Professional Documents
Culture Documents
Final Inspection
08572-TRHT-AQ-QC-00-OO-206 FRM 03
Inspection Flash Report
Note:
1.This report must be completed by hand/typed while at the Vendor and E-mailed from the vendor to Inspection
Coordinator and Functional Quality Engineer of Petrofac.
2.Any NCR observed during Inspection shall be notified to PECO Quality Engineer within 24 hours of Inspection for issuance
and concurrence.
Inspector detail :
Fahad Ahmad
Name
Signature
29/07/2020
Date
08572-TRHT-AQ-QC-00-OO-206 FRM 03