Professional Documents
Culture Documents
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
CHAPTER 1
STEEL POLES, CROSS ARM ASSEMBLIES, GUY SETS AND OTHER ACCESSORIES FOR
22kV AND 0.4kV DISTRIBUTION LINES
CONTENTS
Contents Chapter - 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
CHAPTER 1
STEEL POLES, CROSS ARM ASSEMBLIES, GUY SETS AND OTHER ACCESSORIES FOR 22kV AND 0.4kV
DISTRIBUTION LINES
1.0 SCOPE
1.1 These specifications cover the design, engineering, manufacture, assembly, testing at
manufacturer's works before dispatch of octagonal tubular steel poles, cross arm
assemblies, guy sets, danger plates, GI spike earthing sets for 22kV Single pole and 0.4kV
Distribution line, Suspension and Tension Fittings suitable for 120 sq.mm. AAAC Conductor
for use on 3 phase, 50 Hz, solidly earthed 22kV Overhead lines and Suspension & Anchoring
assemblies for LT ABC at various construction sites for 22/0.4kV distribution network, for
Power Distribution in Double Bridge: Pipeline Police Academy GAP and Du port road-
Rehab GAP in Monrovia, Liberia.
1.2 The design and workmanship shall be in accordance with the best engineering practices to
ensure satisfactory performance throughout the service life.
1.3 Any material and equipment not specifically stated in this specification but which are
necessary for satisfactory operation of the equipment shall be deemed to be included unless
specifically excluded and shall be supplied without any extra cost. Components having
identical rating shall be interchangeable. The bidder has to furnish the testing facilities
2.0 STANDARDS
The steel poles, cross arm assemblies, cross brace assemblies and pole guard arms, guy sets,
earthing sets etc. shall conform to therelevant IEC standards and any other equivalent
neutrally acceptable International Standards (as amended upto date) mentioned below shall
be applicable to the materials and processes used in the manufacturing of these equipment:
Table 1
ISO 20805:2005 : Hot-rolled steel sheet in coils of higher yield strength with improved
formability and heavy thickness for cold forming
BS 3288 : Part 1: 2014 : Insulator and conductor fittings for overhead power lines.
Performance and general requirements
ISO 10684:2004 : Fasteners Hot dip galvanized
ISO 10721 : Steel structures
Page 1 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Page 2 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
3.5 The bolts, nuts & pack washers and guy wire strand & cross arm guard wire shall be hot dip
galvanized as per ISO 1461:2009(en) or other relevant international standards. The quality
of zinc shall be at least Zn 98 grade specified in ISO 752:2004. The zinc coating shall be
adherent, smooth, reasonably bright, continuous and free from such imperfections and flux,
ash and dross, inclusions, flake and black spot, pimples, lumpiness and runs.
3.6 The steel poles shall be hot dip galvanized with minimum 125 micron thickness of zinc
coating and steel base plates with minimum 125 micron thickness of zinc coating generally
as per ASTM A123 and tested as per relevant international standards..
3.7 The articles shall withstand minimum 4 dips of one minute duration. The uniformity of
galvanized coating shall be determined by the preece test as prescribed in ASTM A123.
3.8 Suspension and Tension Fittings shall be made of Aluminum Alloy and all nuts and bolts shall
be made of hot dip galvanized steel with minimum thickness of zinc coating of 85 micron as
per ISO 10684:2004(en) Part XIII or other relevant international standards..
Employer.
Design of Poles shall be worked out and checked preferably as per ASCE Manual- 72 / SEI -
48- 05 or other relevant international standards. Poles shall be pre-drilled and supplied
complete with pole top cap and base plate.
4.1.2.1 Poles shall be designed to withstand the worst possible combination of simultaneous
loading of
• Lateral loads consisting of wind forces on conductors corresponding to wind spans, wind
Page 3 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
4.1.2.2 Steel poles for HV (22 kV), HV / LV mixed shall be worked out for the following types and
applications:
The following span lengths may be considered for adoption (as per relevant IEC)
Table 3
Nominal System Voltage kV Number of circuits Span Range (m)
(rms)
22 1 80-110
LV Lines:
Table 4
S.N. Type of pole Nominal Application Working load
Height
i. Alignment Pole (AL) 9m Angle up to 2° 190 daN
ii. Section Pole 9m All other locations and angle up to 90° 550 daN
4.1.2.3 Contractor shall submit the detailed design & drawing of pole for each above said 22kV
Transmission line for approval of Client and sample drawing showing dimension &
Page 4 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
4.1.2.9 Guying
Poles for small angle locations (0 - 30°) shall be self-supporting. However; the poles for
larger angle and terminal locations in un-inhabited areas can be provided with Anchor
Guys placed the direction of the bi-sector of the angle at angle locations or length wise at
the terminal locations. In the inhabited areas guys are not allowed; but Struts or two
poles mechanically secured together can be deployed.
