G - GENERAL NOTES : PP - PROPRIETARY PRODUCTS : R.6. WHERE REINFORCEMENT IS ASSIGNED WITH LAYER NUMBERS, LAYER ONE IS THAT NEAREST TO THE FACE OF
si
01
on & Ver
THE CONCRETE.
01.
GN.1. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH NETWORK RAIL SPECIFICATION PP.1. PROPRIETARY ITEMS SHALL BE APPROVED BY THE ARE (ALLIANCE RESPONSIBLE ENGINEER).
NR/L3/CIV/140 MODEL CLAUSES FOR SPECIFYING CIVIL ENGINEERING WORKS. UNLESS SPECIFIED R.7. REINFORCEMENT SHALL BE ACCURATELY LOCATED AND MAINTAINED IN POSITION BOTH VERTICALLY AND
B01.
si
OTHERWISE IN PROJECT DOCUMENTS. PP.2. WHERE OUTLINES OF PROPRIETARY PRODUCTS ARE SHOWN ON THE DRAWINGS TO CLARIFY REQUIREMENTS, SUCH HORIZONTALLY. FIXINGS SHALL BE SUFFICIENT TO PREVENT SAG OR DISPLACEMENT OF REINFORCEMENT,
DETAILS ARE INDICATIVE ONLY. BARS MAY BE ADJUSTED LOCALLY TO ACCOMMODATE GLOSSARY OF TERMS:-
Revi
GN.2. FORM 3 FOR TEMPORARY WORKS TO BE SUBMITTED BY THE CONTRACTORS TEMPORARY WORKS DUCT HOLES.
CRE TO THE NETWORK RAIL PE (B&C), AS PER ENGINEERING ASSURANCE OF BUILDING AND CIVIL PP.3. BEFORE PROPRIETARY ITEMS ARE INCORPORATED IN THE WORKS THE CONTRACTOR SHALL SUBMIT HIS DETAILED CCTV - CLOSED CIRCUIT TELEVISION
ENGINEERING WORKS NR/L2/CIV/003 CLAUSE 5.6 SECOND PARAGRAPH. INSTALLATION PROPOSALS TO THE CRE (CONTRACTOR'S RESPONSIBLE ENGINEER) / ARE FOR APPROVAL. R.8. STAINLESS STEEL TYING WIRE SHALL BE USED FOR ALL REINFORCEMENT. CP - CATCH PIT
EJ - EXPANSION JOINT
GN.3. THE PRINCIPAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL MATERIALS USED PP.4. WHERE PROPRIETARY PRODUCTS ARE SPECIFIED, THE CONTRACTOR MAY SUBSTITUTE ALTERNATIVE MATERIALS WITH R.9. WHERE CONCRETE IS NOT POURED AGAINST BLINDING OR FORMWORK COVER TO BE INCREASED BY 40mm. EX - EXISTING
ARE APPROVED BY NETWORK RAIL. EQUAL PERFORMANCE, DIMENSIONS AND SPECIFICATIONS, PROVIDED THAT HE GAINS APPROVAL FROM THE FW - FOUL WATER
ARCHITECT/ENGINEER FOR SUCH SUBSTITUTION.
000010
G - GULLY (DRAINAGE)
GN.4. EXISTING SERVICES TO BE MOVED OR PROTECTED AS REQUIRED. DETAILS OF FP - FIRE PROTECTION: IC - INSPECTION CHAMBER
ALL SERVICES AND DIVERSIONS ARE AS SHOWN ON DRAWINGS.
H - HANDRAILS / GUARDRAILS / FENCE :
FP.1. THE FIRE RESISTANCE TO THE WINSLOW STATION SHALL BE AS PER FIRE STRATEGY REPORT, LC/LP - LIGHTING COLUMN (LAMP POST)
H.1. HANDRAILS / GUARDRAILS / FENCE TO BE AS PER ARCHITECTURAL SPECIFICATION U.N.O. 133735_2B-EWR-WIW-XX-RP-YF-030001. MH - MANHOLE
GN.5. PRIOR TO ANY EXCAVATION OR GROUND DISTURBANCE THE PRESENCE OF ALL SERVICES PCC - PRE-CAST CONCRETE
CS-
(INCLUDING BURIED SERVICES SHALL BE IDENTIFIED FROM SERVICES SEARCH DRAWINGS AND THE H.2. HANDRAIL FABRICATION AND HOLDING DOWN DETAILS TO BE SUPPLIED TO THE ENGINEER IN CHARGE FOR APPROVAL AT FP.2. THE FIRE RESISTANCE TO A CONCRETE ELEMENT WILL BE PROVIDED BY THE CONCRETE COVER SP - SIGNAL POST
USE OF A NETWORK RAIL APPROVED CABLE AVOIDANCE TOOL (CAT). LEAST 4 WEEKS PRIOR TO FABRICATION. EN1992-1-2:2004+A1:2019, THIS WILL ENSURE THAT THE ELEMENT POSSESSES THE THE APPROPRIATE DEGREE TOF - TOP OF FOUNDATION
UC - UNIVERSAL COLUMN
DR-
STEELWORK WITH AN INTUMESCENT PAINT, ENCASING IN CONCRETE OR PROVIDING BOARDING TO THE THK. - THICK
GN7. THE STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE DESIGNATION (II) TO BS 5628 (1:4 CEMENT : SAND), ACCELERATORS ARE NOT TO BE USED.
STRUCTURE OF SUFFICIENT THICKNESS IN ORDER TO ACHIEVE THE DESIRED FIRE RATING. U.N.O. - UNLESS NOTED OTHERWISE
ARCHITECTURAL,MECHANICAL,ELECTRICAL,PUBLIC HEALTH, DRAINAGE, TELECOMS, EARTHWORKS CRS. - CENTRES
W-
O/A - OVERALL
GN8. ALL ELEMENTS OF THE STRUCTURE DESIGNED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE S.O.P. - SETTING OUT POINT
ENGINEER FOR COMMENTS / APPROVAL. SC.3. ALL SPECIFIED MANUFACTURERS MATERIALS NOTED ON THE DRAWINGS SHOULD BE INTERPRETED TO BE "OR SIMILAR DL.1. THE DESIGN LIFE OF THE PROPOSED STATION BUILDING, PLATFORM AND LIFT/LIFT LOBBY/FOOTBRIDGE
EW R-
DIMENSIONAL TOLERANCES SHALL BE IN ACCORDANCE WITH BS EN 13670 UNLESS STATED PIPE SLEEVES, ELECTRICAL CONDUITS AND OTHER ITEMS TO BE EMBEDDED IN CONCRETE OR OTHERWISE SUIT THE GRADE OF STEEL, IN SOME INSTANCES THIS MAY REQUIRE CHEMICAL ANALYSIS OF STEEL SAMPLES
Dr
OTHERWISE. INCORPORATED IN STRUCTURAL WORK SHALL BE CHECKED BY CONTRACTOR SUBJECTED TO ENGINEER IN CHARGE TAKEN FROM SITE.
APPROVAL.
S.2. ALL STEELWORK IS TO CONFIRM TO THE REQUIREMENTS OF BS EN 1993-1-1:2005+A1:2014, BS EN
L.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
1993-1-5:2006+A2:2019, BS EN 1993-1-8:2005, BS EN 1993-1-10:2005, BS EN 1993-5:2007,BS EN 1090-2:2018
SC.7. WATER CURING SHALL BE USED FOR CURING OF ALL REINFORCED CONCRETE AND UNREINFORCED CONCRETE
AND BS EN 10025-1:2004, BS EN 10025-2:2019 OR BS EN 10210-1:2006, BS EN 10210-2:2019 AS APPROPRIATE.
L.3. CHAINAGES ARE IN METRES AND ARE MEASURED ALONG THE PROJECT ELEMENTS OF STRUCTURES.
CHAINAGE CENTRELINE.
S.3. CONNECTIONS SHALL BE DESIGNED FOR A MINIMUM ULTIMATE REACTION OF 75KN IN ANY DIRECTION UNLESS
SC.8. ALL BURIED CONCRETE SURFACE TO HAVE BITUMEN COATING.
NOTED OTHERWISE.
L.4. ALL LEVELS ARE IN METRES. AND ANGLES ARE IN DEGREES.
SC.9. CLEANING:
S.4. THE FABRICATOR SHOULD ALLOW FOR ANY SPLICES, TEMPORARY BRACING ETC. THAT ARE NECESSARY TO
L.5. DO NOT SCALE THE DRAWINGS, USE WRITTEN DIMENSIONS ONLY.
SUIT THE ERECTION PROCEDURE. ALL COSTS TO BE PRODUCED BY THE FABRICATOR AND INCLUDED WITHIN
CLEAN ALL DELETERIOUS MATERIALS FROM CONCRETE SURFACES AND ADJACENT MATERIALS IMMEDIATELY.
THE TENDER PRICE.
L.6. TRACK GEOMETRY TAKEN FROM GRIP 5 DESIGN MODEL No. 133735_2B-EWR-OXD-XX-M3-RP-000208
(REV. No. B02.02) OF THE PERMANENT WAY DESIGN ALIGNMENT. PROTECT ADJACENT WORK FROM STAINING OR DAMAGE DUE TO CLEANING OPERATIONS.
S.5. ALL TUBULAR MEMBERS SHALL, UNLESS NOTED OTHERWISE, BE SEALED AT EACH END WITH A 10mm CAP PLATE
CONNECTED BY FILLET WELD. WHERE HOLLOW MEMBERS ARE TO BE GALVANISED, VENT HOLES SHALL BE
L.7. ALL SETTING OUT DETAILS OF STRUCTURAL ELEMENTS SHALL BE FROM AECOSIM 3D STRUCTURAL DO NOT USE CLEANING MATERIALS OR PROCESSES THAT COULD CHANGE THE APPEARANCE OF EXPOSED CONCRETE
PROVIDED.
MODEL. FINISHES OR DAMAGE ADJACENT MATERIALS.
E - EARTHWORKS/GENERAL EXCAVATION: S.6. ANY STEELWORK BURIED BELOW GROUND LEVEL IS TO BE ENCASED IN MINIMUM 50mm OF DENSE CONCRETE.
SC.10. SURFACES WHICH ARE WATERPROOFED OR COATED WHICH SHALL BE IN CONTACT WITH BACKFILL MATERIALS SHALL
BE PROTECTED FROM DAMAGE BY APPROPRIATE BOARDS OF PLASTIC SHEETINGS.
S.7. GROUT AROUND FOUNDATION BOLTS AND UNDER COLUMN BASE PLATES IS TO HAVE A MINIMUM
E.1. ALL EARTHWORK SHALL COMPLY WITH THE CONTRACT SPECIFICATION - PARTICULAR CHARACTERISTIC CUBE STRENGTH AS DEFINED IN BS 8500-2:2015+A2:2019 AT 28 DAYS OF NOT LESS THAN
SC.11. COVERS TO REINFORCEMENT FOR DIFFERENT ELEMENTS ARE AS GIVEN BELOW: 2
SPECIFICATION FOR EARTHWORKS AND PARTICULAR REQUIREMENTS NOTED BELOW. 50N/mm NON-SHRINK GROUT SUCH AS CONBEXTRA GP BY FOSROC LTD. OR SIMILAR SHALL BE USED.
E.2. ALL EARTHWORK FILL MATERIALS REQUIRED SHALL BE SELECTED GRANULAR FILL CLASS 6N IN S.8. ALL BOLTS TO BE GRADED 8.8 IN ACCORDANCE WITH BS 4190:2014 MINIMUM M16 UNO.
ACCORDANCE WITH PROJECT SPECIFICATION.
CONCRETE COVER, Cnom ( in mm) S.9. ALL CONNECTION WELDS TO BE CONTINUOUS FILLET WELDS MINIMUM 8mm UNLESS NOTED OTHERWISE.
E.3. CLASS 6N FILL MATERIAL SHALL BE PLACED AND COMPACTED IN LAYERS OF MAX. 150mm. ELEMENTS REMARKS
GRADE
TOP BOTTOM SIDES
EXCAVATION SLOPES SHALL BE BENCHED PRIOR TO BACK FILLING. S.10. ALL WELDS TO BE IN ACCORDANCE WITH BS EN 1011-1:2009.
PILE C32/40 75mm ALL SIDES
E.4. EXPOSED FORMATIONS SHALL BE INSPECTED BY A DESIGNER'S SITE REPRESENTATIVE. S.11. ALL EDGES TO STEEL WORK, EXCEPT ROLLED EDGES, ARE TO BE 3mm RADIUS UNLESS STATED OTHERWISE.
PILE CAP C32/40 50 50 50
E.5. EXCAVATIONS SHALL BE KEPT DRAINED OF SURFACE AND GROUND WATER AT ALL TIMES. S.12. ALL STEELWORK TO RECEIVE FULL N1 PROTECTIVE TREATMENT WITH MINIMUM 25 YEARS SERVICE LIFE IN
RAFT SLABS / PAD FOUNDATION / LIGHTING COLUMN ACCORDANCE WITH NR/L3/CIV/039 AND NR/GN/CIV/002. EXCEPT WHERE SHOWN OTHERWISE. FINISHED COLOUR
E.6. THE PERIMETER OF ANY EXCAVATION ZONES SHALL BE RETAINED BY A SOIL RETENTION SYSTEM FOUNDATION / TOTEM FOUNDATION / BUS SHELTER C32/40 50 50 50 SHALL BE HOLLY GREEN (REF 14 C39) TO BS 4800 (TBC AT GRIPS). FINISHED COLOUR TO HANDRAILS SHALL BE
COLUMN FOUNDATION / FENCE FOUNDATION
WHICH SHALL BE DRAINED, INSTALLED, MAINTAINED AND REMOVED BY THE CONTRACTOR. THE WHITE (REF 00E55) TO BS 4800, CORROSION CATEGORY TO BS EN ISO 12944 IS TO BE C3.
