Calculation of SIDL

14.8
0.2 1.5 0.45 10.5 0.45 1.5 0.2

0.065 thick WC

SIDL REACTION FOROM SUPER-STRUCTURE :


Crash barrier weight = 1 t/m
Railing weight = 0.45 t/m
Cg above Deck Top = 0.40 m

SIDL (CB+RAILING )Forces @ L-T axis at c/L pile cap


Total Vertical Load = 21.7 T
Cg above Deck Top = 0.40 m
Eccentricty in long direction from c/L of pile group = 0.16 m
Eccentricty in trans direction from c/L of pile group = 0m
Moment MLL = 0 Tm
Moment MTT = 3.47536 Tm

Forces @ L-T axis at c/L Pile Cap bottom


Vertical Load (Sup DL Reaction) = 21.721 Tonne
Moment MTT = 3.47536 Tm
Eccentricity along LL-axis eL = 0.16 m
Moment MLL = 0 Tm
Eccentricity along TT-axis eT = 0m
Cg. From pile cap bottom = 5.141 m

SURFACING REACTION FOROM SUPER-STRUCTURE :


2
Wearing coat = 0.2 t/m
Footpath Live load = 0.371 t/m2 */ Included with surfacing
Forces @ L-T axis at c/L pile cap
Total Vertical Load = 28.6 T
Cg of above Deck Top = 0.028 m
Eccentricty in long direction from c/L of pile group = 0.16 m
Eccentricty in trans direction from c/L of pile group = 0m
Moment MLL = 0 Tm
Moment MTT = 4.5699 Tm

Transfering Forces @ c/L of Pile cap


Forces @ L-T axis at c/L Pile Cap bottom
Vertical Load (Sup DL Reaction) = 28.6 Tonne
Moment MTT = 4.5699 Tm
Eccentricity along LL-axis eL = 0.16 m
Moment MLL = 0 Tm
Eccentricity along TT-axis eT = 0m
Cg. From pile cap bottom = 4.77 m