Page 5 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
i. Poles shall be fabricated by cold bending of steel sheets of appropriate size and length in
to octagonal shape and single continuously welded joint. The welding shall be done in an
inert atmosphere preferably under a nitrogen jacket.
ii. All welding, cutting, machining, and fabrication shall be done prior to galvanization.
iii. The Poles shall be straight, smooth, octagonal and conical and shall be well finished,
clean, and free from burs, indentations and other surface defects.
iv. Holes and earthing arrangements shall be provided as per structure drawings. All holes
and pole top shall be blocked with plastic plugs / tightly fitting plastic cap to avoid entry of
water into the hollow of the pole.
v. Two M-12 earthing studs placed diametrically opposite and flush welded with internal
surface of the pole; complete with M-12 GI Nut, Bolt, Plain and Spring washer set, shall be
provided each at 2700 mm below pole top and 500 mm below ground level in HV line
poles and at 400 mm below pole top and 500 mm below ground level for LV line poles.
vi. Ground level shall be marked with a 12 mm wide paint strip all around in black color.
vii. A prototype pole as per approved design shall be fabricated and tested at an authorized
approved test bed as per IEC: 60652 or may be mutually agreed up to breaking load in the
presence of the inspectors of the Client before proceeding with mass fabrication of the
poles.
Description 11m
Basic 100
Span (m) Wind 110
Weight 150
Wind pressure On pole 1200
(N/m2) On conductors at 10°C 600
Vertical loads 1.18
Transverse loads 1.8
Longitudinal loads 1.8
Factor of Safety
Ultimate load 1.8
Conductor minimum
3.0
breaking strength
Planting Depth (m) 1.6*
Page 6 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
ii. Straightness
The finished pole shall not be out of straightness by more than 1/600 of its length.
The rolling and cutting tolerance for hot rolled steel products shall be in accordance with
relevant international standards.
4.1.3 Tests
The following tests shall be conducted in accordance with IEC: 60652:
i. Visual Check and Verification of Dimensions: Visual Check and Dimensional Verification
of poles shall be carried out as per approved drawing.
ii. Tensile and Chemical Composition Tests: Tensile and Chemical Composition tests shall
be made on the steel used for manufacture of poles in accordance with relevant IEC.
iii. Deflection Test: Poles shall conform to the test requirements when tested in accordance
with relevant international standards. Temporary deflection due to applied load at the
point of application of load shall not exceed 157.5 mm.
iv. Permanent Set Test: Permanent set test will be carried out immediately after the
deflection test and the permanent set measured from the zero position after the release
of the appropriate load at the point of application shall not exceed 13 mm.
v. Breaking Load Test: In addition to the above, the poles shall be tested for withstanding
Page 7 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
maximum permissible loads, i.e. 1.8 times working load without breaking or deforming
and the pole shall remain serviceable after removal of the load.
B M Q P MQP nd submit all
relevant records to the inspector of the Client / Purchaser along with call for inspection.
Testing shall be done on the required number of poles of each type / size as per standard
sampling plan prescribed here in. Tests shall be done by supplier / manufacturer at an
authorized / approved test bed in the presence of the inspector of the Client and / or
representative of the Purchaser.
4.1.5 Marking
The poles shall be marked with designation, manufacturer's identification and year of
manufacture. The poles shall also be marked with BIS certification mark if applicable.
4.2.1 The cross-arm assemblies for single pole structure including pole clamps and Top
Hamper for Pin Insulator shall be supplied as assembled cross arms for 22 kV octagonal
pole lines.