STRONGUARD FOUNDATION / CYCLE SHELTER
CONTRACTOR SHALL PROVIDE ALL MEASURES AND PRECAUTIONS NECESSARY TO PREVENT
DAMAGE AND MINIMIZE SETTLEMENT OF EXISTING OR NEW CONSTRUCTION INSIDE OR OUTSIDE RC PEDESTAL / UPSTAND WALL C32/40 50 50 50 S.13. STEEL GRADE TO BE AS FOLLOWS:
THE PROJECT BOUNDARY. ANY DAMAGE TO NEW OR EXISTING CONSTRUCTION INSIDE OR
OUTSIDE THE PROJECT BOUNDARY CAUSED BY CONSTRUCTION TECHNIQUES OR MOVEMENT OF 50mm FOR SURFACE ALL STEEL SECTIONS AND STEEL PLATES TO BE 'HOT FINISHED' STEEL GRADE S355 J2H TO BS EN 10025-1:2004,
LIFT/LMR WALL / SHEET PILE CAPPING BEAM C32/40 50 50 50 EXPOSED TO SOIL
THE SOIL RETENTION SYSTEM IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. BS EN 10025-2:2019 AND BS EN 10210-1:2006, BS EN 10210-2:2019.
E.7. BEFORE PROCEEDING WITH THE INSTALLATION OF ANY EXCAVATION RETENTION SYSTEMS THE SME WALKWAY SLAB AND MAINTENANCE WALKWAY C32/40 60 50 50 ALL RHS/SHS/CHS SECTIONS TO BE FULLY WELDED AND SEALED AGAINST INGRESS. HOLES FOR BOLT FIXINGS
CONTRACTOR SHALL BE DEEMED TO HAVE TAKEN INTO ACCOUNT ALL RELEVANT EXISTING ETC., ARE NOT PERMITTED.
BLINDING CONCRETE FND4
RECORDS OF FOUNDATIONS, UTILITY LINES, GEOTECHNICAL REPORTS, DRAWINGS AND
SPECIFICATIONS. ALL EXCAVATION RETENTION SYSTEMS SHALL BE COORDINATED WITH THE SME LANDING SLAB C32/40 50 50 50 THE STEEL WORK MANUFACTURING DIMENSIONS SHOWN ARE SPECIFIED FOR A MEAN TEMPERATURE OF 12°C.
ELEMENTS OF PERMANENT CONSTRUCTION/UTILITIES AND RAILROAD FACILITIES.
BOTTOM OF ALL SUPPORT STEELWORK TO BE MIN 150 ABOVE GROUND LEVEL ON RC PLINTH OR SIMILAR.
E.8. ALL EXCAVATIONS SHOULD TAKE ACCOUNT OF THE POSSIBILITY OF UNRECORDED AND UNKNOWN
BURIED SERVICES, DRAINS, VENTILATION DUCTS AND THE LIKE.
E.9. THE CONTRACTOR SHALL PROVIDE SURFACE DRAINAGE CHANNELS AND SUMP PUMPS TO
B - BOLTS:
PROTECT ALL EXCAVATIONS FROM FLOODING. FLOODING OF ANY EXCAVATION AFTER APPROVAL TW - TEMPORARY WORKS: B.1. ALL NON PRE - LOADED BOLTS ARE TO BE GRADE 8.8 IN ACCORDANCE WITH BS EN 15048, WITH THE
OF ANY SUBGRADE MAY BE CAUSE FOR COMPLETE REMOVAL OF BLINDING AND RE- MECHANICAL PROPERTY REQUIREMENTS OF BS EN ISO 898-1.
PREPARATION AND APPROVAL OF THE SUBGRADE. TW.1. ALL TEMPORARY WORKS REQUIRED FOR CONSTRUCTION OF THE PERMANENT WORKS ARE SUBJECT TO APPROVAL
BY THE EMPLOYER'S REPRESENTATIVE, CONTRACTOR TO ENSURE THAT TEMPORARY WORKS ARE PROVIDED TO PROTECT B.2. ALL THE PRE - LOADED BOLTS ARE TO BE GRADE HR 8.8 IN ACCORDANCE WITH BS EN 14399-3. BOLTS SHOULD
E.10. EXCAVATIONS FOR NEW FOUNDATIONS MAY ENCOUNTER CONTAMINATED MADE GROUND. THE AND SUPPORT EXISTING SERVICES DURING THE COURSE OF THE WORKS. BE TIGHTENED IN ACCORDANCE WITH BS EN 1090-2. B01 18/12/19 --- --- ---
CONTRACTOR SHALL REFER TO AVAILABLE GROUND INVESTIGATION DATA IN THE CONSTRUCTION
Rev Date Description of Revisions Dsnd Chkd Appr
DOCUMENTATION FOR FURTHER DETAILS. WHERE MATERIAL IS EXCAVATED THE CONTRACTOR TW.2. THE CONTRACTOR SHALL PROVIDE ANY TEMPORARY WORKS REQUIRED TO ENABLE NEW STRUCTURE CONSTRUCTION. B.3. ALL HR BOLTS TO HAVE A GALVANISED OR SIMILAR FINISH.
Status Suitabilty
SHALL DETERMINE IT'S SUITABILITY FOR RE- USE OR WASTE DISPOSAL CLASSIFICATION IN
ACCORDANCE WITH THE SPECIFICATION. TW.3. DESIGN OF ANY TEMPORARY WORKS IS THE RESPONSIBILITY OF THE CONTRACTOR. A - POST - INSTALLED ANCHORS IN CONCRETE: WIP - Design S0
A.1. ALL POSTS-INSTALLED ANCHORS IN CONCRETE ARE TO BE INSTALLED, SUPERVISED, INSPECTED, CERTIFIED
E.11. ANY SOFT SPOTS FOUND IN EXCAVATION TO BE REMOVED AND FILLED WITH TYPE 1A COMPACTED TW.4. ELLIOT METHOD OR SIMILAR TO BE USED TO REMOVE/BREAK-DOWN THE TOPS OF THE PILES.
AND TESTED WHERE APPLICABLE IN ACCORDANCE WITH BS8539:2012.
GRANULAR FILL. ALL BACKFILL MATERIAL IS TO BE COMPACTED IN ACCORDANCE WITH HIGHWAY
AGENCY SPECIFICATION FOR HIGHWAY WORKS.
R - REINFORCEMENT : A.2. THE ANCHORS SPECIFIED ON THE DRAWINGS SHALL NOT BE CHANGED WITHOUT A FULL SELECTION PROCESS
BEING UNDERTAKEN IN ACCORDANCE WITH SECTION 10 OF BS8539:2012
E.12. ALL REINFORCED CONCRETE ELEMENT ARE TO BE CAST WITH CONCRETE BLINDING AND FORMED
R.1. STEEL REINFORCEMENT SHALL BE RIBBED GRADE B500B TO BS EN 10080:2005 AND BS 4449:2005+A3:2016.
SIDES TO PREVENT CONTAMINATION OF THE CONCRETE WITH SOIL AND TO ENABLE PROVISION
OF STATED COVERS TO REINFORCEMENT.
R.2. BENDING AND SCHEDULING OF REINFORCEMENT TO BE IN ACCORDANCE WITH BS 8666:2005.
SURFACES:
SU.1. FOOTBRIDGE MAIN SPAN, STAIRS, RAMPS AND LANDING TO HAVE NON SLIP WATERPROOF FINISH
E.13. FOUNDATIONS TO BE COORDINATED WITH ALL DRAINAGE, INSPECTION CHAMBERS,
R.3. REINFORCEMENT NOTATION ON DRAWINGS
EARTHING/LIGHTING PROTECTION REQUIREMENTS.
15 B 20-01-150 FF SU.2. AT SPLICE SURFACE TO BE 'MADE GOOD' TO FORM UNIFORM FALL & WATERPROOF JOINT.
No. OF BARS
PC - PRE - CAST ITEMS : TYPE OF STEEL SU.3. STAIR TREADS AND NOSING TO BE GRIPFAST HEAVY DUTY DDA COMPLIANT OR SIMILAR APPROVED WITH A
BAR DIAMETER (MM) MINIMUM NOSING OF 55mm. BOND ONLY FIXING OPTION IS PREFERRED WITH MANUFACTURER APPROVED
BAR MARK Project
PC.1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY TEMPORARY WORKS ADHESIVE
REQUIRED TO ENSURE STABILITY OF UNITS DURING TRANSPORTATION, STORAGE ON SITE, BAR SPACING (MM)
AND DURING LIFTING. BAR POSITION / ABBREVIATION SU.4. FRONT EDGE OF STEPS TO HAVE NON SLIP NOSING CONSPICUOSLY MARKED. NOSINGS SHALL BE COLOUR East West Rail
CONTRASTED FROM THE REST OF THE STEP, FOR ITS FULL WIDTH TO A DEPTH OF 55mm ON THE TREAD AND
R.4. SPACINGS GIVEN FOR REINFORCEMENT ARE BETWEEN BAR CENTRES.
PC.2. LIFTING ARRANGEMENTS AND CAST- IN LIFTING ANCHORS TO BE DESIGNED BY THE
CONTRACTOR.
THE RISER. (Western Section)
R.5. ABBREVIATIONS USED:-
PC.3. DESIGN AND DETAILS TO BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
SU.5. NOSING AT TOP AND BOTTOM OF EACH FLIGHT TO BE YELLOW, INTERMEDIATE STEP NOSINGS TO BE WHITE.
Phase 2
NF - NEAR FACE
NF1 - NEAR FACE FIRST LAYER
PFN - PILE FOUNDATION:
PC.4. UNLESS OTHERWISE NOTED (UNO) ON THE DRAWINGS ALL PRECAST ELEMENTS ARE TO BE Drawing Title
DESIGNED BY THE SPECIALIST PRECAST CONCRETE SUPPLIERS BASED ON THE DESIGN NF2 - NEAR FACE SECOND LAYER
PFN.1. ALL PILING SHALL COMPLY WITH THE PILING SPECIFICATION
INTENT DRAWINGS PROVIDED. T - TOP Phase 2B - EWR2
T1 - TOP BAR FIRST LAYER
PFN.2. CENTRE OF THE HEADS OF PILES (AT CUT-OFF LEVEL) TO BE WITHIN A PLAN POSITIONAL TOLERANCE OF
PC.5. ALL GROUT SHALL BE OF THE NON- SHRINK, NON FERROUS TYPE WITH A CONCRETE CUBE
2
T2
FF
-
-
TOP BAR SECOND LAYER
FAR FACE
±75mm OF THE DESIGN LOCATION OF EACH PILE TO OFFER THE FOLLOWING GEOMETRICAL TOLERANCE: Winslow Station
STRENGTH OF 50N/mm . PILE VERTICALLY: 1 IN 75mm DEVIATION FROM VERTICAL
FF1 - FAR FACE FIRST LAYER
PC.6. COVERS TO REINFORCEMENT FOR DIFFERENT PRECAST ELEMENTS ARE AS GIVEN BELOW: FF2 - FAR FACE SECOND LAYER
PILE DIAMETER: 0mm TO +75mm. General Notes
B - BOTTOM
CONCRETE COVER, Cnom ( in mm) B1 - BOTTOM BAR FIRST LAYER
PFN.3. ALL PILES TO BE CAST TO A MINIMUM 300mm ABOVE CUT-OFF LEVEL. TOP OF PILES SHALL BE CUT BACK TO Sheet 1 of 2
GIVE 75mm PENETRATION INTO PILE CAP.
ELEMENTS REMARKS B2 - BOTTOM BAR SECOND LAYER
GRADE
TOP BOTTOM SIDES Designed Signed Date
EF - EACH FACE
--- --- ---
50 50 STEM AB - ALTERNATE BARS SP - SHEET PILES:
Drawn Signed Date
PLATFORM "L" WALL / RETAINING WALL C40/50 PAS - PLACED AS SECTION Selvaraj Jayachandran S. Jayachandran 31/10/17
50 50 50 BASE SP.1. CENTRE OF SHEET PILES TO BE WITHIN A PLAN POSITIONAL TOLERANCE OF ±75mm OF THE DESIGN
STG - STAGGERED
LOCATION TO OFFER THE FOLLOWING GEOMETRICAL TOLERANCE. Checked Signed Date
ABR - ALTERNATE BAR REVERSED --- --- ---
PLATFORM SLAB C40/50 50 50 50 SHEET PILE VERTICALLY: 1 IN 75mm DEVIATION FROM VERTICAL.
