DIASEAL M PLUG

PROCEDURE FOR WEIGHTED MUDS

1 MIX A MINIMUM OF 100 BBLS OF DIASEAL M SLURRY. PULL DRILL PIPE INTO CASING FAR ENOUGH TO HANDLE
SLURRY VOLUME DOUBLE THAT OF OPEN HOLE (MINIMUM 100 BBLS ).
2 PUMP SLURRY OUT OF DRILL PIPE TO BOTTOM OF CASING. MAKE SURE HOLE IS FULL, THEN CLOSE BOP.
PUMP SLURRY INTO OPEN HOLE AT 1 BBL/MIN RATE
3 WHEN OPEN HOLE IS FULL OF SLURRY, SHUT DOWN PUMP AND START STAGING PROCEDURE.
A. PUMP 10 TO 20 BBLS AT 0.5 BBL/MIN MAXIMUM RATE
B. WAIT 10 TO 20 MINUTES AND THEN REPEAT (A) UNTIL HOLDING PRESSURE OF FROM 300 TO 900 PSI IS ACHIEVED.
4 WAIT 2 HOURS AND THEN RESUME OPERATIONS.

PROCEDURE FOR UNWEIGHTED MUDS

1 PULL DRILL PIPE SAFELY ABOVE LOSS ZONE OR INTO CASING. KEEP PIPE MOVING IF IN OPEN HOLE
2 MIX APPROXIMATELY 100 BBLS SLURRY AND PUMP INTO HOLE.
3 PULL INTO CASING AND FILL HOLE THROUGH FILL-UP LINE. IF HOLE DOES NOT FILL, MIX ANOTHER SLURRY AND REPEAT PROCEDURE.
4 IF HOLE STANDS FULL, CLOSE BOP AND PUMP AT 0.5 BBL/MIN RATE UNTIL OBTAINING 300 PSI HOLDING PRESSURE.
IF NO HOLDING PRESSURE IS OBTAINED, WAIT 2 HOURS AND RESUME OPERATIONS.
FORMULA FOR PREPARING DIASEAL M SLURRY WITH OIL FOR 100 BBLS SLURRY.