You are on page 1of 22
-WARNING; If there are conflicts between a stated word and the number/amount/figure described, the stated/spelled word shall prevail. Should there slated quantities. the hiaher flaure shall prevall, IMPORTANT NOTE: For this first reformat of the examination in this subject, the Examinee shall be allowed to make full use (open books) ONLY of Rule Vil and Rule VII of the 2004 Revised Amplementing Rules and Reautations (IRR) of ential Decree (P.0.) No. 1096, ‘otherwise known as the 1977 National Building Code of the Philippines (NBCP} i.e. ONLY AS downloaded and reproduced from the PRBoA website at www.architectureboard.oh. Other IRR Proposed Open Market Residential Prototype Project consisting of Two (2.0) Storey, Single-Detached House with an 77.0 Sq.M. Total Gross Floor Area (TGFA) cum Site Development Planning Project for a Cluster of Ten (10.0) Prototype House and Lots, on a Site with a Ten Percent (10.0%) Slope with a low density residential (R-1) zoning classification, and located in the better parts of the Munict of Taytay in Rizal Province (Luzon Istand), shall be developed to host an open market residential development. ‘The 10 Prototype Houses shall be exclusive/ semi-upscale structures, 6 of which shall be on lots each with a 132.0Sq.M. Total Lot Area (TLA) and a 12.0m depth. The stated 77.0 Sq.M. TGFA of the Prototype Houses only refers to the enclosed floor areas above grade (or natural ground) level and excludes all other floor areas, if these are still to be introduced at a later time. (C._ PROJECT SITE FEATURES: ‘The 1,934.72 Sq.M. Grand Total Lot Area (GTLA) making up the entire Project Site is rectangular in shape and has thirty two (32.0) m wide frontage facing east. The property may be reached via a fifteen meter (15.0 m) wide street Le. the main road right-of-way (RROW) which has 1.8m wide paver-lined sidewalks on each side, The Surface of the main RROW sidewalk closest to the Project Site shall be considered as elevation 0.0 m. An 8.0 m wide cluster street bisects the Project Site at its long axis and intersects the main RROW at the right angle, The Project Site uniformly slopes at ten percent (10.0%) from west to east, which Is also the direction of the cluster street serving as the direct access to the 10 lots, 5 on each side of the cluster street. The 2 end lots at the westernmost portion of the Project Site approx. 31.45% wider than the 6 lots at the center of the development. The corner lots defined by the cluster street and main RROW ‘are 2.0 m wider than the 6 lots at the center of the development, (D. DESIGN OBJECTIVES: a. To create exclusive/ semi-upscale, low-rise, single-detached resklential building to be sited on a R-1 zoned property; b. To plan and design the Project host area, cc. To plan the development to maximize profts for the developer; and §. To design the Prototype Houses to serve as landmarks in the Project area, closely-knt residential duster that may serve as a model development in problem No, 1 (Low Density Restlenta! Cccepaney) ——— Page 2 WARNING: If there are conflicts between a stated word and the number/amount/figure described, the stated/spelled word shall prevail, Should there, Stated quantities, the higher laure shall prevail, IMPORTANT NOTE: For this first reformat of the examination in this subject, the Examinee shall ‘be allowed to make full use (open books) ONLY of Rule VII and Rule VIII of the 2004 Revised otherwise known as the 1977 National Building Code of the Philippines (NBCP} le. ONLY AS downloaded and reproduced from the PRBOA website at www,architectureboard.oh. Other IRR A Proposed Medium-Rise APARTMENT BUILDING Project |.e. a development with ‘Basement component and on a Project Site having an 8,0% slope, B. STATEMENT OF THE PROBLEM: ‘A Development company has decided that its newly-acquired property with a Total Lot Area (the “TLA.) of six thousand square meter (6,000.0 Sq.M.) shall be developed to host a medium-rise apartment building (the "Project’). The property is zoned as a high density housing lot (Maximum R- 3), located somewhere in the better parts of Pasig Cty (the "Project Site”). Only two (2.0) types of rentabie/leasable apartment units shall be provided, as follows: 1) Studio-Type apartment units with a twenty two square meter (22.0 Sq.M.) Gross Floor Area (GFA); and 2) One (1.0)-Bedroom (BR) apartment