PRS - PAIRS
Approved Signed Date
CONCRETE STAIRS C40/50 50 50 50 CRS - CENTRES --- --- ---
( INCLUDING THOSE WITH LANDING ) SF - SIDE FACE Scale(s) ELR - Project Chainage (Miles Yards)
TLL - TOP LEG LONGER
CONCRETE CLADDING C40/50 50 50 50 ABS - ALTERNATE BARS STAGGERED
NTS OXD - 7m 802y
Design Package Risk Classification Sheet
PC.7. ALL EXPOSED CONCRETE ( PRECAST ) ARISES SHALL HAVE 10 x 10mm CHAMFER UNLESS T2 T1
NF1 FF1
Normal 1 of 2
NOTED OTHERWISE.
Alternative Reference Revision
01
on & Ver
01.
GLOSSARY OF TERMS:-
B01.
si
Revi
MATERIAL PROPERTIES REQUIRED FOR ACCEPTABILITY (IN ADDITION TO REQUIREMENTS CCTV - CLOSED CIRCUIT TELEVISION
ON USE OF FILL MATERILS IN CLAUSE 601 AND TESTING IN CLAUSE 631) - SPECIFICATION CP - CATCH PIT
FOR HIGHWAY WORKS. EJ - EXPANSION JOINT
GEOTECH TO CONFIRM EX - EXISTING
PROPERTY DEFINED AND TESTED IN ACCORDANCE WITH: ACCEPTABLE LIMITS WITHIN:
FW - FOUL WATER
LOWER UPPER G - GULLY (DRAINAGE)
IC - INSPECTION CHAMBER
000011
1) UNIFORMITY COEFFICENT SEE NOTE E.5. IN 5 - LC/LP - LIGHTING COLUMN (LAMP POST)
DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-000010
MH - MANHOLE
PCC - PRE-CAST CONCRETE
2) LOS ANGELES COEFFICIENT CLAUSE 635 - 60
SP - SIGNAL POST
CS-
3) UNDERAINED SHEAR PARAMETERS (c AND Ø) CLAUSE 633 N/A - TOF - TOP OF FOUNDATION
UC - UNIVERSAL COLUMN
4) EFFECTIVE ANGLE OF INTERNAL FRICTION CLAUSE 636 38°, PLT. - PLATE
DR-
-
(Ø') AND EFFECTIVE COHESION (c') kN/m
2
TYP. - TYPICAL
THK. - THICK
-5 -1
CRS. - CENTRES
BTM - BOTTOM
W-
O/A - OVERALL
S.O.P. - SETTING OUT POINT
WI
FB - FOOTBRIDGE
HV - HIGH VOLTAGE
S&T - SIGNALLING AND TELECOMS
WINSLOW STATION - FOUNDATION SETTLEMENT LIMITS : WINSLOW STATION - DEFLECTION LIMITS FOR SHEET PILE : SPT - SIGNAL POST TELEPHONE
133735_2B-
RC - REINFORCED CONCRETE
DESCRIPTION TOTAL SETTLEMENTS, mm DIFFERENTIAL SETTLEMENT, mm REMARKS ANTICIPATED DEFLECTION AT TOP OF SHEET PILE (mm)
SHEET PILE SECTION SIZE PILE LENGTH(m)
IMMEDIATE ADDITIONAL TOTAL LONG TERM
awi
PILE CAP ( AT CUTTING ) 10 5 DIFFERENTIAL SETTLEMENT BETWEEN PILE CAP & SHEET PILE
DIFFERENTIAL SETTLEMENT
PILE CAP ( AT CREST ) 10 5 BETWEEN PILE CAPS AT CREST & CUTTING
Status Suitabilty
WIP - Design S0
Project
Phase 2B - EWR2
Winslow Station
General Notes
Sheet 2of 2
Designed Signed Date
--- --- ---
Drawn Signed Date
Sanjay Thezhukkil S. Thezhukkil 18/12/19
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 2 of 2
Alternative Reference Revision
B01
Drawing Number
133735_2B-EWR-WIW-XX-DR-CS-000011
01
THE OUTLINE CONSTRUCTION SEQUENCE FOR PLATFORMS. THE OUTLINE CONSTRUCTION SEQUENCE OF STAIRCASES /
on & Ver
01.
FOOTBRIDGE / STATION BUILDING. 1. FOR GENERAL NOTES REFER DRAWING No.
13375_2B-EWR-WIW-XX-DR-CS-000010.
B01.
1. INSTALL THE PILES FOR FOOTBRIDGE FOUNDATION AT CREST (ADJACENT TO STATION
si
1. INSTALL THE PILES FOR FOOTBRIDGE FOUNDATIONS AT TOE OF CUTTING (PLATFORM 1 & 2).
BUILDING). 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
Revi
LIST OF DRAWINGS
2. INSTALL PERMANENT DRAINAGE SYSTEM/ INSPECTION CHAMBER BACK OF SHEET PILES
2. CONSTRUCT THE IN-SITU CONCRETE PILE CAP AT CREST. IN:13375_2B-EWR-WIW-XX-DR-CS-000013.
(PLATFORM 1 & 2).
3. ERECT THE STEEL COLUMNS FOR THE STAIRCASES AND THE FOOTBRIDGE SUPPORTING
3. DRIVE SHEET PILES AZ24/700 AND AZ30/750 AS PER DESIGN DRAWINGS (PLATFORM 1 & 2).
STEEL STRUCTURE (PLATFORM 1 & 2).
4. BURN OFF TOP OF SHEET PILES TO THE REQUIRED HEIGHT FOR INSTALLING THE IN-SITU
000011
4. ERECT THE PRE-ASSEMBLED STEEL STAIR FLIGHTS (2 NOS.), ONE AT A TIME (PLATFORM 1 &
CONCRETE CAPPING BEAM (WHERE REQUIRED ON PLATFORM 1 & 2).
2).
5. INSTALL THE IN-SITU CONCRETE CAPPING BEAM OVER THE SHEET PILES (WHERE REQUIRED
5. ERECT THE PRE-ASSEMBLED STEEL LIFT SHAFT AND THE VIERENDEEL TRUSS (PLATFORM 1
ON PLATFORM 1 & 2).
& 2).
CS-
8. EXCAVATE IN FRONT OF SHEET PILES TO THE REQUIRED LEVEL FOR THE CONSTRUCTION
8. PLACE THE BEARINGS.
W-
10. PLACE THE PURLINS ON THE STEEL STAIRCASE / FOOTBRIDGE SUPPORTING STRUCTURE
10. CONSTRUCT THE IN-SITU PILE CAP AND THE LIFT/LMR WALLS, PEDESTALS AND UPSTAND
AND FIX THE KALZIP ROOF (PLATFORM 1 & 2).
WALLS SITTING ON THE PILE CAP (PLATFORM 1 & 2).
12. EXCAVATE IN FRONT OF L-WALLS / RETAINING WALLS TO THE REQUIRED LEVEL FOR THE
CONSTRUCTION OF PLATFORMS (PLATFORM 1 & 2).
13. CONSTRUCT THE RAFT FOUNDATION FOR THE STATION BUILDING.
17. INSTALL COMPRESSIBLE FILL / BOARD AT BACK OF L WALLS (WHERE THERE ARE SHEET
PILES FOR PLATFORM 1 & 2)
18. POUR IN-SITU CONCRETE BETWEEN L WALLS AND SHEET PILES (PLATFORM 1 & 2).
19. BURN OFF TOP OF REMAINDER OF SHEET PILES TO ACHIEVE A UNIFORM 1.10m HEIGHT
ABOVE PLATFORM LEVEL (PLATFORM 1 & 2).
20. PROVISION TO BE MADE FOR FIXING THE CLADDINGS TO THE SHEET PILES (LOCAL
EXCAVATION MAY BE REQUIRED). THIS MAY ALSO REQUIRE ADDITIONAL STEEL FLAT
WELDED TO SHEET PILES WHEREVER REQUIRED (PLATFORM 1 & 2).
22. POUR IN-SITU CONCRETE BETWEEN CLADDING PANELS AND SHEET PILES. ADEQUATE
TEMPORARY WORKS TO BE IN PLACE BEFORE ANY POURING (PLATFORM 1 & 2).
23. BACKFILL AND REGRADE THE CUTTING (AS PER EARTWORKS DRAWINGS/ MODEL/
SPECIFICATION) BEHIND PLATFORM 1 RETAINING WALL ALONG WITH THE ADDITION OF
FILTER MEDIUM MATERIAL REQUIRED FOR DRAINAGE SYSTEM.
25. INSTALL THE PLATFORM 1 FENCE ON TOP OF THE RETAINING WALL AND THE HANDRAILS
WITH IN-SITU FOUNDATION BEHIND THE SHEET PILES (LOCAL EXCAVATION MAY BE
REQUIRED) (PLATFORM 1 & 2).
26. INSTALL THE PRECAST MAINTENANCE STAIR (PLATFORM 1) / IN-SITU CONCRETE WALKWAY
BEHIND THE SHEET PILES / RETAINING WALL (PLATFORM 1 & 2).
Status Suitabilty
WIP - Design S0
Project
Phase 2B - EWR2
Winslow Station
Construction Sequence
Sheet 1of 1
Designed Signed Date
--- --- ---
Drawn Signed Date
Sanjay Thezhukkil S. Thezhukkil 18/12/19
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 1 of 1
Alternative Reference Revision
B01
Drawing Number
133735_2B-EWR-WIW-XX-DR-CS-000012
01
on & Ver
LIST OF DRAWINGS
01.
SL.No. DRAWING No. TITLE
B01.
si
GENERAL
Revi
STATION BUILDING
DR-
10 133735_2B-EWR-WIW-P1-DR-CS-030010 WINSLOW STATION PROPOSED FOOTBRIDGE, LIFT AND LMR SECTIONS SHEET 1 OF 2
133735_2B-
11 133735_2B-EWR-WIW-P1-DR-CS-030011 WINSLOW STATION PROPOSED FOOTBRIDGE, LIFT AND LMR SECTIONS SHEET 2 OF 2
ng Num ber
12 133735_2B-EWR-WIW-P1-DR-CS-050010 WINSLOW STATION PROPOSED FOOTBRIDGE, LIFT AND LMR STEEL CONNECTION DETAILS SHEET 1 OF 3
13 133735_2B-EWR-WIW-P1-DR-CS-050011 WINSLOW STATION PROPOSED FOOTBRIDGE, LIFT AND LMR STEEL CONNECTION DETAILS SHEET 2 OF 3
awi
Dr
PLATFORM
19 133735_2B-EWR-WIW-P1-DR-CS-010004 WINSLOW STATION PROPOSED SME1 AND SME2 GENERAL ARRANGEMENT PLAN
20 133735_2B-EWR-WIW-P1-DR-CS-010005 WINSLOW STATION PROPOSED PLATFORM SHELTER COLUMN AND ACCESS STAIRCASE
REINFORCEMENT DETAILS
36 133735_2B-EWR-WIW-P1-DR-CS-614 FOUNDATION REINFORCEMENT DETAILS SHEET 4 OF 4 B01 08/01/20 $EDIT#RV_NOTE_1$ --- --- ---
42 133735_2B-EWR-WIW-P1-DR-CS-620 PILECAP, LIFT /LMR WALL, PLATFORM WALL REINFORCEMENT DETAILS SHEET 1 OF 4
43 133735_2B-EWR-WIW-P1-DR-CS-621 PILECAP, LIFT /LMR WALL, PLATFORM WALL REINFORCEMENT DETAILS SHEET 2 OF 4
44 133735_2B-EWR-WIW-P1-DR-CS-622 PILECAP, LIFT /LMR WALL, PLATFORM WALL REINFORCEMENT DETAILS SHEET 3 OF 4
Project
45 133735_2B-EWR-WIW-P1-DR-CS-623 PILECAP, LIFT /LMR WALL, PLATFORM WALL REINFORCEMENT DETAILS SHEET 4 OF 4
East West Rail
46 133735_2B-EWR-WIW-XX-DR-CS-624 WALKWAY SLAB REINFORCEMENT DETAILS SHEET 1 OF 3
(Western Section)
47 133735_2B-EWR-WIW-XX-DR-CS-625 WALKWAY SLAB REINFORCEMENT DETAILS SHEET 2 OF 3
Phase 2
48 133735_2B-EWR-WIW-XX-DR-CS-626 WALKWAY SLAB REINFORCEMENT DETAILS SHEET 3 OF 3
Drawing Title
Normal 1 of 1
Alternative Reference Revision
B01
Drawing Number
133735_2B-EWR-WIW-XX-DR-CS-000013
01
on & Ver
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
01.
A B C C1 D E F G NOTED OTHERWISE.
B01.
si
2. ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
Revi
F4 1150x1150x1200 DEEP
F1 ii. DRAINAGE DRAWINGS.
F5 1300x1300x1000 DEEP 133735_2B-EWR-OXD-XX-DR-DR-000015 TO
00-
F1
EW R-
GROUND BEAM
7623
LEGENDS:
133735_2B-
TYP. - TYPICAL
ng Num ber
12
awi
Dr
7200
F1
CARPARK FOUNDATION
(TYP.)
F1
11
5110
F1
75
24
10
F1
70
65
7200
IN-SITU RC FOUNDATION
9
F1
4800
PRECAST RETAINING
WALL (TYP.)
