You are on page 1of 1

2. Hole is or 9.

5 IWgal completion fluid,

3. set a Uni.PackerX (3.500" SEAL BORE) on wireline in 7", 29 lb&'tt CASING at 9036 feet
(nrai$t hole).
4. Run seal asembb' on 2-7/8". 6.5 lbsitt. N-80 tubing, sting into peker. and land with
17000 poands of weight.

5. Apply a maximum of 1500 psi the cuing annulus.

6. Ftæ below the packet mth 5000 to 7000 pg on tubing uging93000 gal of 122 Ibe/gaj frac
fluid. (Expect in bient temperature of 600F.)

You might also like