You are on page 1of 10

 

 
Drilling Abbreviations for Drilling Reports 
 

 ACZ ‐ acidize  
 ACZD ‐ acidized  
 AD ‐ authorized depth  
 ADDL ‐ additional  
 AFE ‐ Authority for Expenditure  
 AIR ‐ average injection rate  
 ALL ‐ allowable  
 ANH ‐ anhydrite  
 API ‐ American Petroleum Institute  
 AR ‐ acid residue  

 BAR ‐ barrels acid residue  
 BBL ‐ barrel  
 BHA ‐ bottom hole assembly  
 BHP ‐ bottom hole pressure  
 BHPF ‐ bullet holes per foot  
 BHT ‐ bottom hole temperature  
 BK ‐ break, broke  
 BKDN ‐ break down, broke down  
 BL ‐ blow  
 BLR ‐ bailer  
 BO ‐ barrels oil  
 BOLYR ‐ barrels oil load yet to recover  
 BOP ‐ blowout preventer  
 BOPD ‐ barrels oil per day  
 BOT ‐ bottom  
 BPD ‐ barrels per day  
 BPM ‐ barrels per minute  
 BPV ‐ back pressure valve  
 BS ‐ bottom settlings  
 BW ‐ barrels water  
 BWPD ‐ barrels of water per day  


 
 
C

 C/O ‐ clean out  
 CB ‐ core barrel  
 CCL ‐ casing collar locator  
 CD ‐ calendar day  
 CH ‐ chert  
 CH ‐ casing head  
 CHG ‐ change  
 CI ‐ close in  
 CIP ‐ closed in pressure  
 CIRC ‐ circulate  
 CIV ‐ chemical injection valve  
 CIWOS ‐ closed in waiting on storage  
 CK ‐ choke  
 CL ‐ collar locator  
 CM ‐ condition  
 CMT ‐ cement  
 COMM ‐ communication  
 COMP ‐ complete  
 COND ‐ condition  
 CONTG ‐ continuing  
 CONTR ‐ contract, contractor  
 CONX ‐ connection  
 COR ‐ corrected, correction  
 CP ‐ casing head pressure  
 CSG ‐ casing  
 CT ‐ cable tools  
 CTL ‐ cumulative time lost  
 CTU ‐ coil tubing unit  
 CVGS ‐ cavings  
 CZR ‐ centralizer  

 DC ‐ drill collar  
 DD ‐ drill deeper  
 DEG ‐ degree  
 DESGN ‐ designated  
 DFE ‐ derrick floor elevation  
 DIC ‐ diamond core  
 DISM ‐ dismantle  
 DISPL ‐ displace  
 DK ‐ derrick  


 
 
 DN ‐ down  
 DOLO ‐ dolomite  
 DP ‐ drill pipe  
 DRIBL ‐ drillable  
 DRLD ‐ drilled  
 DRLG ‐ drilling  
 DST ‐ drill stem test  
 DWA ‐ drilling with air  
 DWKS ‐ draworks  
 DWM ‐ drilling with mud  
 DWO ‐ drilling with oil  
 DWSW ‐ drilling with salt water  
 DWW ‐ drilling with water  

 EL ‐ electric log  
 ENG ‐ engine  
 EQPT ‐ equipment  
 ERD ‐ extended reach drilling  
 ESA ‐ estimated schedule allowable  
 EST ‐ estimated  

 °F ‐ degrees Fahrenheit  
 FBH ‐ flowing by heads  
 FE ‐ floating equipment  
 FIH ‐ finish in hole  
 FJ ‐ fishing job, flush job  
 FL ‐ fluid level  
 FLD ‐ flowed  
 FLG ‐ flowing  
 FLSHD ‐ flushed  
 FLU ‐ fluid  
 FNSH ‐ finish  
 FORM ‐ formation  
 FP ‐ flowing pressure  
 FPI ‐ free‐point indicator  
 FPSO ‐ floating production storage offloading vessel  
 FRAC ‐ fracture  
 FSHD ‐ fished  
 FSHG ‐ fishing  
 FV ‐ float valve  


 
 