8
4800
75
24
7 70
65
080002
7200
IN-SITU RC FOUNDATION
CS-
F1
DR-
6
00-
4800
WIW-
5
EW R-
B01 28/11/19 Shared for IDC Review --- --- ---
ON REFER DW G.No.133735_2B-
Rev Date Description of Revisions Dsnd Chkd Appr
7200
Status Suitabilty
WIP - Design S0
F1
4
4800
PRECAST RETAINING
Project
WALL (TYP.)
NUATI
F2 (TYP.) F1
2 (Western Section)
IN-SITU CONCRETE Phase 2
NE -FOR CONTI
FENCE POST FOUNDATION FOUNDATION TO
(TYP.) (FOR DETAILS REFER SUPPORT STAIR 1100
Drawing Title
ARCHITECTURAL DWG.)
Phase 2B - EWR2
12610
2420
IN-SITU CONCRETE
Winslow Station
RAMP TO ACCESS
F2 F2 F2 F2 F2 Forecourt Area
CYCLE PARKING F1
M ATCHLI
Foundation Plan
CARPARK FOUNDATION
F3
(TYP.) F3 Designed Signed Date
F4 --- --- ---
1 Drawn Signed Date
Spurthi YS S. YS 26/11/19
IN-SITU CONCRETE
F6 Checked Signed Date
FENCE FOUNDATION --- --- ---
PRECAST SME2 STAIR
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
IN-SITU CONCRETE IN-SITU CONCRETE
CYCLE STAND FENCE FOUNDATION
1:200 OXD - 7m 802y
FOUNDATION Design Package Risk Classification Sheet
THE ASSUMPTION IS THAT THE CARPARK FOUNDATION THE CARPARK COLUMN FOUNDATIONS, THE STAIRCASE 1 FORECOURT AREA FOUNDATION PLAN Normal 1 of 2
SHALL BE CONSTRUCTED AT THE SAME TIME AS THE COLUMN FOUNDATION, THE GROUND BEAMS AND THE Alternative Reference Revision
FORECOURT RAMP ARE IN ABEYANCE 080001 SCALE1:200
0 4 8 12 16 20m B01
Drawing Number
SCALE 1:200
133735_2B-EWR-WIW-00-DR-CS-080001
sion
01
KEY PLAN : 1:2500
on & Ver
AD
RO
02.
OD
WO
EXI
STI
NG GASSTATI
ON
N N
OR
B01.
TH
B
si
EA
U
C
K
I
GR
N
Revi
G
H
A
M
R
O
A
D
B
U
C
K
IN
G
LE H
NG A
SI M
ED NG R
OS LDI O
OP UI A
D
PR EYB
OR
ST
010001
NOTES:
W-
FOR SME2 DETAILS REFER DRAWING No. 1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
WI
HIGH MAST LIGHTING POST 3.FOR GENERAL NOTES REFER DRAWING NO.
FOUNDATION
133735_2B-
133735_2B-EWR-WIW-XX-DR-CS-000001.
ng Num ber
91620
91610
91600
91590
91580
91570
(TYP.)
5.DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
PRECAST PLATFORM
Dr
IC
6. FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
B B
50
REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
FALL 1:
SME2 WALKWAY
IC 030001 SME2 REFUGEE 030001
SHEET PILE AZ24-700 (SETTING OUT SHOWN INDICATIVELY)
AREA
LEGENDS :
CP - CABLE PIT
010002
IC - INSPECTION CHAMBER
PRECAST "L" WALL
PERMEABLE DRAINAGE LP - LIGHTING POST
GRANULAR FILL ACO DRAIN CHANNEL LP
CS-
CHANNEL LMR - LIFT MACHINE ROOM
Drawing Identifier PLATFORM - 2
CIS - CUSTOMER INFORMATION SYSTEM
DR-
PRECAST END
Sheet Name IC EVC - EMERGENCY VOICE COMMUNICATION
STEPS CP1 CP1
2
P1-
PHP - PUBLIC HELP POINT
W-
010004 DC - DRAINAGE CHAMBER
WI
EW R-
PLATFORM SLAB EDGE
NG No.133735_2B-
DOWEL HOLE IN PRECAST
DOWN BLETCHLEY SLAB AND "L" WALL BELOW
ON REFER DRAW I
TELEPHONE POST (FOR BASE
DOWEL HOLE IN PRECAST
UP BLETCHLEY PLATE DETAILS REFER DWG. No.
SLAB AND "L" WALL BELOW
133735_2B-EWR-WIW-DR-CS-050001)
NUATI
50
CP1 CP1
FALL 1:
PRECAST ACCESS
FOR CONTI
EARTH WORK EMBANKMENT
STEPS PLATFORM - 1
LP CP2
PRECAST "L" WALL
50
Rev Date Description of Revisions Dsnd Chkd Appr
FALL 1:
Status Suitabilty
C C WIP - Design S0
030001 030001
PRECAST
MAINTENANCE
IN-SITU LANDING SLAB A ACCESS STAIR
Project
030001
SCALE 1:100
133735_2B-EWR-WIW-P1-DR-CS-010001
si
01
KEY PLAN : 1:2500
on & Ver
AD
RO
02.
OD
WO
EXI
STI
NG GASSTATI
ON
OR
B01.
N
TH
B
si
EA
U
C
K
I
GR
N
Revi
G
H
290
205 875 900 900 600 POLYSULPIDE SEALANT
MAINTENANCE WALKWAY
125
100mm THK. IN-SITU SLAB
CS-
730
880
DR-
800
860
P1-
900
PRECAST STAIR NOTES:
900
W-
030005
860
BELOW LANDING LEVEL 1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
CAR PARK SIDE
WI
2510
INSITU LANDING
940x1145 IN-SITU
EW R-
635
SLAB SUPPORTING
2300 2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
900
CAPPING BEAM
PRECAST STAIRS
20mm THK. JOINT FILLED WITH 55 120
125 20
3.FOR GENERAL NOTES REFER DRAWING No.
125
POLYSULPIDE SEALANT
290
133735_2B-
900
ng Num ber
125
4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
825
825
DRAWINGS
10
200
410
1235
125 200
750
285
133735_2B-EWR-WIW-P1-DR-CS-030005.
290 860 860 290 950
900
900
125 950 950
awi
i. ARCHITECTURAL DRAWINGS.
285
1200
605
70mm DIA. OPENING
133735_2B-EWR-WIW-XX-DR-A-000001
605
10
IN PLATFORM SLAB
900
900
133735_2B-EWR-WIW-XX-DR-A-000002
4955
900
H
900
IN-SITU CAPPING BEAM 133735_2B-EWR-WIW-P1-DR-A-010006
940x1290 133735_2B-EWR-WIW-P1-DR-A-010007
900
900
030005
133735_2B-EWR-WIW-ZZ-DR-A-010011
MAINTENANCE WALKWAY
PRECAST STAIR 133735_2B-EWR-WIW-ZZ-DR-A-010012
900
100mm THK. IN-SITU SLAB
ii. DRAINAGE DRAIWINGS.
900
600
600
133735_2B-EWR-WIW-XX-DR-DR-000015 TO
133735_2B-EWR-WIW-XX-DR-DR-000031
PRECAST STAIR
iii. ELECTRICAL DRAWINGS.
900
133735-2B-EWR-WIW-P1-DR-EP-010001
10
900
890
890
133735-2B-EWR-WIW-P1-DR-EP-010002
6155
133735-2B-EWR-WIW-ZZ-DR-EP-010001
133735-2B-EWR-WIW-ZZ-DR-EP-010002
LANDING LEVEL
925
900
650
650
+108.338
10
900
SLAB SUPPORTING 133735-2B-EWR-WIW-00-DR-EP-010004
PRECAST STAIRS iv. MECHANICAL DRAWINGS.
133735_2B-EWR-WIW-00-DR-M-010001
HANDRAILS NOT SHOWN. REFER
150
133735_2B-EWR-WIW-00-DR-M-010002
1050
900
290 860 860 290 ARCHITECTURAL DRAWING FOR
900
900
133735_2B-EWR-WIW-00-DR-M-010003
HANDRAIL LOCATION
v. EARTHWORKS DRAWINGS.
350mm LONG 80mm DIA. WELL VOID IN 133735-2B-EWR-WIW-P1-DR-RT-000002
STAINLESS STEEL PRECAST SLAB FOR 587 FOR DETAILS OF THE HIGH 133735-2B-EWR-WIW-P1-DR-RT-000003
860
900
860 MAST LIGHTING POLE REFER
900
900
900
290 TO ELECTRICAL DRAWING 133735-2B-EWR-WIW-P1-DR-RT-000007
150
80mm DIA. WELL VOID IN
PRECAST SLAB FOR
6.FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
100
1000
FIXING HANDRAIL (TYP.) 750 750
900
REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
900
900
4955
10
LANDING LEVEL
F
925
C IN-SITU CONCRETE F +108.610 030005
LANDING
1000
900
030005
900
900
030005
605
10
2290 1500 LIGHTING POLE AND
INSITU LANDING SLAB
20 125 BASE PLATE
125
SUPPORTING PRECAST
445 930 200
600
950
575
100
605
860 860
845 955 490 LIGHTING POLE AND
600
1150
1020
900
BASE PLAE
LANDING LEVEL
2300
900
1535
5555
10 125
1150
900
STAIRS 80mm DIA. WELL VOID IN Rev Date Description of Revisions Dsnd Chkd Appr
150
TO ELECTRICAL DRAWING
900
150
900
IN-SITU LIGHTING 125
STEEL DOWE
900
POLE FOUNDATION
A IN-SITU LANDING SLAB
3755
900
300
5900
900
335
150 125
860 125
860
150
125
G 125 G
2270
Project
030005 030005
290
985
LANDING LEVEL
860
10
+105.370
900
290 290
+113.117 (Western Section)
D D
2000
Phase 2
2300
LANDING LEVEL
860
1011
815
Drawing Title
Phase 2B - EWR2
300x300x1000 IN-SITU
180
Normal 1 of 2
0 1 2 3 4 5m Alternative Reference Revision
B01
SCALE 1:50 Drawing Number
133735_2B-EWR-WIW-P1-DR-CS-010004
si
01
KEY PLAN : 1:2500
on & Ver
AD
LEGEND:
RO
02.
OD
CRS CENTER TO CENTER
WO
EXI
STI
NG GASSTATI
ON
OR
B01.
TYP TYPICAL N
TH
N B
si
EA
U
C
K
I
GR
N
TOB TOP OF BEAM
Revi
C BR BRACING
H
A
M
R
O
A
D
030011
VBR VERTICAL BRAZING
E B
U
C
K
2 030011
OP
OS
ED
NG
SI
UIL
L
NG
DI
E
IN
G
H
A
M
R
O
A
PR YB D
E
OR
ST
050010
010011
280 2500
C OF SUPPORT SHELF TO SUPPORT FRP
FOOTBRIDGE
5
50mm THK. LANDING
CS-
1075 1080 1130 1130 1130 1130 720 720 1130 1130 1130 1130 350 520
FOOTBRIDGE/
STIFFENER PLATE
B3 C4 LIFT LOBBY
(TYP.)
B1 C3 B1 C3 C3 B1 C3 B1 C3 C3 B1 C3
DR-
C OF STAIR
C4 FRAMING TO BE G H
C3 REFER DRAWING No.
STRINGER FABRICATED AS A 030011 030011
133735_2B-EWR-XXXX
1085
P1-
B2
R
B1
B
B4
C1 C1
B4
300 mm THICK LMR WALL DETAILS NOTES:
W-
B2
2400
B B
B4
B4
B4
B4
C1 CONCRETE CORE 1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
C OF COLUMNS
300
WI
B7
R 12mm THK DECK 2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
B 030011
1085
PLATES (TYP.)
PLATE (TYP.)
LANDING 1
B1 C5 3.FOR GENERAL NOTES REFER DRAWING No.
C3 B3 C4 C5
C OF STAIR D B3
133735_2B-
STRINGER B1 C3 B1 C3 030011 C3 B1 C3 B1 C3 C3 C3
ng Num ber
B1 C3 B1 C3 C2 B3 ROOF PURLINS
C4
C OF STAIR LANDING 3 4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
C3 C3 50mm THK. LANDING
STRINGER 1 1 LIFTING BEAM IN LMR DRAWINGS
STIFFENER PLATE (TYP.) R R
1085
B B
3020
FOOTBRIDGE/ 133735_2B-EWR-WIW-P1-DR-CS-030010.
B6
STRINGER BEAM
LIFT LOBBY 133735_2B-EWR-WIW-P1-DR-CS-030011.
2600
awi
C1
B4
B1
B3
B3
B2
B2
2170
A LIFT CORE
A
Dr
B
030010 FRAMING TO BE FABRICATED LMR ROOM 030010
R
1 1 i. ARCHITECTURAL DRAWINGS.
1
R R B
B
B7
AS A SINGLE UNIT B
1085
R 133735_2B-EWR-WIW-XX-DR-A-000001
B7
1
133735_2B-EWR-WIW-XX-DR-A-000002
LANDING 1 TOS +112.324 C4 133735_2B-EWR-WIW-01-DR-A-010004
B3 TOB +108.537
C3 C3 133735_2B-EWR-WIW-P1-DR-A-010005
C OF STAIR
C2 133735_2B-EWR-WIW-P1-DR-A-010006
STRINGER B1 C3 B1 C3
C5
300
B3 B3 C5 133735_2B-EWR-WIW-P1-DR-A-010007
1075 1180 1025 1025 1025 1024 C4
205mm DIA. OPENING HORIZONTAL BRAZING 133735_2B-EWR-WIW-ZZ-DR-A-010011
105
IN DECK PLATE FOR 133735_2B-EWR-WIW-ZZ-DR-A-010012
TOS +107.513
2785 2400 2400 300 ii. DRAINAGE DRAIWINGS.
