying
Firewall Chb Laying
Masonry (Finish)
Plastering
GF Plastering
2F Plastering
Rafter Wall Plastering
Firewall Plastering
Exterior Plastering
Tileworks
T&B
Bedrooms
Balcony (if applicable)
Living / Dining / Kitchen
E. CARPENTRY WORKS
Carpentry (Rough)
Column
GF Column Formworks
GF Column Form Stripping
2F Column Formworks
2F Column Form Stripping
Scaffolding
GF Scaffolding
2F Scaffolding
Beams
2F Beam Formworks
2F Beam Form Stripping
Roof Beam Formworks
Roof Beam Form Stripping
Slabs
2F Slab Formworks
2F Slab Form Stripping
Stairs
Stair Formworks
Stair Form Stripping
Jambs
Door Jamb Fabrication
Door Jamb Installation
Carpentry (Finish)
Ceiling
Ceiling Joist Installation
Ceiling Boards Installation
Dry Wall
Dry Wall Framing Installation
Dry Wall Boards Installation
Cabinets
Bedrooms Cabinet
Kitchen Cabinet
Stairs
Stair Steps Installation
Doors
Door Installation
F. CONCRETE WORKS
Column Footing
Column Footing Concreting
Wall Footing (WF)
WF Steel Concreting
Columns
GF Column Concreting
2F Column Concreting
Beams
2F Beams Concreting
Roof Beams Concreting
Slabs
GF Slab Concreting
2F Slab Concreting
Stairs
Stair Footing Concreting
Stair Concreting
G. METAL WORKS
Steel Windows
Steel Window Fabrication
Steel Window Installation
Railings
Stair Railing Assembly
Balcony Railing Assembly
Gates
Steel Gate Fabrication
Steel Gate Installation
H. PLUMBING
Plumbing (Rough)
Sanitary Line
Water Line
Sewer Line
Plumbing (Finish)
Plumbing Fixtures Installation
I. ELCTRICAL
Preliminaries
Litghings
Outlets
Finishes
Panel Box Installation
Litghings Fixtures Installation
Switches/Outlet Installation
J. PAINTING
Preliminaries
Walls
Neutralizer Application
Konkreation (1st Coat)
Sanding
Konkreation (2nd Coat)
Cabinet
Neutralizer Application
Sanding
Putty Application
Doors and Windows
Neutralizer Application
Sanding
Putty Application
Finishes
First Coating
Final Coating
K. MISCELLANEOUS WORKS
Waterproofing
T&B
Firewall

ROUGHING FINISHING PAINTING


E WORK SCHEDULE

2nd MONTH 3rd MONTH

WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4


` `
` `
4th MONTH 5th MONTH

WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2


5th MONTH 6th MONTH X MONTH

WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1


Project End Date