Ground Floor-CIC-Snag Report

Kewaunee RRL-EPC
Total Points Closed WIP Total Points Closed
Total Points 54
24 18 6 21 2
75% 25% 10%
port
RRL-EPC RRL-R&D
WIP Total Points Closed WIP
19 9 1 8
90% 11% 89%
GROUND FLOOR - CONSUMER INTERACTION CENTRE SNAG
Sl. No. Location Observation Category Accountability
Design4 Discussion on 10-01-2024 Remark

As per R&D team confirmation, Frosting film pattern


1 Lobby Entrance for Sliding door can be followed as executed in the 1st Look & Feel Kewaunee No dependency on Design4
& 2nd floor.

1) Wooden grain materials


shade by natural will looks the
same. No issue in material or
Wooden cladding joint to be proper and shade to be
2 Lobby Entrance Execution Observation Kewaunee quality.
changed for uniformity.
2) Joints will be rectified by
KLI.
1) Second & Ground floor
Entrance lobby logo remain
same and Ground floor
Logo: MOC and Logo Dimension needs to discuss with entrance wall cladding logo
3 Lobby Entrance Look & Feel RRL-EPC
Architect to move forward will be different.
2) Design input like MOC and
dimension to be specified by
RRL Design.

4 Consumer Interaction Area Room Name list to be shared for signage's material Inputs from R&D team RRL-R&D
processing.

Name list to be given by R&D team.

HVAC Diffuser to be changed with four way diffuser


5 Consumer Interaction Area Change Management RRL-EPC Change management to be submitted by KLI.
under change management.

6 Reception Area As per R&D team information, Coffee Machine and Look & Feel RRL-R&D
Water dispenser to be placed

New Requirement, Proposed As per discussion with


layout to be submitted by Dhinagaran, Water & coffee
Design4U. Layout to be machine is show in coner of
validated by R&D team receiption area "V" end.
7 Reception Area As per R&D team request, Magazine rack to be New Requirement RRL-R&D
provided in the reception area
It need to be provided by
EPC, R&D can't procure such
Magazine rack to be arranged
items for site. It was already
by R&D team.
discussed with Architect team
earlier.

Interior vendor needs to share


Planter box drawing to be shared with R&D team for
8 Reception Area Look & Feel RRL-EPC the shop drawing to architect
approval to confirm the dimension
for confirmation.

9 Reception Area Centre of the table planter is required Look & Feel RRL-R&D

Planter is not required,


Center part has wodden Box,
Installation of Puffs by
in which plant is shown. Who
Featherlite, KLI can arrange
will be arranging same.
the plants.
Nandha should take care the
Power & Network to be provided for Display Unit in
10 Reception Area Execution Observation Kewaunee power socket provision for
Seating area
display unit

2D drawing with reference


image to be shared by
Reception table below required 2 Nos. of storages and Design4U. R&D team to Let us know by when we will
11 Reception Area New Requirement RRL-EPC
4 Nos. of Switch socket & 2 Nos. Network. validate same. able to see options.
Change management to be
process to complete the work.

Wooden cladding side MDF cover to be painted


12 Reception Area Execution Observation Kewaunee KLI actionable
matching with wooden cladding

13 Meeting Room UPS readiness on meeting room to fix the TV Execution Observation RRL-R&D

UPS Power is ready.R&D team


to support for IT work
We will be able to add one
more mirror towards right side
of the current mirror with
below options,(right side of
entrance):
Can we consider complete
1) Two Mirrors with joint
As per R&D team input, Need to add additional mirror wall for mirror, in a single
14 Salon Room Change Management Kewaunee (Joints can be frame or silica)
on near to the existing mirror frame. Instead of half room. If
2) Two Mirros without joint
possible.
and maintaining specific
distance.
(Drawing for both options to
be shared by Design4 U- to be
validated byR&D team)
1) Aluminium corner guard to
be provided.
15 Salon Room Mirror Frame MOC to be confirmed with architect Look & Feel Kewaunee
2) Salon 2 type chair scope to
be confirmed.

With service pendent , Utility


Below false ceiling water line to be concealed with
16 Salon Room Look & Feel RRL-EPC services like Water & drain
using of services pendent
piping will be concealed.
Due to lux level issue R&D team requesting to fix 2x2
17 Salon Room Inputs from R&D team Kewaunee Will be done by KLI.
light fixture

No prior information to
Salon room door R&D team asking to change glass architect. This is new
18 Salon Room New Requirement Kewaunee Let's not do any changes.
door requirement. (For privacy it
was flush door consider)

Additional requirement asked


As per R&D team request, 1 No of metal tall unit with by R&D team. Tall units
19 Dry Booth-F&B New Requirement RRL-EPC
closed condition to be placed options is available at site - To
be validated by R&D team.
As per ergonomic design is
750mm table advisable. Hence
Table height is 750mm - Architect Table details and
20 Dry Booth- F&B Look & Feel Kewaunee sliding window position of 800 ok -800mm
Layout to be shared
mm is acceptable.

Architect Consultant confimed


current windows bottom are
at right elevation.Also 800 mm
Window opening to be shifted from 800 mm to 900 Window mock-up has been
21 Dry Booth-F&B New Requirement Kewaunee ok for 800mm
mm based on the specific request by R&D team physically shown to Mukesh Ji
along with Jahnavi during
walkthrough and the same has
been accepted by Mukesh Ji.
Dry & Fragrance Booth & As per R&D confirmation, Opaque film to be
22 Execution Observation Kewaunee Will be done by KLI.
Dry Booth considered for Dry booth also

As confirmed by OEM,
It is not a new requirement, it
Through switch it cannot be
was already discussed. Kindly
controlled. Separate Remote
confirm the light intensity of
will be proivided for lighting
each color light. Kindly
operation.Kewaunee to make
23 Dry & Fragrance Booth Provide 4 Nos. switch for each light control New Requirement Kewaunee request you to show us the
sure that remote operation of
operation, ho wit can be
one fixture should not disturb
change and it is not impacting
the opertions of other booth
other booths light while
light
change for one.
24 Dry & Fragrance Booth Lux level to be checked for fragrance booth Execution Observation Kewaunee Will be done by KLI.