units with a GFA of fifty (50.0) Sq.M. For greater market acceptance, the minimum parking requirements for the Project under the 2004 Revised Implementing Rules and Regulations (R-IRR) of P.D. No. 1096, otherwise known as the 1977 National Building Code of the Philippines (NBCP), should be exceeded. C. PROJECT SITE FEATURES: ‘The Project Site Is rectangular in shape and is an Interior lot with a fifty (50.0) m. width. As there is ‘no other means of direct access to the Project Site, a two (2) lane right-of-way (ROW) stil has to be with the owner of the adjoining vacant lot that faces north, where a twenty meter (20.0 m) wide street i.e. a road right-of way (RROW) is located. The sold RROW has two point four (2.4) m wide sidewalks on each side. ‘The Project Site uniformly slopes at eight percent (8.0%) towards the vacant lot in front, which is ‘only 80.0 m deep but also uniformly 8.0% slopes toward the RROW. The surface of the sidewalk adjoining ‘the vacant front lot shall be considered as elevation 0.0m. “To the left ofthe Project Ste isa private high school building. To Its right is a residential condominium building. To the rear of the Project Site are proposed three (3.0)-storey single-detached residences. DESIGN OBJECTIVES: a. To design a medium-rise apartment building, marketable and attractive to middle income renters/lessees; 'b. To design the apartment building in a way that can maximize rentals and leases for the Developer; the ratio of saleable versus non-saleable spaces shall be 70:30; If attainable, the ‘overall rentable/leasable areas forthe building could be at approximately eighty five percent {(80.0)% of the TGFA or better, which must include the parking spaces at the basement; and Cc. To design 2 bung that shal serve asa landmark inthe Project area, wth plan/design features and deliverable at the least cost. ‘ce ee nee Page 3 1, If there are conflicts between a stated word and the number/amount/figure described, the stated/spelled word shall prevail Should there carer ea pak aes ls oy cc mansion b eka Gators be Sacco ened te meats a ee pes Boa Medium-Rise OFFICE CONDOMINUM Project [development with Basement, Podium (with covered parking) and Tower components} B,_STATEMENT OF THE PROBLEM: ‘A Developer has decided that its commercial 3 (C3) property (the “Project Site”), with a Total Lot ‘Area (TLA) of two thousand square meter (2,000.0 Sq.M.) and located in Quezon City (Metropolitan ‘Manila Area), shall host a medium-rise Office Condominium building (the “Project”). ‘Only four (4.0) types of real estate products shall be provided by the Developer and these are all office units with Gross Floor Area (GFA) measurements of: 1) Thirty square meters (30.0 sq. m.) 2) Sixty (60.0) sq. m. 3) Ninety (90.0) 59, m.j and 4) One hundred twenty (120.0)sq. m. ‘G._PROJECT SITE FEATURES: “The Project Site is a rectangular inside (or regular) lo. Itis located along a fifteen (15.0)m wide street Le. the road right-of-way (RROW), with 2 forty meter (40.0 m) wide frontage facing the south. The site slopes very gently towards the street with one point eight (1.8) m wide sidewalks. The surface of the sidewalk shall be considered as elevation 0.0 m. D, DESIGN OBJECTIVES: 2. To design an office condominium, a high intensity commercial bulding (the “Building” marketable and attractive to small to medium size office locat . . To design the Building in a way that can maximize profit for the Developer ; the ratio of saleable versus non-saleable spaces; and ‘c. To design the Building to serve as a landmark in the Project host area ———— Paget WARNING: If there are conflicts between a stated word and the number/amount/figure described, the stated/spelled word shall prevail, Should there, Stated quantities, the higher flaure shall prevail. IMPORTANT NOTE: For this first reformat of the examination in this subject, the Examinee shail ‘be allowed to make full use (open books) caer cncsen-en tne 1977 hothonl nuby Comte of te Padippéeas (NBCEI 16 ONLY AS dorenioadd nd worodoced Goon the PRCA wabete at mrwsarctacturnbanstls Other IRR A. PROJECT NO. 4 TITLE and General Description: A Proposed Low-Rise NATIONAL GOVERNMENT OFFICE Project [development with e: ai er components] B, STATEMENT OF THE PROBLEM: ‘A National Government-Owned and Controlled Corporation (GOCC) has decided that its eight thousand square meter (8,000.0 