1 To apply permit to work prior any hot works

2 The site safety supervisor and or site supervisor to conduct prior briefing of SWP, RA
and site instructions to all workers through toolbox meeting or first day at work orientation.
3 Welding cables shall be connected or spliced in an approved manner .There shall be no
exposed metal part in any splice.

4 Welding equipment shall be equipped with a fire extinguisher at all time .Ensure the fire
extinguisher is in good working condition and fully refilled after each use.

5 Welding electrode holder is in good working condition.

6 Ensure that weld splatters or sparks do not come into contact with flammable materials.
7 DO NOT use welding equipment unless you have been trained to use it.

8 To ensure the hot work area is free from combustible materials

9 To use/put on PPE e.g. head shield, welding glove, etc.

10 LEW check and subsequence every month inspection are maintained.


CUTTING EQUIPMENT
1 To apply permit to work prior any hot works

2 The site safety supervisor and or site supervisor to conduct prior briefing of SWP, RA
and site instructions to all workers through toolbox meeting or first day at work orientation.

3 Ensure all gas cylinder are secured in upright position at all time.

4 Check regulators for leakage and replace immediately if it is faulty.

5 Check all hoses for leak and ensure securely join and fasten with approved types of clips.
6 Check cutting torch for damage , replace if necessary.

7 Ensure flash back arrestors are installed at both ends and are in working condition.

8 Fire Extinguisher is provided near to equipment.

9 No Smoking 'notice or proper warning sign shall be placed near the equipment.

10 To use/put on PPE e.g. head shield, welding glove, etc.