4.2.2 Specific Constructional Requirements
4.2.2.1 Cross-arms shall be made out of 100 x 50 x 6.4 mm M.S. Channel
4.2.2.2 The cross arm shall be hot dipped galvanized as per relevant international standards.
4.2.2.3 The cross-arm should not be welded/ jointed at any place except as specified.
4.2.2.4 The clamps for the cross-arm shall be of G.I. & shall be hot dipped galvanized as per
Page 8 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
ii) The following shall constitute Type Tests for Fittings except Clamps:
a. Visual Examination;
b. Verification of Dimensions;
Page 9 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Bidder shall submit along with his bid, copies of reports of all type tests conducted within
last 7 years on Suspension and Tension Fittings of identical design and specification at NABL
(National Accreditation Board for Testing and Calibration Laboratories) accredited
laboratories.
ii) The following shall constitute Acceptance Tests for Tension Fittings except Clamps:
a. Visual Examination Test;
b. Chemical Composition Test;
c. Galvanization Test (for nuts, bolts and washers).
d. Verification of Dimension; and
e. Ultimate Strength Test;
4.3.5. Inspection
Page 10 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
All acceptance tests, routine tests and inspection shall be made at the place of manufacture
unless otherwise especially agreed between the Client/Consultant and the manufacturer.
The manufacturer shall wi
facilities to satisfy him that material is being furnished in accordance with this specification.
4.3.6. Marking
Each Suspension and Tension Clamp shall carry the following information embossed/
indelibly inscribed thereupon:
i) Name or trade mark of the manufacturer;
ii) Month and year of manufacturer;
iii) Country of manufacturer; and
iv) Any other information as agreed between the client and the Contractor.
4.3.7. Packing
For packing, wooden cases / Boxes / Double Gunny bags shall be used. The packing shall be
fit to withstand rough handling during transit and storage at destination. The heads and
threaded portion of fasteners fitting should be properly protected against damage. The
gross weight of the packing shall not normally exceed 50 kg per box or case. All different
fitting components shall be packed in different cases and shall be completed with minor
accessories fitted in places. All Nuts shall be hand- tightened over the bolts and screwed
upto the farther point. The packing list should be got approved by the tenderer before
dispatching the material.
Page 11 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
• The clamp should conform to the standard NFC 33-041 and 33-042.The clamp body should
be made of corrosion resistant Aluminum alloy, bail should be of stainless steel and
wedges should be weather and UV resistant polymer.
• Ultimate tensile strength of the clamp should not be less than 15 KN for 50/70sq.mm
insulated messenger wire & 10 KN for 25/35 sq.mm insulated messenger wire.
• Slip load of the clamp should not be less than 3 KN for 50/70 sq.mm. Messenger wire & 2
KN for 25/35 sq.mm messenger wire.
Table 5
Page 12 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Table 6
Page 13 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
After fitting the insulated messenger in the clamp, load T start will be held for 1 minute &
then load increased to T final at rate between 5000 7,500 N/mtr. In each case there shall
be no breakdown of any part of clamp and slippage of messenger in relation to the clamp.
Page 14 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
4.4.4.1. Suspension Assembly is used for supporting an ABC by installation on the messenger at an
intermediate point of support such as a pole. It can accommodate small angles of deviation
upto 30°.
4.4.4.2. Suspension Assemblies shall be supplied in sets to ensure compatibility of the materials
against corrosion or wear of rotating/moving parts.
4.4.4.3. Each Suspension Assembly shall consist of:
• One number Suspension Bracket.
• One number moveable (articulated) connecting link.
• One number Suspension Clamp.
4.4.4.3.1. Suspension Bracket of SA:
▪ The Suspension Bracket shall be made from single piece aluminum alloy suitable for
attachment to a pole by either:
• 16 mm galvanized steel bolt or
• Two stainless steel straps.
• The Suspension Bracket shall be provided with an upper bulge to prevent the clamp from
turning over on the Bracket for more than 45 mm from the horizontal or to within less than
60 mm from the pole / fixing structure.
• The Suspension Bracket should be so designed to ensure that the articulated link cannot slip
out of it.
• Suspension Brackets shall be designed to withstand a load applied at the anchoring point of
the movable link as per Table 7 below without deformation of more than 10mm or
breakdown (there should be no longitudinal component of load parallel to the plane of
fixing).