DRAIN PIPE (TYP.)
SHELF TO SUPPORT FRP
133735_2B-EWR-WIW-XX-DR-DR-000015 TO
1 FOOTBRIDGE 5285
133735_2B-EWR-WIW-XX-DR-DR-000031
050010 iii. ELECTRICAL DRAWINGS.
C D 133735-2B-EWR-WIW-P1-DR-EP-010001
030011 030011
E F G H 133735-2B-EWR-WIW-P1-DR-EP-010002
030011 030011 030011 030011 133735-2B-EWR-WIW-ZZ-DR-EP-010001
133735-2B-EWR-WIW-ZZ-DR-EP-010002
133735-2B-EWR-WIW-00-DR-EP-010003
133735-2B-EWR-WIW-00-DR-EP-010004
BASE PLATE 265x250x12 (TYP.) FOR FIXING iv. MECHANICAL DRAWINGS.
1 PLATFORM-2 PROPOSED FOOTBRIDGE, LIFT AND LMR PLAN AT FOOTBRIDGE LEVEL PURLINS OVER THE CORE WALL. FOR 133735_2B-EWR-WIW-00-DR-M-010001
010011 SCALE1:50 (PLATFORM-1, SIMILAR BUT HANDED) CONNECTION DETAILS REFER DRAWING 133735_2B-EWR-WIW-00-DR-M-010002
133735_2B-EWR-XXX 133735_2B-EWR-WIW-00-DR-M-010003
v. EARTHWORKS DRAWINGS.
133735-2B-EWR-WIW-P1-DR-RT-000002
E 133735-2B-EWR-WIW-P1-DR-RT-000003
133735-2B-EWR-WIW-P1-DR-RT-000006
030011
C 133735-2B-EWR-WIW-P1-DR-RT-000007
280 2500
030011 6.FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
2160 2260 2260 1440 2260 2260 870
G H
C4 B3 C4
C3 B5 C3 B5 C3 C3 B5 C3 C3 B5 C3 B5 C3 030011 030011
FRAMING TO BE
FABRICATED AS A
1
B5
R SINGLE UNIT
B
2170
B5
B5
B5
B5
B5
B5
B5
B B
2400
B2
B2
030010 B 030010
R
1 R
1
F
B
030011 LIFTING BEAM
C3 C3 B3 C5
C3 D B3 C4 B3 C5
500
B5 B5 C3 B5 C3 C3 B5 C3 B5 C3
B5 B5 030011
C3 C4
C3 C3
CLEAT RSA 75x50x8 TO SUPPORT 1 1
R R
ON GAP
B B
3020
ROOF PURLIN (TYP.) B01 13/12/19 --- --- ---
B6
LMR ROOF BELOW Rev Date Description of Revisions Dsnd Chkd Appr
FRAMING TO BE FABRICATED
B2
B6
B3
B3
20 m m
A A
B2
2170
2170
2600
B5
B5
B5
B5
030010 B
R
1 B
R
1 1
B
R
1 030010
WIP - Design S0
R
ROOF PURLINS NOT SHOWN B
LIFT CORE
FOR CLARITY, FOR SETTING
TOB +115.649
OUT DETAILS REFER
C5
C3 ARCHITECTURAL DRAWINGS
C3 B5 B5
C3 C3 C5
STUB COLUMN C4 B3 C4 B3
2360 2050 2050 B3
C2 WITH RHS 250X150X12.5
2500 2785 2400 2700
(BELOW STRINGER BEAM)
C D E F G H Project
01
NOTES:
on & Ver
02.
1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
4955 1535 10mm THK. POLYSULPHIDE SELANT (TYP.) NOTED OTHERWISE.
B01.
si
Revi
HAND RAIL (FOR DETAILS 3No. STAINLESS STEEL DOWEL BARS 2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
REFER ARCHITECTURAL GRADE 500, 25mm DIA. 325mm LONG AT
DWG.) 10 290mm FROM THE EDGE (TYP.) 3.FOR GENERAL NOTES REFER DRAWING No.
250
133735_2B-EWR-WIW-XX-DR-CS-000010 AND 000011.
1990 3765 2000
+110.816
4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
400
PRECAST STAIR
250
TYP.
400
030005
DRAWINGS
177
1000
2300 4955 925
+112.586 133735_2B-EWR-WIW-P1-DR-CS-010004.
150
600
(
10mm THK. POLYSULPHIDE 300
10
)
10 10 5.DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
TYP.
1000
SEALANT (TYP.)
(TYP.)
177
i. ARCHITECTURAL DRAWINGS.
CS-
600
3No. STAINLESS STEEL DOWEL 1435 400 300 ii. DRAINAGE DRAIWINGS.
(
BARS GRADE 500, 25mm DIA. PRECAST STAIR iii. ELECTRICAL DRAWINGS.
DR-
20
iv. MECHANICAL DRAWINGS.
(T
0
YP
THE EDGE (TYP.) 300 LANDING 1900 400 v. EARTHWORKS DRAWINGS.
250
300
250
.
P1-
)
PRECAST STAIR (TYP.) +110.816
+108.338 IN-SITU CONCRETE 6.FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
10
400
LANDING
W-
CONCRETE ST1 LAID ON WELL 75mm THK. BLINDING DRY MIX CONCRETE ST1
WI
600
250mm THK
850
COMPACTED 6N FILL SOIL (TYP.) LAID ON WELL COMPACTED 6N FILL SOIL (TYP.)
150
300
PRECAST
EW R-
750
LANDING 1900 400 GRADE 500, 25mm DIA. 325mm LONG AT
20
(T
0
YP
1125 400 290mm FROM THE EDGE (TYP.)
133735_2B-
.
IN-SITU CONCRETE
)
ng Num ber
LANDING
IN-SITU CONCRETE
LANDING
+105.860 C SECTION
HIGH MAST 030005 SCALE1:50
awi
LIGHTING POLE
Dr
)
TYP.
10
PRECAST STAIR LANDING
177
400
IN-SITU
300
CONCRETE
(
300 +113.117
1300
LANDING
(TYP.)
+112.586
PRECAST STAIR
HIGH MAST
20
400
BEYOND
LIGHTING POLE
0
IN SITU-FOUNDATION 75mm THK. BLINDING DRY MIX CONCRETE
PRECAST "L" WALL (TYP.) ST1 LAID ON WELL COMPACTED 6N FILL
150
PRECAST STAIR
SHEET PILE 75mm THK. BLINDING DRY 300
30mm THK. NON-BIODEGRADABLE BEYOND SOIL (TYP.)
AZ24-700 MIX CONCRETE ST1 LAID
COMPRESSIBLE JOINT FILLER 3No. STAINLESS STEEL DOWEL
ON WELL COMPACTED 6N BARS GRADE 500, 25mm DIA.
BOARD (TYP.)
FILL SOIL (TYP.) 325mm LONG AT 290mm FROM
CONCRETE INFILL 10mm THK. NON-BIODEGRADABLE
THE EDGE (TYP.)
COMPRESSIBLE JOINT FILLER
BOARD (TYP.)
A SECTION B SECTION
D SECTION
030005 SCALE1:50 030005 SCALE1:50
030005 SCALE1:50
1235 6155
2300
10 HIGH MAST
10mm THK. POLYSULPHIDE SEALANT (TYP.) PRECAST STAIR LIGHTING POLE
DETAILS REFER
IN-SITU CONCRETE ELECTRICAL
3No. STAINLESS STEEL DOWEL BARS
LANDING +108.610 DRAWINGS
GRADE 500, 25mm DIA. 325mm LONG AT
400
IN-SITU CONCRETE 290mm FROM THE EDGE (TYP.)
250
LANDING
HAND RAIL (FOR DETAILS
1300
+111.850
REFER ARCHITECTURAL
400
DWG.)
1000
600
150
300
TYP.
.)
400 1135
20
PRECAST STAIR
1000
600
150
MAINTENANCE WALKWAY
HIGH MAST LIGHTING POLE
PRECAST LANDING 100mm THK. IN-SITU SLAB
IN-SITU FOUNDATION BEYOND 400 1125 +105.370
IN-SITU CONCRETE
LANDING
300 +105.370
COMPACTED 6N FILL SOIL (TYP.) East West Rail
1200mm WIDE PRECAST
(TYP.)
STAIR
(Western Section)
10
)
TYP.
Phase 2
155
MAINTENANCE WALKWAY,
3No. STAINLESS STEEL DOWEL BARS
100mm THK. IN-SITU SLAB
F SECTION
GRADE 500, 25mm DIA. 225mm LONG AT
(
SHEET PILE
RECESS IN PRECAST SLAB FOR ACO
20 AZ24-700
DRAIN CHANNEL Phase 2B - EWR2
350
20
E SECTION E
480
Cross Sections
PRECAST "L" WALL 200 650 Designed Signed Date
--- --- ---
Drawn Signed Date
Poornesh HK P. HK 27/09/19
Checked Signed Date
350
300mm CLASS 6N MATERIAL STARTER LAYER BENEATH "L" WALLS AND GROUND 1:50 OXD - 7m 802y
030005 SCALE1:50
BEARING FOUNDATION TO BE PLACED AND COMPACTED IN ACCORDANCE WITH Design Package Risk Classification Sheet
133735_2B-EWR-WIW-P1-DR-CS-030005
si
01
on & Ver
1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
02.
CLEAT RSA 75x50x8
TOS 116.904 mOD NOTED OTHERWISE.
TO SUPPORT ROOF
B01.
FRAMING TO BE PURLINS (TYP.)
BEAM SCHEDULE
si
SINGLE UNIT
+115.627
10 B
B3
REFERENCE MEMBER SIZE 3.FOR GENERAL NOTES REFER DRAWING No.
B3 R B6 LIFTING BEAM
050011 B3 1 B3
133735_2B-EWR-WIW-XX-DR-CS-000010 AND 000011.
+115.649 B1 RHS 250x150x12.5
2050
+115.626 BR1
4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
B2 1 B B2 SHS 300x300x12.5
R R DRAWINGS
B 1
030010
1
R
R
5.DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
B
B5 SHS 140x140x10
FRAMING TO BE FABRICATED
CS-
AS A SINGLE UNIT
9 B6 UC 152x152x37
i. ARCHITECTURAL DRAWINGS.
ii. DRAINAGE DRAIWINGS.
B
B3
R
050011
1
iii. ELECTRICAL DRAWINGS.
DR-
C4 C4 B7 T 152x76x15
iv. MECHANICAL DRAWINGS.
BR1 B8
2475
v. EARTHWORKS DRAWINGS.
7 11 PFC 125x65x15
P1-
B
B
050011
R
R
PLATE
W-
1
1
B3 REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
B
B7 COLUMN SCHEDULE
WI
B3 B2 B3
TOB 112.224 mOD LEGENDS:
EW R-
30mm THK. CAP PLATE B7 30mm THK. C2 RHS 250x150x12.5 mOD. - METERS ORDINANCE DATUM
1915
(TYP.) BASEPLATE
ng Num ber
B5 (TYP.)
BE FABRICATED AS A SINGLE UNIT
B5
Dr
C3
CAP PLATES. 6 B3
B
R
1
ROOF DECK NOT SHOWN
BRACING SCHEDULE
THE DESIGN OF LIFTING LOADS TO FOR CLARITY FOR DETAILS REFER
050011
1810
C3 BE TAKEN CARE BY THE C4 C4 ARCHITECTURAL DRAWINGS
BR1 BR1
CONTRACTOR B REFERENCE MEMBER SIZE
1 R
PFC 200x75x23 R 1 ROOF PURLIN
B
SHS 100x100x8 THK.
WELDED TO PFC125x65x15 BR1 PLATE 100x10THK.
TOP RAIL ROOF PURLIN NOT SHOWN
B5
5 FOR CLARITY, FOR DETAILS
COLUMN TO 300
SUPPORT LMR ROOF DECK REFER
1250
REFER ARCHITECTURAL
SHS 100x100x8
550
050010 SHS 100x100x8 TELECOM ARCHITECTURAL DRAWING
DRAWINGS
THK. POST EQUIPMENT
THK. TOP RAIL
SLOPE11
:00 (TYP.) TOS 114.699 mOD
300 300
+107.491
CLOSURE PLATE SHALL 13
C3 BE 10mm THK. (TYP.)
030010
B1 B6
3140
SHS 100x100x8 THK.
1355
B4 POST (TYP.)
50mm THK. LANDING LIFT CORE LMR ROOM
14
2150
STIFFENER PLATE C1 B1 LIFTING BEAM (FOR CONNECTION DETAILS
050011 REFER DRAWING 133735_B-EWR-XX......
550
3 10mm THK INFILL
PRECAST PLATFORM
IN-SITU 300mm THK.
SLAB
PLATE (TYP.) 050010 RC WALL
050010
C2
6N GRANULAR
A SECTION FILL
010011 SCALE1:50
2160 2260 2260 1440 2260 2260 1150 2500 B5 (TYP.) 2170 500 2170
50 +110.716
B2
B3
B5 B2
B5 B5
B5
C3 (TYP.)
