Maintenance Description is a set of series and operations that’s must be performed in order to put machine in a position of complete readiness to work
in stable conditions and thus increasing the conditions of a good environment .
Purpose:
Setting and implementing preventive and corrective measures for the set of machines, equipment, infrastructure and infrastructure of the factory, the
aim of which is to reduce the rate of faults, wastes and damaged parts in the factory.
Objectives:
1- Making an exclusive plan for the infrastructure, machines and production lines in the factory, and making continuous follow-up to them to find out
their status first in first .
2- Creating a preventive maintenance plan for the production lines of the factory as well as the contents of the factory from the foundations and
infrastructure of the plant b in agreement with the production management and the higher management .
3- Working to provide spare parts for production lines and machines to be placed on demand always in the event of any malfunction to reduce lost time
. 4- Working to reduce
the downtime, always with a quick response and providing spare parts .
5- Working to achieve the equation that includes prolonging the submersion of the machine with the highest production efficiency while reducing the
process of faults .
6- Working to develop and raise the efficiency of machines and production lines .
Change History
Issue Change summary By
1 first edition EN.Reda Abd Elmoniem
Document Used
Department Authority
1 Commercial Yes
2 IT Yes
3 Aftersales Service Yes
4 OEM Yes
5 HR Yes
6 IR Yes
7 OR Yes
8 Logistics Yes
9 Maintenance Yes
10 Purchasing Yes
11 Production Yes
12 QA Yes
13 QC Yes
14 WH Yes
15 Safety Yes
16 Planning Yes
17 Finance Yes
Department Maintenance
OUTPUTS
INPUTS
non- stop production work
Annual maintenance plan INPUT Maintenance OUTPUTS
S
Process
SUPPORT PROCESS
predictive and preventive
maintenance
QC Standards Warehouse
Safety Purchasing
Training Supply Chain
CEO plan
production manager
Prepared by Mohammed Abd Elkhalik Reviewed by EN. Reda Abd Elmonim Approved by EN. ESSAM LOTFY
Designation Designation Designation
Date 15/4/2021 Date 15/4/2021 Date 15/4/2021
FO-QA-01 Issue# (1 ) Rev # ( 0) dated 01/11/2020
Maintenance Procedure
Express luck Egypt
Company Procedure #: 1
Issue #1 15-4-2021
PR-MNT-01 Rev. #0
Ref.: ISO 9001:2015(8.4)(7.1.3)(8.5.1)
start
The plan happened and was in line with the plan's dates and the
growth rate rates
maintenance manager
performing
main
1
CM
3 Recording the time and date the steps and follow
PM FO-MA-02
FO-MA 03
REPAIR form LIST OF EQUPMENT
REQUSET
Production Manager
CHECK EFFECINCY
FO-MA-02 ACOORDING 1- HISTORY
2-WORK DONE calculations the time of work for a production line and loss time
Assign
4 Technician to
check
prepare annual
annual preventive
plan main
FO-MA-05
5 need
tools Make compeer between the time loss before and after
yes maintenance
make preventive
mainanace
Maintenance Supervisor
no PREPAIR
6 TOOLS need
outsource
no yes
PREFORM
MAINT
7 notify
O.S
teach
End
Formal working
1-A sample preventative maintenance plan
2-Equipment inventory form
3-Form a life brochure for each machine
4-Fault reporting form
5-Form the average performance of machine
NO Maintenance date what has been done What has been changed Notes
packing m
elevator1.2
elevator 3.4
comprsor
elevat pl1
elevat pl2
clark
Administrative
building
Warehouse
Building
production
building