Table 7
Conductor Size Normal Load
Sq. mm. Dia. (mm) rating (N)
(kg)
25-35 8-11 1500Kg. 12500
Page 15 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Page 16 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Page 17 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
4.5.4.2. The turn buckle assembly is connected with pole with full clamp as per enclosed drawing.
4.5.6.3. Dimensions
The dimensions of guy strain insulators shall be in accordance with enclosed drawing.
Page 18 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
4.5.6.6. Tests
The insulators shall comply with the following routine, type and acceptance tests as per IEC
60335-2-71
i) Routine Test
Visual examination
The copies of the type tests shall be supplied with the tenders. The supplier shall keep the
Page 19 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
record of routine tests performed by him and furnish the same as and when required by
the client/consultant.
4.5.6.7. Marking
Each insulator shall be legibly and indelibly marked to show the following:
a) Name and trade mark of the manufacturer
b) Year of manufacture
c) BIS certification mark, if any
Marking on porcelain shall be printed and not embossed.
Page 20 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
dia suitable for connecting on one end with the pole and other end to the earthing rod.
The galvanized steel wire strand shall conform to relevant international standards.
4.6.7. The mild steel earthing rod and galvanized stranded steel wire lead (strand) and all bolts &
nuts shall be hot dip galvanized/ electro plated as per relevant international Standard
specification and shall be tested for weight and uniformity of Zinc coating as per relevant
standards.
4.6.8. The tolerances shall be as given below:
• Length = 1/2 %
• Other dimensions = 5%
• Small forged portion (15, 25 and 40 mm) = 10 %
4.6.9. The following additional tests shall be carried.
• Galvanization test
• Dimensional sheet
• Stress test by hammering: (7/8 times) the rods into the normal soil by a hammer.
4.6.10. The forged head of the earthing rod shall carry manufacturer's identification mark.
Page 21 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Page 22 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Page 23 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
vi. Padlocking
Suitable padlocking or other approved locking arrangement shall be provided for locking the
operating handle both in the ON and in the OFF position.
vii. Earthing Terminal
Two earthing terminals having clamping bolts with a minimum diameter of 12mm, with
nuts, washers and spring washers shall be provided on the frame of each pole. The earthing
terminals shall be of electroplated brass and of adequate size to carry full short circuit
current.
viii. Other Features.
• Live parts shall be designed to avoid sharp point edges and other corona producing
surfaces as far as possible.
• The switch blades shall be so assembled that all three phases operate in synchronism.
Fixed guides shall be provided for proper seating of the contacts even when a blade is
out of alignment to a minor extent.
• There should not be any play or backlash to produce non-uniform travel of the blades of
the three phases and all the three phases shall make simultaneous closing with good
electrical contact.
• A suitable arrangement for accelerating the opening of contacts shall be provided to
avoid excessive sparking.
Page 24 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
expansion differential between the metal and porcelain parts through the range of
temperature variation shall not loosen the parts or create undue internal stresses which
may affect the electrical or mechanical strength. Cap and base of the insulators shall be
interchangeable with each other. The cap and base shall be properly cemented with
insulators to give perfect grip. Excess cementing must be avoided.
ii. TEMPERATURE RISE
The maximum temperature attained by any part of the equipment when in service at site
under continuous full load conditions and exposed to the direct rays of Sun shall not exceed
45 degree above ambient.
4.8.4 Tests:
The firm should have all type test certificate including the following:-
1. Temperature-rise tests;
2. Measurement of the resistance of the main circuit;
3. Short-time withstand current and peak withstand current tests;
4. Tests to prove the ability of the switch to make and break the specified currents;
5. Tests to prove satisfactory mechanical operation and endurance;
6. Verification of the protection;
7. Tightness tests; electromagnetic compatibility (EMC) tests.
8. Lightning impulse voltage test with positive & negative polarity.
9. Power Frequency voltage dry test and wet test
10. Milli volt drop tests
Page 25 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
5 GALVANIZATION
5.1 The galvanized bolts & nuts, spring washers etc. shall be tested for uniformity of coating
and weight of zinc as per ISO 1461:2009(en)or other relevant international standards..
The galvanized steel wires of completed steel strand and completed steel strand shall be
tested for routine and acceptance tests as per ISO 1461:2009(en)or other relevant
international standards.
5.2 Uniformity in Thickness
The uniformity in thickness of coating shall be tested in accordance with preece test given
in ASTM A123 M T U Z C A or other relevant
international standards. For quick approximate measurements of thickness, magnetic
gauge duly calibrated may be used. Method of testing uniformity on zinc coated articles
shall be in accordance with relevant international standards.