3215
B5 Status Suitabilty
C4
SHS 100x100x8 THK. EXPANSION GAP
B5 C3
C3
C4
TOP RAIL (TYP.)
2030
WIP - Design S0
CLEARANCE
SHS 100x100x8 THK.
B5 BETWEEN HANDRAIL 10mm THK INFILL
1305
POST(TYP.)
B5 12mm THK.
TOB 113.620 mOD PLATE (TYP.)
B5
DECK PLATE
B1 STRINGER(TYP.)
TOB 107.491 moD
B5 C3
B4 B4 BR1
TOS 112.240 mOD
TOB 109.970 mOD C1
550
B5
ADDITIONAL C3
PLATE WELDED TOB 109.970 mOD
B1
FOOTBRIDGE
Phase 2
TO THE SHS FOR
SUPPORTING
C3 SHEET PILE
FIXING COMMS Drawing Title
STRUCTURE
EQUIPENT. AZ30-750
FRAMING TO BE
5770
FABRICATED AS A
SHS 100x100x8 STAIRCASE SUPER STRUCTURE TO
SINGLE UNIT (TYP.)
THK. TOP RAIL TOS 108.810 mOD B4 BE FABRICATED AS A SINGLE UNIT Winslow Station
B1 AND ERECTED ON THE COLUMN
050011 CONTRACTOR
TOS 107.491 mOD
15 Designed
---
Signed Date
---
---
6325 5590
050011 Drawn Signed Date
550
Poornesh HK P. HK 22/08/19
B1
B4 17 IN-SITU CAPPING Checked
---
Signed
---
Date
---
50mm LANDING BEAM 1030x1220
690
Normal 1 of 2
Alternative Reference Revision
B SECTION 0 1 2 3 4 5m
B01
Drawing Number
010011 SCALE1:50
SCALE 1:50 133735_2B-EWR-WIW-P1-DR-CS-030010
01
on & Ver
1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
02.
2400 2600
NOTED OTHERWISE.
B01.
B2
si
C4 (TYP.) 133735_2B-EWR-WIW-XX-DR-CS-000011.
2170
BR1 BR1 133735_2B-EWR-WIW-XX-DR-CS-000012.
B5 B5
B2 4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
10mm THK. PLATE
030011
DRAWINGS
WELDED TO BEAM
133735_2B-EWR-WIW-XX-DR-CS-010002.
FOR FIXING
133735_2B-EWR-WIW-XX-DR-CS-010003.
3375
CAMERA
TOB 108.480 mOD
CS-
i. ARCHITECTURAL DRAWINGS.
B5 TO BEAM
133735_2B-EWR-WIW-01-DR-A-010004.
SHS 100x100x8 THK. SHS 100x100x8 THK. FRAMING TO BE
12mm THK. DECK ii. DRAINAGE DRAWINGS.
P1-
B1 STRINGER
SHELF TO SUPPORT
30mm THK. BASE
ng Num ber
FRP FOOTBRIDGE
PLATE (TYP.)
C4 C4
D SECTION
PFC 200x75x23
010011 SCALE1:50
WELDED TO
COLUMN
2600 550
B3
B6 LIFTING
BEAM TOB 116.900 mOD
MAINTENANCE WALKWAY,
B2
B2 100mm THK. IN-SITU SLAB PRECAST
BR1 PLATFORM SLAB
B
R
1
2050
C5
1 B SHEET PILE
R R
B 1 700x700 IN-SITU
B3 PEDESTAL
TOB 114.700 mOD
IN-SITU REINFORCED
B CONCRETE PILECAP
C5 BEYOND R
1
C5
BEYOND
2480
BR1 E SECTION
B
1
R 010011 SCALE1:50
R
1
B
B3
TOB 112.220 mOD
B
R
1
1915
BR1
1 B
R
R 1
B B3
TOB 110.310 mOD
MAINTENANCE WALKWAY,
4685
B6 UC 152x152x37
1250
6N GRANULAR FILL
2400
B7 T 152x76x15
Winslow Station
550 2520 1020 BRACING SCHEDULE
IN-SITU CONCRETE
IN-SITU REINFORCED B8 PFC 125x65x15 Proposed Footbridge, Lift core
600
CONCRETE PILECAP
UPSTAND REFERENCE MEMBER SIZE
And LMR Section Details
600
IN-SITU REINFORCED
CONCRETE PILECAP BR1 PLATE 100x10THK.
Designed Signed Date
--- --- ---
Drawn Signed Date
Poornesh HK P. HK 30/08/19
4090 Checked Signed Date
--- --- ---
4090
Approved Signed Date
--- --- ---
0 1 2 3 4 5m
B01
Drawing Number
on
NOTES:
si
01
on & Ver
B 1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
01.
NOTED OTHERWISE.
050002
B01.
si
12mm THK. STEEL 2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
C
Revi
STEPS WELDED TO
IN-SITU CAPPING BEAM 050002 STRINGER BEAM 3.FOR GENERAL NOTES REFER DRAWING No.
40
133735_2B-EWR-WIW-XX-DR-CS-000010 AND 000011.
SPIGOT FOR SHELTER RHS 250x150x12.5
A A 20
40
COLUMN RHS 250x150x12.5 STRINGER BEAM 4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
STRINGER BEAM RHS 250x150x12.5
050002 050002 10mm THK. END PLATE DRAWINGS
STRINGER BEAM
050002
)
TYP.
WELDED TO STRINGER
167
BASE
CS-
BEAM
TYP.
(
190
RSA 200x200x16
REINFORCEMENT 6.FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
6No. 16mm DIA. ANCHOR REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
WI
SHEET PILE
B C 010005 SCALE1:10 LEGEND:
CP - CABLE PIT
5 DETAIL 6 DETAIL 050002 050002
IC - INSPECTION CHAMBER
133735_2B-
40
SCALE 1:10 STANDARD RAILING
RHS 250x150x12.5 010005 PHP - PUBLIC HELP POINT
FLANGE BASE (TYPE 62-8) 85 10mm THK. BASE
awi
STRINGER BEAM
SHELTER COLUMN (FOR DETAILS FOR FIXING GUARDRAIL PLATE
Dr
155
115
AND SPECIFICATION) KEE KLAMP OR SIMILAR
6 STRINGER BEAM
310x170x16mm THK. BASE APPROVED
100
200mm DIA x 12mm THK. 6
165
12mm THK. STEEL
TYP.
PLATE WITH 56x18mm 14mm DIA. HOLES IN PLATE
170
BASE PLATE STEPS WELDED TO
110
20
SLOTTED HOLE TO SUIT 2No. M12 HILTI
STRINGER BEAM
(
HST3 MECHANICAL 14mm DIA. HOLES IN
6No. 18mm DIA. HOLE
HOLE FOR GROUTING PLATE TO SUIT 2No.
ANCHORS WITH FILLED
FOR ANCHOR BOLTS
HOLES 150 M12 HILTI HST3
18mm DIA HOLES TO SUIT 4
110 RSA 200x200x16 6 MECHANICAL
No. M16 BOLTS WITH 150mm 300
6 ANCHORS WITH
EMBEDMENT (TYP.)
FILLED HOLES
55 210 210 210 210 210 55 300 PRECAST ACCESS
(TYP.) STAIR
1160
C SECTION 9 DETAIL D SECTION
SCALE 1:10 SCALE 1:10
A SECTION B SECTION 050002
010005 SCALE1:10
050002
280
355 PHP POST FOR DETAILS REFER
290 LIGHTING POST FOR DETAILS EVC COLUMN FOR DETAILS
TELEPHONE POST FOR DETAILS REFER 25.0 230 25.0 TELECOMMUNICATIONS DRAWING
REFER ELECTRICAL DRAWING 60 235 60
TELECOMMUNICATIONS DRAWING REFER TELECOMMUNICATIONS AND SPECIFICATION
45 200 45 AND SPECIFICATION
60
150
0
DRAWING AND SPECIFICATION
25.
AND SPECIFICATION
45
18
TELECOMMUNICATIONS DRAWING
E E F F G G H H
280
230
355
235
290
200
150
114
050002 050002 050002 050002 050002 050002 050002 050002
18
HOLE FOR GROUTING HOLE FOR GROUTING HOLE FOR GROUTING
0
HOLE FOR GROUTING
25.
88 mm DIA. HOLE IN 30 X 20 mm SLOTTED HOLE FOR
45
LIGHTING POST TELEPHONE POST EVC POST PHP POST FOR DETAILS REFER
22 x 38mm SLOTTED HOLES TO TELECOMMUNICATIONS DRAWING
35 x 25mm DIA SLOTTED HOLES 13mm DIA HOLES TO SUIT 4
SUIT 4 No. M20 BOLTS. 20mm DIA SLOTTED HOLES
TO SUIT 4 No. M20 BOLTS. No. M12 BOLTS.
25mm THK. (MAX.) NON TO SUIT 4 No. M16 BOLTS
25mm THK. (MAX.) NON 25mm THK. (MAX.) NON SHRINK
SHRINK CEMENTITIOUS 280x280x12mm THK. BASE PLATE
SHRINK CEMENTITIOUS CEMENTITIOUS GROUT HAVING
GROUT HAVING MINIMUM FOR DETAILS REFER
GROUT HAVING MINIMUM MINIMUM COMPRESSIVE STRENGTH
COMPRESSIVE STRENGTH TELECOMMUNICATIONS DRAWING
COMPRESSIVE STRENGTH (CUBE) OF 50N/mm² TO LEVEL THE B01 29/11/19 Shared for IDC Review --- --- ---
(CUBE) OF 50 N/mm² TO
(CUBE) OF 50 N/mm² TO BASE 25mm THK. (MAX.) NON SHRINK
Rev Date Description of Revisions Dsnd Chkd Appr
LEVEL THE BASE
LEVEL THE BASE PRECAST PLATFORM CEMENTITIOUS GROUT HAVING
Status Suitabilty
PRECAST PLATFORM SLAB MINIMUM COMPRESSIVE STRENGTH
PRECAST PLATFORM SLAB
SLAB (CUBE) OF 50 N/mm² TO LEVEL THE WIP - Design S0
BASE
ANCON TTS20 TYPE COUPLER ANCON TTS20 TYPE COUPLER ANCON TTS12 TYPE COUPLER PRECAST PLATFORM
OR SIMILAR APPROVED (TYP.) OR SIMILAR APPROVED (TYP.)
600 600 OR SIMILAR APPROVED (TYP.) SLAB
360 480
2No. B12 U-BAR AS 2No. B12 U-BAR AS 2No. B12 U-BAR AS ANCON TTS16 TYPE COUPLER
SUPPLIMENTARY SUPPLIMENTARY SUPPLIMENTARY OR SIMILAR APPROVED (TYP.)
REINFORCEMENT REINFORCEMENT REINFORCEMENT
2No. B12 U-BAR AS
4No. B20 L-BAR THREADED 4No. B12 L-BAR THREADED SUPPLIMENTARY
4No. B20 L-BAR THREADED
INTO COUPLER INTO COUPLER REINFORCEMENT
INTO COUPLER
4No. B16 L-BAR THREADED
WITH 150mm EMBEDMENT
G H SECTION
E F SECTION (TYP.) INTO COUPLER
SECTION SECTION SCALE 1:10
050002 SCALE 1:10 Project
050002
050002 SCALE 1:10 050002 SCALE 1:10
CIS POST FOR DETAILS REFER East West Rail
TELECOMMUNICATIONS DRAWING
AND SPECIFICATION
GUARDRAIL POST (Western Section)
18mm DIA HOLES TO SUIT 4
No. M16 BOLTS
Phase 2
300
25mm THK. (MAX.) NON SHRINK
50 200 50 Drawing Title
CEMENTITIOUS GROUT HAVING 300
50
200
900
050002 050002 050002 050002
4No. B16 L-BAR THREADED Scale(s) ELR - Project Chainage (Miles Yards)
Normal
75
050002 SCALE 1:10 050002 SCALE 1:10 300 0 of 0
Alternative Reference Revision
01
NOTES:
on & Ver
01.
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
NOTED OTHERWISE.
B01.
si
1980
3. FOR GENERAL NOTES REFER DRAWING No.
133735_2B-EWR-WIW-XX-DR-CS-000010 AND 000011.
925
133735_2B-EWR-WIW-P1-DR-CS-010001.
133735_2B-EWR-WIW-P1-DR-CS-010002.
133735_2B-EWR-WIW-P1-DR-CS-010003.
CS-
580
v. EARTHWORKS DRAWINGS.
W-
130
133735_2B-
ng Num ber
330
awi
Dr
720
720
650
1 L WALL ELEVATION 2 L WALL ELEVATION 3 L WALL ELEVATION
050004 SCALE1:10 050004 SCALE1:10 050004 SCALE1:10
1980
1980 1980
925
920 625
140
140
Status Suitabilty
140
140 WIP - Design S0
130
260
Project
Phase 2
Drawing Title
Phase 2B - EWR2
Winslow Station
Proposed Platform
Typical Details
Designed Signed Date
--- --- ---
4 L WALL ELEVATION 5 L WALL ELEVATION 6 L WALL ELEVATION
Drawn Signed Date
Spurthi YS 20/12/19
050004 SCALE1:10 050004 SCALE1:10 050004 SCALE1:10 S. YS
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 1 of2
0 200 400 600 800 1000mm Alternative Reference Revision
B01
SCALE 1:10 Drawing Number
133735_2B-EWR-WIW-P1-DR-CS-050004
01
on & Ver
NOTES:
01.