 FW ‐ fresh water  
 FWKO ‐ free water knock out  

 GAL ‐ gallon  
 GB ‐ gun barrel  
 GBW ‐ gelled brine water  
 GCM ‐ gas cut mud  
 GE ‐ ground elevation  
 GIH ‐ going in hole  
 GL ‐ gas lift  
 GND ‐ ground  
 GOM ‐ Gulf of Mexico  
 GOR ‐ gas to oil ratio  
 GPFV ‐ Gravel Pack Flapper Valve  
 GPM ‐ gallon per minute  
 GR ‐ gamma ray  
 GR&N ‐ gamma ray and neutron  
 GTV ‐ gravity  
 GV ‐ gas volume  
 GVNM ‐ gas volume not measured  

 HD ‐ hard  
 HP ‐ hydrostatic pressure  
 HVY ‐ heavy, heavily  
 HW ‐ hook‐wall  

 IND ‐ indicator, indicated  
 INJ ‐ inject, injection  
 INT ‐ interval  
 IP ‐ initial production  

 JB ‐ junk basket  
 JK ‐ junk  
 JS ‐ junk snatcher  
 JSPF ‐ jet shots per foot  
 JT ‐ joint  


 
 
K

 KDB ‐ Kelly drive bushing  
 KDBE ‐ Kelly drive bushing elevation  
 KH ‐ reservoir flow capacity  
 KLD ‐ killed  
 KO ‐ kickoff  
 KOP ‐ kickoff point  
 KW ‐ killed well  

 LD ‐ laid down  
 LH ‐ left hand  
 LIH ‐ left in hole, lost in hole  
 LL ‐ Laterolog  
 LM ‐ lime  
 LNR ‐ liner  
 LOC ‐ location  
 LS ‐ long string  
 LT ‐ light  

 M/A ‐ mud anchor  
 MA ‐ mud acid  
 MAG ‐ magnetic  
 MATL ‐ material  
 MAX ‐ maximum  
 MCF ‐ thousand cubic feet  
 MCFD ‐ thousand cubic feet per day  
 MD ‐ measured depth  
 MD‐ft ‐ millidarcy feet  
 MDC ‐ monel drill collar  
 MED ‐ medium  
 MI ‐ move in  
 MIN ‐ minute, minimum  
 ML ‐ Microlog  
 MLL ‐ Microlaterolog  
 MMCFD ‐ million cubic feet per day  
 MOBM ‐ mineral‐oil‐based mud  
 MV ‐ move  
 MWD ‐ measurement while drilling  


 
 
N

 ND ‐ nipple down  
 NE ‐ non‐emulsifying  
 NG ‐ no gauge  
 NMDC ‐ non‐magnetic drill collar  
 NONMAG ‐ non‐magnetic  
 NPT ‐ non‐productive time  
 NPT ‐ Nephelometric Turbidity Units  
 NPX ‐ new pool exempt  
 NR ‐ no report  
 NSG ‐ no show of gas  
 NSO ‐ no show of oil  
 NU ‐ nipple up  

 O&G ‐ oil and gas  
 O/E ‐ open‐end  
 OBM ‐ oil‐based mud  
 OCC ‐ Oil Conservation Commission  
 OEM ‐ oil emulsion mud  
 OFS ‐ oil string flange  
 OHGP ‐ openhole gravel pack  
 OIH ‐ oil in hole  
 OL ‐ oil load  
 OLTR ‐ oil load to recover  
 OPNS ‐ operations  
 OS ‐ overshot  

 P&A ‐ plug and abandon  
 P&R ‐ pull and run  
 P/U ‐ pick up, pull up  
 P/U ‐ pickup  
 PB ‐ plugback  
 PBD ‐ plugged back depth  
 PBTD ‐ plugback total depth  
 PC ‐ pin collar  
 PE ‐ pumping equipment  
 PERF ‐ perforating, perforations  
 PG ‐ plug  
 PI ‐ Productivity Index  


 
 
 PKR ‐ packer  
 PLD ‐ pulled  
 PLG ‐ pulling  
 PMPD ‐ pumped  
 POB ‐ people on board  
 POB ‐ pulled off bottom  
 POH ‐ pull out of hole  
 POOH ‐ pull out of hole  
 POROS ‐ porosity  
 POTC ‐ potential  
 PPD ‐ pumped  
 PPG ‐ pounds per gallon  
 PPMCL ‐ parts per million chlorides  
 PPMCLI ‐ parts per million chlorides  
 PREP ‐ prepare, preparing  
 PRES ‐ pressure  
 PROD ‐ produce, production  
 PRSR ‐ pressure  
 PSI ‐ pounds per square inch  
 PSPG ‐ pounds sand per gallon  
 PU ‐ pumping unit  
 PVT ‐ pressure volume temperature  
 PWOW ‐ pumping with other  