There shall be a Pole Top Cap to protect the pole from Ingress of water and humidity and
rusting.
Page 26 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
6 INSPECTION
6.1 The bidder shall intimate the manufacturing schedule to the Client/Consultant and give a
I waive of inspection by
the client/consultant, the supplier shall be responsible for successful performance of the
equipment" as per the stipulations of the specification.
7 QUALITY ASSURANCE
7.1 Quality Assurance Program
To ensure that the equipment and services under the scope of this contract, whether
-
sub-
the specification, the Contractor shall submit suitable quality assurance programme for
approval of Consultant/Client to control such activities at all points. Such programmes shall
be outlined by the contractor and shall be finally accepted by Client/Consultant after
discussions on award of Contract. A quality assurance programme furnished by the bidder
shall generally cover the following.
a) Contractor organization structure for the management and implementation of the
proposed quality assurance Programme.
b) Documentation control system
c) Qualification data of contractor key personnel.
d) Procedure for purchase of materials, parts, components and selection of sub-
contractor services including manufacturer, source inspection incoming raw
material inspection, verification of material purchases etc.
Page 27 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
e) System for shop manufacturing and site erection controls including process
control and fabrication and assembly control.
f) Control of non-conforming items and system/steps for correcting such items.
g) Control of calibration and testing of measuring and testing equipments.
h) Inspection and test procedure both for manufacture and field activities.
i) System for indication and appraisal of inspection status
j) System for quality audits
k) System for authorizing release of manufactured product to the client/consultant
l) System for maintenance of records
m) System for handling, storage and delivery; and
n) A quality plan detailing out the specific quality control procedure adopted for
controlling the quality characteristics relevant to each item of equipment
furnished.
7.2 Quality Assurance Documents
The contractor shall be required to submit the following quality Assurance Documents
before dispatch of the equipment
i) All Non-destructive Examination procedures, stress relief and weld repair
procedure actually used during fabrication.
ii) Welder and welding operator qualification certificates.
iii) Welder's identification list, listing welder's and welding operator's qualification
procedure and welding identification symbols.
iv) Material mill test reports on components as specified by the specification.
v) Specification plan with verification, inspection plan check points, verification
sketches, if used and methods used to verify that the inspection and testing
points in the inspection plan were performed satisfactory.
vi) Sketches and drawings used for indicating the method of traceability of the
radiographs to the location on the equipment
vii) All Non-Destructive Examination results reports including radiography
interpretation reports.
viii) Stress relief time temperature charts
Page 28 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
ix) Factory test results for testing required as per applicable codes/standards
referred in the specifications.
The authorized representative reserves the right to carry out Quality Audit and
Quality Surveillances of the Systems and, procedures of the contractor/his
manufacturer's quality management and control activities.
9 DEVIATION SCHEDULE
9.1 The tenderer shall furnish the details of deviation sought by him from the technical
specification and furnish the same along with the tender. In case of Nil deviation the
same may also be indicated in the schedule and furnished with the tender document.
10 TECHNICAL PARTICULARS
Description Specified
Shape Octagonal / Tubular
Steel grade for pole Fe-510 as per ISO 20805: 2005 or ISO 630 or equivalent as
per BSEN- 10025or other relevant international standards.
Steel grade for Base plate RCC M20
Mild Steel plate S275 as per relevant international
standards.
Height of pole m 9m for LV lines, 11m for 22kV lines
Pole Type Octagonal galvanized steel pole
Min. thickness of Zn. coating on Pole Pole = 125 micron
Min. thickness of Zn. coating on Base Plate = 125 micron
Base -plate
Min. Thickness of Zn coating for 85 micron
Nuts and Bolts and Earth Stud.
Page 29 of 30 Chapter 1
Steel Poles & crossarms
Electrification and Grid Upgrade along the CLSG Transmission Line in Monrovia (Liberia)
funded by KfW
Part II, Section-VII E Requirements
Doc No : Volume 1, Section III
Applicable Standards ISO 1461:2009(en), ISO 20805: 2005 and ASCE (American
Society of Civil Engineers) Manual- 72. /SEI 48-05or other
relevant international standards.
Page 30 of 30 Chapter 1
Steel Poles & crossarms