WEEKLY REPORT

DATE JOB/WORK CONTENT ISSUE ACTION STATUS REMARKS


detailed floor plan
on-going design Architectural working
3/8/2019 Batangas Project closed
phase drawings. schedule of doors and
windows
Proposed Design sent to Sir
Rendered perspective on
Proposed Design closed Ken. Waiting for comments /
lumion.
3/11/2019 Batangas Project feedback.
Architectural working details of doors and
Design Phase closed
drawings. windows
Architectural detail on
3/12/2019 Batangas Project Design Phase on-going Elevations and Sections
autocad
Architectural detail on
Batangas Project Design Phase closed Sections done.
autocad
Need to reflect actual lay-
out of stairs. Waiting for
GT-7 1 Architectural Plan Plan Revision on-going
confirmation on site from
3/13/2019
Engr. Krelton
Need to reflect adjust
stair location for Printed copy given to Sir
Bestpak Project Plan Revision closed
Architectural and Enan.
Structural Plans
Batangas Project Perspective Re-design on-going Option 2
3/14/2019 Stair Details Isometric
White Swan (Unisun) Details on autocad closed File sent to Sir Ken.
view

Prepared by: Checked by: Approved by:

Ivy Kathlyn C. Panganiban Ken Shen Ken Shen


Project Operation's V.P Project Operation's V.P