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
NOTED OTHERWISE.
P01.
si
Revi
DRAWINGS
133735_2B-EWR-WIW-P1-DR-CS-010001.
133735_2B-EWR-WIW-P1-DR-CS-010002.
133735_2B-EWR-WIW-P1-DR-CS-010003.
CS-
1980 1245
5. DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
130mm DIA. OPENING FOR 75mm DIA.
990 550 140x140 OPENING i. ARCHITECTURAL DRAWINGS.
DR-
140
v. EARTHWORKS DRAWINGS.
W-
75mm DIA.
DOWEL HOLE
awi
Dr
720
2795
635
75mm DIA.
DOWEL HOLE
130
Status Suitabilty
WIP - Design S0
Project
Phase 2B - EWR2
3 L WALL ELEVATION
Winslow Station
050005 SCALE1:10
Proposed Platform
L Wall Details
Designed Signed Date
--- --- ---
Drawn Signed Date
Spurthi YS 20/12/19
S. YS
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 2 of2
0 200 400 600 800 1000mm Alternative Reference Revision
P01
SCALE 1:10 Drawing Number
133735_2B-EWR-WIW-P1-DR-CS-050005
01
on & Ver
270
205mm DIA OPENING NOTES:
01.
FOR DRAIN (TYP.) C SUPPORT 1. ALL DIMENSIONS ARE IN MILLIMETRE UNLESS
NOTED OTHERWISE.
B01.
CORBEL / SHELF TO
320
370
si
555
C4 C4
B1 B1
295 3. FOR GENERAL NOTES REFER DRAWING NO.
C STRINGER BEAM 133735_2B-EWR-WIW-XX-DR-CS-000001.
1085
4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
050010
550
STAIRS B DECKPLATE TO
R 133735_2B-EWR-WIW-P1-DR-CS-010011.
1
1085
B1
1
R
B1
RAINWATER PIPE
B
133735_2B-EWR-WIW-P1-DR-CS-030010.
2170
2020
133735_2B-EWR-WIW-P1-DR-CS-030011.
CS-
1280
TCHES AT 130
PROPOSED
B4
B4
B2
C1 LOBBY 5. DRAWING TO BE READ IN CONJUCTION WITH
STAIRS
550
DR-
i. ARCHITECTURAL GA DRAWINGS
2170
2080
ii. DRAINAGE DRAIWINGS
1085
iii.ELECTRICAL DRAWINGS
P1-
16 PI
iv.MECHANICAL DRAWINGS
B2
J 550 550
AT 150mm C/C (TYP) v. EARTHWORKS DRAWINGS
W-
B7
335
050010
1085
6. FOR SAFTEY, HEALTH AND ENVIRONMENT INFORMATION
WI
B1
REFER DRAWING 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
EW R-
C STRINGER BEAM
240
C3
C3 B1 C SUPPORT
500
350
C4 C4
240
20
B3
10
133735_2B-
B1 B1 B3
C STRINGER BEAM
C3
ng Num ber
C STRINGER BEAM
B1 B1
350
275 C4
10mm THK.
STIFFNER
awi
PLATES (TYP.)
1085
Dr
1
12mm THK. DECK
R
103 1091 182 B
R
R B
B
B
C1 1 R PLATE
1
1255
206
B1
LIFT CORE
274
2170
2020
TCHES AT 135
TCHES AT 135
B1
2600
2295
2295
75
R
227
10
12mm THK. 1
5
B2
B2
B3
DECK PLATE
17 PI
17 PI
1085
180 1196
B7
B7
320
565
B1
C3 10
C STRINGER BEAM
X DETAIL
C3 B1
#### SCALE1:20 35
1075 1090 230
C4
2160 200
470
B3 B3
J C4 C4
380
10 10
320
050010
1 PLAN AT LANDING 1
C OF CHS COLUMN
010011 SCALE1:25
050010 050010
C1
2 PLAN AT LANDING 2
300x300x25mm THK. BASE
010011 SCALE1:25
PLATE WITH 25mm THK.
8
CEMENTITIOUS GROUT
C OF COLUMN
12mm THK. DECK PRECAST PLATFORM
STRINGER BEAM B1
(TYP.) PLATE SLAB (TYP.) SHS 100x100x8THK.
CUT TO SHAPE 8
POST (TYP.)
STRINGER BEAM
T.O.C
B1
(FOR DETAILS
(TYP.)
REFER DETAIL X)
EM BEDM ENT LENGTH
(TYP.)
16mm THK. STIFFNER PLATE
8
)
C3
TYP.
171
25mm THK. BASE PLATE
C1
C2
(
25mm THK. CAP PLATE
750
STRINGER BEAM B1
K K 12No. M24 x 750, GRADE
B01 29/11/19 Shared for IDC Review --- --- ---
35
NOM
50
H.D. BOLTS-c/w NUT,
150
PRECAST CONCRETE
C OF COLUMN WASHER & ANCHOR PLT.
SALB
8mm THK. ANCHOR PLT.
030010 SCALE1:10
East West Rail
.
67
8 C OF COLUMN
(Western Section)
1
4 DETAIL
0
0
Phase 2
22.
50
425
Phase 2B - EWR2
5°
50
.
STIFFNER PLATE
8 GRADE 8.8
Staircase Details
600
C1 COLUMN C2
EQ.
150
50
PLATE
PRECAST CONCRETE Approved Signed Date
--- --- ---
800x800 IN-SITU SALB
K SECTION PEDESTAL
Scale(s) ELR - Project Chainage (Miles Yards)
M SECTION Normal 1 of 3
Alternative Reference Revision
si
01
on & Ver
1. ALL DIMENSIONS ARE IN MILLIMETRE UNLESS
01.
NOTED OTHERWISE.
C OF COLUMN
B01.
si
2. ALL LEVELS ARE IN METRE UNLESS NOTED OTHERWISE.
Revi
40
050011
60 60
PLATE SLAB
133735_2B-EWR-WIW-P1-DR-CS-010011.
GRADE 8.8 (TYP.)
CS-
300
500x500x25mm THK. i. ARCHITECTURAL GA DRAWINGS
ANCHOR PLT.
SHS 200x200x6.3 CAP PLATE ii. DRAINAGE DRAIWINGS
8
P1-
STRINGER BEAM B1
PEDESTAL SHS 300x300x12.5
BEAM
133735_2B-
ng Num ber
1 DETAIL
030010 SCALE1:10 2 DETAIL 5 DETAIL 4 DETAIL
awi
500
PLATE 100x10 (TYP.) 15mm THK. PLATE
500
50
50 200 200 50 WELDED TO COLUMN
3
0
6 50 EQ EQ EQ 50
50
50
100
8 No. M20 BOLT
5
GRADE 8.8
0
SHS 300x300x12.5
3
0
100
COLUMN
SHS 300x300x12.5
5
0
EQ
3
200
0
500
0
EQ
5
500
6 BEAM
BASE PLATE
200 6 3 No. M20 BOLT 8
5
EQ
5
700x700mm CONCRETE
500x500x25mm THK.
PEDESTAL 15mm THK. T - PLATE
BASE PLATE
WELDED TO BEAM
50
50
15mm THK GUSSET PLATE
WELDED TO PLATE
P SECTION
Q SECTION
050011 SCALE1:10
8 DETAIL N SECTION 050011 SCALE1:10
SHS 300x300x12.5 6
3 No. M20 BOLT 6 6
COLUMN 6 GRADE 8.8 (TYP.) 6 6
15mm THK. PLATE
SHS 200x200x6.3 BEAM
WELDED TO
40
5
0
0
0
5
0
3 No. M20 BOLT 3 No. M20 BOLT
5
5
60 60
0
PLATE 100x10 GRADE 8.8 (TYP.) GRADE 8.8 (TYP.)
60 60
(TYP.)
15mm THK GUSSET 15mm THK GUSSET PLATE
0
3 No. M20 BOLT
0
3
3
PLATE
5
5
0
GRADE 8.8 (TYP.)
3
0
40
40
15mm THK. GUSSET PLATE
0
3
SHS 200x200x6.3 WELDED TO COLUMN
3
0
60 60
60 60
60 60
BEAM
3 No. M20 BOLT B01 29/11/19 Shared for IDC Review --- --- ---
3 No. M20 BOLT
6 GRADE 8.8 (TYP.) Rev Date Description of Revisions Dsnd Chkd Appr
GRADE 8.8 (TYP.)
0
5
40
15
WELDED TO BEAM
SHS 200x200x6.3 SHS 200x200x6.3 BEAM
3
0
0
SHS 200x200x6.3 BEAM
BEAM
5
0
0
0
0
5
5
SHS 200x200x6.3 15mm THK T - PLATE
3 No. M20 BOLT 3 No. M20 BOLT
COLUMN WELDED TO BEAM
GRADE 8.8 (TYP.) GRADE 8.8 (TYP.)
3
0
0
15mm THK GUSSET
9 DETAIL
5
0
0
PLATE 15mm THK T - PLATE 15mm THK T - PLATE
10 DETAIL
030010 SCALE1:10
PLATE 100x10 (TYP.) PLATE 100x10 (TYP.)
C OF LIFT COLUMN
SHS 200x200x6.3 SHS 200x200x6.3
Project
SHS200x200x6.3 COLUMN COLUMN
30
135
6
30 16mm THK. BASE 6 Phase 2B - EWR2
PLATE
Winslow Station
100
400
8 Nos. M24x150,
GRADE 8.8 H.D.
Proposed Footbridge, Staircase
100
BOLTS-c/w NUT,
165
WASHER &
ANCHOR PLT.
Typical COnnection Details
65
65
500
133735_2B-EWR-WIW-P1-DR-CS-050011
sion
01
KEY PLAN : 1:2500
on & Ver
02.
N
B01.
si
Revi
DR-
P1-
W- 080001
CS-
NOTES:
1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
WI
NOTED OTHERWISE.
EW R-
133735_2B-EWR-WIW-XX-DR-CS-000001.
ng Num ber
133735_2B-EWR-WIW-P1-DR-CS-010001 TO
(TYP.)
SHEET PILE AZ24-700 (10m LONG) 133735_2B-EWR-WIW-P1-DR-CS-010003.
Dr
080002
v. EARTHWORKS DRAWINGS.
PRECAST "L" WALL
6.FOR SAFETY, HEALTH AND ENVIRONMENT INFORMATION
CS-
REFER DRAWING No. 133735_2B-EWR-WIW-XX-DR-CS-XXXXXX.
PLATFORM - 2
DR-
ACCESS STEP
P1-
FOUNDATION
WIW-
130x260 OPENING FOR 85mm DIA. DUCT FOR 3No. 120mm DIA. DUCT FOR 130x260 OPENING FOR
PRECAST "L" WALL
EW R-
ELECTRICAL/TELECOM ELECTRICAL/TELECOM ELECTRICAL/TELECOM ELECTRICAL/TELECOM
CABLE ENTRY CABLE ENTRY CABLE ENTRY CABLE ENTRY
NG No.133735_2B-
DOWN BLETCHLEY
PROPOSED TRACK
ON REFER DRAW I
UP BLETCHLEY
TYPICAL JOINT BETWEEN L-WALL TOWARDS 85mm DIA. DUCT FOR 3No. 120mm DIA. DUCT FOR 130x260 OPENING FOR
END L-WALL, REFER DRAWING No. ELECTRICAL/TELECOM PRECAST "L" WALL ELECTRICAL/TELECOM ELECTRICAL/TELECOM
133735_2B-EWR-WIW-P1-DR-CS-XXXXX. CABLE ENTRY CABLE ENTRY CABLE ENTRY
NUATI
FOR CONTI
ACCESS STEP
FOUNDATION
PLATFORM - 1
Status Suitabilty
SHEET PILE AZ24-700 (10m LONG)
WIP - Design S0
(SETTING OUT SHOWN INDICATIVELY)
EARTHWORK EMBANKMENT
SHEET PILE AZ30-750 (9.5m LONG)
INFILL CONRETE
(SETTING OUT SHOWN INDICATIVELY)
Project
Phase 2B - EWR2
Winslow Station
Proposed Platform
Foundation Plan
Designed Signed Date
--- --- ---
Drawn Signed Date
Sanjay Thezhukkil S. Thezhukkil 05/08/19
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 0 of 0
Alternative Reference Revision
0 2 4 6 8 10m B01
Drawing Number
SCALE 1:100
133735_2B-EWR-WIW-P1-DR-CS-080001
sion
01
KEY PLAN : 1:2500
on & Ver
AD
RO
02.
OD
WO
EXI
STI
NG GASSTATI
ON
OR
B01.
TH
B
si
EA
U
C
K
I
GR
N
Revi
G
H
A
M
R
O
A
D
B
U
C
K
IN
G
LE H
NG A
SI M
ED NG R
OS LDI O
OP UI A
D
PR EYB
OR
ST
DR-
P1- 080002
CS-
NOTES:
W-
NOTED OTHERWISE.
