You are on page 1of 1

Weekly Working Report

Assigned Section: Overall


Date: 14/12/2020 to 19/12/2020
Prepared by: Shayan Ahmed Raghib

Sr. # Task Description Details Section Status

Investigation of causes
WIP between sections and Currently identifying individual
of breakdown/time
stations was investigated. stations where there is time
1. wastages and Overall
Issuance from Raw Material wastage due to any of the
discussion of possible
store was monitored. previously highlighted reasons.
remedies.

Work Instructions of all Moved to Process Hall work


Compilation and
process on the production instructions, have been written
2. Display of Work Overall
floor are to be written and manually, will compile once the
Instructions
displayed. process hall is complete.

Currently a couple of trials (i)


Trails for avoiding Dipping top, bottom tanks in
rust/corrosion are being Assembly solder before assembly (ii)
3. T80-UD Oil Cooler
performed Washing tanks after assembly
with oil, are being performed to
solve the issue of rust on tanks.

Monitoring and recording


Introduction of OEE Report Completed and Shared
system of KPIs that highlight
4. based KPIs for Overall with respective personnel.
runtime, performance and
production Updated report was shared.
quality.

New quality reports for Press Shop Report being used.


5. Quality Reports rework, scrap and press Overall Press Shop Scrap report is being
shop. used.

You might also like