ARKIDOM DEVELOPMENT INC.

SUMMARY OF TASKS
ACCOMPLISHMENTS CURRENT TASKS CONCERNS
from July 13 - 17 from July 20 - 25
DESIGN TEAM
NAME PROJECT NAME
Updated on the exterior massing Developing exterior massing and
JOHANNA TANGGOL Residence
based from last week's comments screen studies
Checking of compiled WBS from all LA and Pool Details to be used as
EDL HOTEL
trades basis for Site Development WBS
Updated interiors based on the Finish the RCP needed for
FAITH TANGGOL Residence changes from the plan, Updated coordination with the consultant;
presentation material Coordinate power layout for electrical
Update interior details working Waiting for comments from the last
DELA PENA RESIDENCE
drawings submitted plan
DETAIL TEAM
Checking of compiled WBS from all LA and Pool Details to be used as
EDL HOTEL
trades basis for Site Development WBS
LORRAINE Finalized architectural details and Finalize interior rendering for 2nd
CHAVEZ Residence elevations; Follow up on the revised floor bedroom areas; Continue with
designs from engineers the preparation of estimates
Detailing of Schedule of Doors and
PATTY TANGGOL Residence Windows, Additional architectural Continuing architectural details
details
Waiting on further comments based
QUERIZA Residence
on the initial plan
DELIVERY TEAM
JERIC DELA PENA RESIDENCE Architectural Interior Fit out WBS
Additional interiors for Memorial
Update on the exterior perspective
CHAVEZ Residence Display and Revision for the study
based on the finalized screen design
area

Coordination works with Electrical Folloy up on the revision based on the Waiting for further comments and
MARVIN MASIGLA Office
Engineers submitted plan prior to construction suggestions
Coordination works with Electrical
TANGGOL Residence
Engineers based on the RCP
Preparation for resuming of
DELA PENA RESIDENCE
construction
NOTES
Transition of application of ARCHICADD Softwares on practice

STATUS OF OTHER PROJECTS:

        KAL Theater – On Hold


        OTTOBOCK - Pending
        PALAYAN GYMNASIUM – On-Hold
        PALAYAN MASTERPLAN – On-Hold
        WONG RESIDENCE – Pending

STATUS OF OTHER CONCERNS:


        Unilab – Pending payment for registration