FOOTBRIDGE COLUMN
EW R-
PEDESTAL (TYP.)
2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
IN-SITU CONCRETE
UPSTAND 3.FOR GENERAL NOTES REFER DRAWING NO.
133735_2B-
INFILL CONRETE
Dr
EARTHWORK EMBANKMENT TYPICAL JOINT BETWEEN L-WALL TO L-WALL 5.DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
PRECAST "L" WALL REFER DRAWING No.
133735_2B-EWR-WIW-P1-DR-CS-XXXXX. i. ARCHITECTURAL DRAWINGS.
PRECAST "L" WALL 133735_2B-EWR-WIW-01-DR-A-010004.
ii. DRAINAGE DRAIWINGS.
400
PEDESTAL WITH LIFT PIT LMR 133735_2B-EWR-WIW-XX-DR-DR-000015 TO
SHEET PILE AZ24-700 (10m LONG)
FOOTING
133735_2B-EWR-WIW-XX-DR-DR-000031
(SETTING OUT SHOWN INDICATIVELY)
400 iii.ELECTRICAL DRAWINGS.
iv.MECHANICAL DRAWINGS.
080001
v. EARTHWORKS DRAWINGS.
ACCESS STEP
FOUNDATION
P1-
W-
PILE CAP
PLATFORM DRAINAGE
CABLE ENTRY 133735_2B-EWR-WIW-P1-DR-CS-XXXXX.
NG No.133735_2B-
DOWN BLETCHLEY
PROPOSED TRACK
ON REFER DRAW I
UP BLETCHLEY
140x140 OPENING FOR 140x140 OPENING FOR PRECAST "L" WALL TYPICAL JOINT BETWEEN L-WALL TOWARDS
IN-SITU CONCRETE 140x140 OPENING FOR
ELECTRICAL/TELECOM PLATFORM DRAINAGE END L-WALL, REFER DRAWING No.
PILE CAP PLATFORM DRAINAGE
CABLE ENTRY 133735_2B-EWR-WIW-P1-DR-CS-XXXXX.
NUATI
ACCESS STEP
FOR CONTI
FOUNDATION
PLATFORM - 1
Status Suitabilty
IN-SITU CONCRETE
UPSTAND
FOOTBRIDGE COLUMN
PEDESTAL
Project
Phase 2B - EWR2
Winslow Station
Proposed Platform
Foundation Plan
Designed Signed Date
--- --- ---
Drawn Signed Date
Sanjay Thezhukkil S. Thezhukkil 13/08/19
Checked Signed Date
--- --- ---
Approved Signed Date
--- --- ---
Scale(s) ELR - Project Chainage (Miles Yards)
Normal 0 of 0
Alternative Reference Revision
0 2 4 6 8 10m B01
Drawing Number
SCALE 1:100
133735_2B-EWR-WIW-P1-DR-CS-080002
si
01
KEY PLAN : 1:2500
on & Ver
C D
02.
030015 030015
B01.
COLUMN SCHEDULE
N
si
H J K L M N
Revi
N
REFERENCE MEMBER SIZE
485 5500 6500 6500 6500 5500 485
SC1 CHS 193.7x6.3
200x220 HIGH CONCRETE
SC2 UC 254x254x107
400
2500 2000 UPSTAND TO SUPPORT 2500 2000
1250
1250
010015
CURTAIN WALL
- -
400mm THK. REFERENCE MEMBER SIZE
1400
1400
DR-
4200
SLAB EDGE
SB1 UB 305x165x54
ZZ-
SB2 UB 305x165x40
1450
1450
NOTES:
W-
NOTED OTHERWISE.
790
SC2 SC2 SC2 SC2 SC2
BRACING SCHEDULE
EW R-
5750
IN-SITU SLAB HB1 EQA 60x60x8
2325 FOR ELECTRICAL (TYP.)
ng Num ber
1060
4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
VB2 EQA 60x60x8
CP3 (TYP.)
DRAWINGS
1385 IN-SITU CONCRETE 133735_2B-EWR-WIW-ZZ-DR-CS-030015.
INTERFACE PILECAP 485 3250 STRONG GUARD
awi
PURLIN SCHEDULE
)
FOUNDATION 5.DRAWING TO BE READ IN CONJUCTION WITH RELEVANT
TYP.
1285
300
1060
TYP.
850 25 25
Dr
850
i. ARCHITECTURAL DRAWINGS.
(TYP.)
(
REFERENCE MEMBER SIZE 133735_2B-EWR-WIW-XX-DR-A-000001
(
13
755
SC2 SC2 SC2 SC2 SC2 SC2 133735_2B-EWR-WIW-XX-DR-A-000002
3285
B B 133735_2B-EWR-WIW-01-DR-A-010004
25
P1 142 Z 20 (METSEC)
2530
133735_2B-EWR-WIW-P1-DR-A-010005
2230
1775
1385
2780
- - 133735_2B-EWR-WIW-P1-DR-A-010006
133735_2B-EWR-WIW-P1-DR-A-010007
610
610
ID HAZARD DESCRIPTION
CP3 CP3 133735_2B-EWR-WIW-ZZ-DR-A-010011
550
EWR2-HAZ-03095 Disproprtionate, collapse the columns supporting staircases, 133735_2B-EWR-WIW-ZZ-DR-A-010012
footbridge & station building ii. DRAINAGE DRAIWINGS.
3735
IN-SITU CONCRETE 133735_2B-EWR-WIW-XX-DR-DR-000015 TO
FENCE FOUNDATION 1180 3600 1720 133735_2B-EWR-WIW-XX-DR-DR-000031
EWR2-HAZ-03096 Platform sheet piles/ bored pile location/ out of plumb of sheet
iii. ELECTRICAL DRAWINGS.
piles beyond +/- 75mm design limit
133735-2B-EWR-WIW-P1-DR-EP-010001
133735-2B-EWR-WIW-P1-DR-EP-010002
EWR2-HAZ-03097 Train derailment: Train derailment impacting high level platform,
C D staircase, footbridge, lift structure.
133735-2B-EWR-WIW-ZZ-DR-EP-010001
133735-2B-EWR-WIW-ZZ-DR-EP-010002
030015 030015 133735-2B-EWR-WIW-00-DR-EP-010003
EWR2-HAZ-02719 Decommissioning of station platform: Concentrated buried and
133735-2B-EWR-WIW-00-DR-EP-010004
services.
iv. MECHANICAL DRAWINGS.
133735_2B-EWR-WIW-00-DR-M-010001
1 GROUND FLOOR PLAN EWR2-HAZ-03092 Soil erosion: Secondary means of escape stair(SME1 & 2) 133735_2B-EWR-WIW-00-DR-M-010002
lighting column foundation. 133735_2B-EWR-WIW-00-DR-M-010003
- SCALE1:100
v. EARTHWORKS DRAWINGS.
EWR2-HAZ-03093 Platform sheet piles: During any platform modification or future 133735-2B-EWR-WIW-P1-DR-RT-000002
works 133735-2B-EWR-WIW-P1-DR-RT-000003
133735-2B-EWR-WIW-P1-DR-RT-000006
133735-2B-EWR-WIW-P1-DR-RT-000007
EWR2-HAZ-03094 Likelyhood of high water table at cutting
1070 1070
ID HAZARD DESCRIPTION
C D
EWR2-HAZ-00577 Winslow steep longitudinal track gradient
030015 030018
EQ. EQ. EQ. EQ. EQ. EQ. 3250 3250 EQ. EQ.
1035
EWR2-HAZ-01779 Overhead HV cable crossing and high pressure gas main in the
4 (Overhead HV Cable) vicinity
SB2 SB2 SB2 SB2 SB2 SB2 SB2
050020
SB2
SB2
SB2
SB2
SB2
EWR2-HAZ-01784 Underground extra HV cable, LV underground cable, high
SB2 (Buried Services) pressure and medium pressure gas main, water mains and
SB2 SB2 SB2 SB2 SB2
15 comms cable all in the area
A SB2 A
3 1 EWR2-HAZ-03098 Secondary means of escape stairs (SME1 & 2) sits on B01 13/12/19 --- --- ---
030015 030015
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
SB2
embankment slope
1
H
B
4200
H
1
Status Suitabilty
2 5 EWR2-HAZ-03100 Existing underground high pressure gas main at north of car park
WIP - Design S0
050020 050020
EWR2-HAZ-03101 Existing underground high & low voltage line passing through
SB2 SB2 SB2 SB2 SB2
proposed car park and station building
14 SB2 SB2
6 EWR2-HAZ-03102 The extent of underground proposed gas line at Bloor Home side
is not known - may leave impact with secondary means of
050020
escape stair landing (SME1)
SB2
SB1
SB2
SB1
SB2
SB1
SB2
SB1
SB2
SB1
SB2
SB1
SB2
1
1
H
H
1
1
HB
HB
HB
HB
B1
B1
B1
HB
HB
HB
5750
1
EWR2-HAZ-03103 Existing underground high & low voltage line, foul drainage line at
Bloor Home side close to secondary means of escape stair
(SME1)
Project
SB2
SB2
SB2
SB2
SB2
030015 030015 Phase 2
SB2 SB2 SB2 SB2 SB2 SB2 SB2
830
Drawing Title
C D Phase 2B - EWR2
030015 030018
Winslow Station
Station Building
Ground And Roof Plan
Designed Signed Date
FOR ROOF PURLIN DETAIL REFER DRAWING No. --- --- ---
2 ROOF BEAM LAYOUT 133735_2B-EWR-WIW-ZZ-DR-CS-030015.
Drawn Signed Date
Sanjay Thezhukkil S. Thezhukkil 20/09/19
- SCALE1:100 Checked Signed Date
--- --- ---
THIS DRAWING IS BASED UPON
Approved Signed Date
i. UTILITIES MODEL - 133735_RW-EWR-EWL-XXXXXXXX-M2-U-010001 --- --- ---
ii. PROPOSED TRACK MODEL - 133735_2B-EWR-OXD-XX-M3-RP-000208
Scale(s) ELR - Project Chainage (Miles Yards)
iii. TOPOGRAPHICAL SURVEY MODEL - 133735_2B-EWR-OXD-XX-M2-T-000004
1:100 OXD - 7m 802y
iv. EARTH WORK MODEL - 133735_2B-EWR-WIW-00-M3-CE-010001
Design Package Risk Classification Sheet
v. OS MAP - OBB12_SP7628
Normal 0 of 0
Alternative Reference Revision
0 2 4 6 8 10m B01
Drawing Number
SCALE 1:100
133735_2B-EWR-WIW-ZZ-DR-CS-010015
si
01
on & Ver
FOR ROOF PURLIN DETAIL REFER DRAWING No. 1.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
01.
133735_2B-EWR-WIW-ZZ-DR-CS-030015. NOTED OTHERWISE.
A
B01.
si
050020 2.ALL LEVELS ARE IN METRES UNLESS NOTED OTHERWISE.
Revi
15
M STIFFENER PLATE WELDED UB305x165x40 3.FOR GENERAL NOTES REFER DRAWING No.
133735_2B-EWR-WIW-XX-DR-CS-000010 AND 000011.
BETWEEN FLANGES ON
UB305x165x40
EITHER SIDE OF THE BEAM
UB305x165x40 M UB305x165x40 RSA 60x60x8 UB305x165x40
4.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
UB305x165x40
GUSSET PLATE DRAWINGS
050020
UB305x165x40
iv. MECHANICAL DRAWINGS.
15 v. EARTHWORKS DRAWINGS.
ZZ-
050020 050020
B B
ng Num ber
050020 050020
15 15
20
PLATE WELDED PLATE WELDED TO
FIN PLATE WELDED END PLATE WELDED
TO BEAM BEAM FLANGE
UB305x165x40 TO BEAM WEB TO BEAM
GRADE 8.8 PLATE WELDED BRACING PLATE WELDED
RSA 60x60x8
RSA 60x60x8 BOLTS TO COLUMN TO COLUMN
UB305x165x40 UB305x165x40 RSA 60x60x8 STIFFENER PLATE WELDED GRADE 8.8 BOLTS
GRADE 8.8 BOLTS GRADE 8.8 BOLTS D
20
TO BOTH SIDE OF BEAM WEB
CHS193.7x6.3
050020
E E COLUMN
050020 050020 F
050020
C SECTION 03 DETAIL D SECTION 04 DETAIL E SECTION
050020 SCALE1:10 010015 SCALE1:10 050020 SCALE1:10 010015 SCALE1:10 050020 SCALE1:10
H
G M 050020
050020
N
PLATE WELDED
UB305x165x40
TO COLUMN UB305x165x40
FIN PLATE WELDED GRADE 8.8 BOLTS
UB305x165x40 TO BEAM WEB
STIFFENER PLATE WELDED TO PLATE WELDED TO BEAM
FLANGE AND STIFFENER UB305x165x40 UB305x165x40
BOTH SIDE OF BEAM WEB GRADE 8.8 BOLTS
AND TOP AND BOTTOM FLANGE GUSSET PLATE
WELDED TO
BEAM WEB
PLATE WELDED TO BEAM B01 18/12/19 --- --- ---
END PLATE WELDED
FLANGE AND STIFFENER
TO BEAM 14 14 Rev Date Description of Revisions Dsnd Chkd Appr
Normal 0 of 0
Alternative Reference Revision