Ground Floor-CIC-Snag Report

Kewaunee RRL-EPC
Total Points Closed WIP Total Points Closed
Total Points 54
26 18 8 21 2
69% 31% 10%
port
RRL-EPC RRL-R&D
WIP Total Points Closed WIP
19 7 1 6
90% 14% 86%
GROUND FLOOR - CONSUMER INTERACTION CENTRE SNAG LIST
Design4 Discussion on 10-
Sl. No. Location Observation Category Accountability
01-2024

Room Name list to be shared for signage's material Name list to be given by R&D
4 Consumer Interaction Area Inputs from R&D team RRL-R&D
processing. team.

New Requirement, Proposed


As per R&D team information, Coffee Machine and layout to be submitted by
6 Reception Area Look & Feel RRL-R&D
Water dispenser to be placed Design4U. Layout to be
validated by R&D team

As per R&D team request, Magazine rack to be Magazine rack to be arranged


7 Reception Area New Requirement RRL-R&D
provided in the reception area by R&D team.

UPS Power is ready.R&D team


13 Meeting Room UPS readiness on meeting room to fix the TV Execution Observation RRL-R&D
to support for IT work
Mail to be shared by Jahnavi
Fragrance Booth industrial curtains to be check with
25 Dry & Fragrance Booth Execution Observation RRL-R&D with preferred options. To be
Architect
validated by R&D team

Dish washer connection need to be check with


40 Sampling of F&B Look & Feel Kewaunee Connection has been provided.
chandru
Kitchen on the dado tiling switch position to be re-
42 Sampling of F&B Look & Feel RRL-R&D KLI to check and confirm
checked with Electrical team

Sink Position needs to be made at center of counter,


also make sure asthtic is not impactes, if required
47 Fragrance Booth Look & Feel RRL-R&D KLI to check and confirm
change the counter top. And repair will not be
accepted.
Notes:
1) Length of the Planter is 450 mm
2) R&D team to select and confirm the Plants to suit as per above dimension.