25 Dry & Fragrance Booth Fragrance Booth industrial curtains to be check with Execution Observation RRL-R&D
Architect

Mail to be shared by Jahnavi Curtains are consider for dry


with preferred options. To be booths and not for fragrance
validated by R&D team booth.. Kindly correct
As per site measurement
Sink counter below services point to be concealed Kindly show one sample,
Dry & Fragrance Booth, cladding will be done with
26 with some kindly of ACP cladding, also need access for Look & Feel RRL-EPC before consider for all other
Home Care, Personal Care plywood and door under
future maintenance units.
change management.
It was already shared by
Provide 15 or 20 mm floor step down with floor trap
27 Home Care Execution Observation RRL-EPC Will be done by KLI. Architect and same was
for below the counter (Need to check with Architect)
discussed multiple times.
1)Platform to be provided
Front load washing machine top to keeping dryer above the front load washing
It was already discussed
28 Home Care machine. R&D asking granite slab (Need to check with Look & Feel RRL-EPC machine.
earlier.
Architect)
1) No prior information had
Top load washing machine. R&D asking wall cabinet been shared with Architect. It was already discussed
29 Home Care New Requirement Kewaunee
storage (Need to check with Architect) 2)Open mettallic Racks to be earlier.
provided to place dryers

Washing machine location PPR excess drain pipe to be


30 Home Care cut for floor level and provide SS floor drain trap for Execution Observation Kewaunee Will be done by KLI.
washing machine with drain provision
Additional requirement asked
by R&D team, will be This was not discussed,
R&D team asking to provide lab aprons storage 1 No.
31 Home Care
in Home care entrance
New Requirement RRL-EPC processed under change need more clarity on
management. Hanging type this point
required

Additional requirement asked


by R&D team, will be
Tall units (Metal completely
Sample Preparation & R&D team required additional Mobile cabinet with processed under change
32 New Requirement RRL-EPC closed) are checked, kindly
Instrumentation metal & Powder coating management. Tall units
proceed with same.
options available at site - To be
validated by R&D team
KLI Project team need to get
Personal Care, Sample Wall cabinet profile supports gaps to be covered. It
concurrence from Factory for
33 Preparation & will accumulate the dust in future. (Need to check New Requirement Kewaunee
the comments given by R&D
Instrumentation with Kewaunee Factory team)
team.

34 Personal Care There is colour difference in floor tiling Execution Observation Kewaunee Will be done by KLI.

Warm white light 4000K going to replace as per R&D


35 Personal Care Execution Observation Kewaunee Will be done by KLI.
requirement with 5700K natural white
Additional requirement asked
by R&D team, will be
36 Personal Care Towel stand is required (Need to discuss our Architect) New Requirement RRL-EPC
processed under change Wall mount towel stand
management.

Additional requirement asked


by R&D team, will be
37 Personal Care 2 Nos of Additional Stool to be placed in personal care New Requirement Kewaunee
processed under change
management.
Additional requirement asked
by R&D team, will be
2 Nos. Tall unit required with full closed condition processed under change
38 Personal Care New Requirement Kewaunee
from R&D team management.Tall units options
available at site - To be
validated by R&D team
Water line has been provided
39 Sampling of F&B Kitchen water line need to be provided Execution Observation RRL-EPC is it safe?
above the false ceiling

40 Sampling of F&B Dish washer connection need to be check with Look & Feel RRL-R&D
chandru

Connection has been provided.


As per Architect
recommendation we can
2 Nos. Tall unit & Balance space required open rack
provide all the closed tall units
with available space.Tall units Need to check the space
41 Sample Store with metal from R&D team (Need to discuss with New Requirement Kewaunee
Architect)
options available at site - To be
validated by R&D team

42 Sampling of F&B Kitchen on the dado tiling switch position to be re- Look & Feel RRL-R&D
checked with Electrical team

KLI to check and confirm


Not clear what exactly you
Details to be shared by are considering?,
Personal Care, Home Care Sink counter below the sink provided door 600x600
43 New Requirement RRL-EPC architect. To be validated by requirement is just to cover
& Dry Fragrance Booth for future maintenance
R&D team utility lines below snik, so it is
not visble.

44 Dry & Fragrance Booth Drain in the bottom of Wash basin in Fragrance booth Execution Observation Kewaunee Will be done by KLI.
Mirror to be fixed above wash basin in Personal care
45 Personal care Look & Feel RRL-EPC KLI will arrange
room

Nothing in place currently,


46 Sample of F&B Chimney in Kitchen Look & Feel RRL-EPC Will be done by KLI. kindly provide complet clarity
as per look & feel

47 Fragrance Booth Sink Position needs to be made at center of counter, Look & Feel RRL-R&D
also make sure asthtic is not impactes, if required
change the counter top. And repair will not be
accepted.

KLI to check and confirm

Floor Water drain need to be provided in HC sitting


48 Home Care Kewaunee
and washing area.
Notes:
1) Length of the Planter is 450 mm
2) R&D team to select and confirm the Plants to suit as per above dimension.