detailed floor plan on-going design Architectural working 3/8/2019 Batangas Project closed phase drawings. schedule of doors and windows Proposed Design sent to Sir Rendered perspective on Proposed Design closed Ken. Waiting for comments / lumion. 3/11/2019 Batangas Project feedback. Architectural working details of doors and Design Phase closed drawings. windows Architectural detail on 3/12/2019 Batangas Project Design Phase on-going Elevations and Sections autocad Architectural detail on Batangas Project Design Phase closed Sections done. autocad Need to reflect actual lay- out of stairs. Waiting for GT-7 1 Architectural Plan Plan Revision on-going confirmation on site from 3/13/2019 Engr. Krelton Need to reflect adjust stair location for Printed copy given to Sir Bestpak Project Plan Revision closed Architectural and Enan. Structural Plans Batangas Project Perspective Re-design on-going Option 2 3/14/2019 Stair Details Isometric White Swan (Unisun) Details on autocad closed File sent to Sir Ken. view