 RB ‐ red beds  
 RBR ‐ rubber  
 RD ‐ rig down  
 RDF ‐ reservoir drill‐in fluid  
 RDMOL ‐ rig down move off location  
 RDTP ‐ roundtrip  
 RECD ‐ received  
 RECOV ‐ recover, recovery  
 RED ‐ reduce  
 REFD ‐ refined  
 REG ‐ regular  
 REPL ‐ replace  
 RH ‐ right hand  
 RLSD ‐ released  
 RMD ‐ reamed  
 RNG ‐ running  
 ROT ‐ rotary, rotate  


 
 
 RPT ‐ report  
 RRC ‐ Railroad Commission  
 RT ‐ roundtrip  
 RT ‐ round trip  
 RTCB ‐ round trip to change bits  
 RTNR ‐ retainer  
 RTVBL ‐ retrievable  
 RU ‐ rig up  
 RUMI ‐ rig up and move in  
 RVS ‐ reverse  
 RVSD ‐ reversed  

 S/O ‐ shakeout  
 S/O ‐ slack off  
 S/T ‐ sidetrack, sidetracked  
 SCR ‐ scratcher  
 SCSSV ‐ surface‐controlled subsurface safety valve  
 SD ‐ shut down  
 SD ‐ sand  
 SH ‐ shale  
 SICP ‐ shut‐in casing pressure  
 SIDP ‐ shut‐in drill pipe pressure  
 SJ ‐ safety joint  
 SL ‐ slight, slightly  
 SLM ‐ steel line measurement  
 SLT ‐ salt  
 SM ‐ small  
 SN ‐ seating nipple  
 SPF ‐ shot per foot  
 SPM ‐ strokes per minute  
 SQZ ‐ squeeze, squeezed  
 SRO ‐ surface readout  
 SS ‐ short string  
 SS ‐ string shot  
 SSCV ‐ subsurface control valve  
 SSTT ‐ subsurface test tree  
 ST ‐ start, started  
 ST ‐ slope test  
 STT ‐ shunt tube technology  
 STAB ‐ stabilizer  
 STABLZ ‐ stabilizer  
 STDG ‐ standing  


 
 
 STDS ‐ stands  
 STG ‐ storage  
 STM ‐ steel tape measurement  
 STPGP ‐ single‐trip perforate and gravel pack  
 STPFP ‐ single‐trip perforate and frac pack  
 SULF ‐ sulfur  
 SURF ‐ surface  
 SVC ‐ service  
 SVCU ‐ service unit  
 SW ‐ salt water  
 SWBD ‐ swabbed  
 SWBG ‐ swabbing  
 SWS ‐ sidewall samples  
 SWU ‐ swab unit  
 SX ‐ sacks  

 T&R ‐ tubing and rods  
 TA ‐ temporarily abandon  
 TBG ‐ tubing  
 TCP ‐ tubing conveyed perforating  
 TD ‐ total depth  
 THD ‐ thread  
 TIH ‐ trip in hole  
 TJ ‐ tool joint  
 TOT ‐ throughout test  
 TP ‐ tubinghead pressure  
 TRTD ‐ treated  
 TRTG ‐ treating  
 TS ‐ temperature survey  
 TSIC ‐ temperature survey indicated cement  
 TSTG ‐ testing  
 TSTM ‐ too small to measure  
 TTL ‐ total time lost  
 TVD ‐ total vertical depth  

 UR ‐ under ream  

 VAC ‐ vacuum  


 
 
 VES ‐ visco elastic surfactant  
 VIS ‐ viscosity  
 VS ‐ velocity survey  
 VS ‐ vertical section  

 w/ ‐ with  
 W/H ‐ wellhead  
 W/O ‐ workover  
 W/O ‐ without  
 WI ‐ water injection  
 WIH ‐ went in hole  
 WKD ‐ worked  
 WKG ‐ working  
 WL ‐ waterloss  
 WLYR ‐ water load yet to recover  
 WO ‐ waiting on  
 WOC ‐ waiting on cement to set  
 WOO ‐ waiting on orders  
 WOR ‐ waiting on repairs  
 WOW ‐ waiting on weather  
 WS ‐ whipstock  
 WSHD ‐ washed  
 WSHG ‐ washing  
 WT ‐ weight  
 WTD ‐ waited  
 WTG ‐ waiting  
 WTR ‐ water  

10 
 

You might also like