sq. m.) property located somewhere in Quezon City shall host a low-rise office building (the “Project”) to serve as their headquarters. ._PROJECT SITE FEATURES: “The Project Site is a rectangular through lot with an esplanade at its north property line. It has an eighty meter (8.0 m) wide frontage with a full southern exposure. The primary access to the front of the property as a high traffic thirty (30.0) m wide street i.e. the road right-of-way (RROW). The site slopes very ‘gently towards the esplanade composed of a one point two (1.2) m wide sidewalk, a six (6.0) m wide carriage way and a three (3.0) m wide promenade and plant strip. The high flood waterline (100years return) is at least one (1.0) m lower than the esplanade sidewalk, which shall be considered as elevation 0.0m for the proposed building. ‘The 30.0 m wide street has 2.4m wide sidewalks on both sides, but was recently declared an arcaded street by city ordinance. The proposed building is also covered by a separate Green Building Ordinance. To the east of the property are 2 other large National Government office complexes. Across the property is a long row of arcaded private low-rise commercial buildings. D,_DESIGN OBJECTIVES: a. To design a National Government Office Building, a high intensity institutional building (the “Building”); “To design the Bullding in a way that can maximize the delivery of services required by the ‘general public; and “To design the Building to serve as a landmark in the Project area, with sustainable design provisions and delivered at the least cost. b. protien Ne. 4 Page S WARNING: Jf there are conflicts between a stated word and the number/amount/figure described, the stated/spelied word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher laure shall prevail, IMPORTANT NOTE: For this first reformat of the examination in this subject, the Examinee shall be allowed to make fll use (open books) ONLY of Rule Land Rule VilLot- te 2008 Revised otherwise known as the 1977 National Bulking Code ofthe Philippines (BCP) Le. ONLY AS downloaded and reproduced rom the PRBoA website st wou. acchitecturehoacd ths Other IRR A Proposed Medium-Rise GARMENT AND UNDERGARMENT FACTORY Project [development with Basement and Tower components only] B,_STATEMENT OF THE PROBLEM: ‘A Garment Firm based outside Metro Manila has decided that its newly acquired property with an Industrial 3 (1-3) zoning classification, located in Parafiaque City (near airport), shall host a medium-rise Garment and Underaarment Factory Building (the "Project”) ‘The Garment Firm specializes in hard/ tie-dyed shirts; dresses; men’s and ladies’ undergarments, all for the export market. Based on their consultant's research, the entire operations of the Garment Firm i.e. ‘which start from receipt/ storage of raw materials to finishing, packaging and containerizing, should be * moved to the new facility to save on time and freight/ handling costs. ‘The Garment Firm has about two hundred twenty (200.0) rank and file employees (Including factory workers who must be housed at the new facility. {PROJECT SITE FEATURES: “The Project Site has a ten thousand square meter (10,000.0 Sq.M.) Total Lot Area (TLA), is. rectangular in shape, and Is a comer lot abutting three (3) streets and 6.0 meter (m) wide creek. Tis primary access is through @ thirty (30.0) m wide street with two point four (2.4) m wide sidewalks on either side (collectively the "primary road right-of-way (RROW)]. The sald primary RROW is intersected at right angles by 2 minor streets each with a six (6.0) m wide RROW. The 2 intersects (corners) have sx (6.0) ‘m wide chaflans |e. with legs of 4.25 m. ‘The Project Site has an eighty (80.0) m wide frontage that faces the west and serves as the main ‘access for the container vans/trucks on a 24-hour basis. The Project Site slopes at four percent (4.0%) towards the creek. The surface of the sidewalk at the primary RROW shall be considered as elevation 0.0. “To the left of the Project Site is a private office building. To its right is a ceramics factory building and directly across the street are two (2.0) videoke bars and a restaurant-bar with live band performances. ‘Across the creek are two point five (2.5) storey row-houses. D,_DESIGN OBJECTIVES: a. To design a Garment and undergarment factory building that can maximize profits for the Garment Fm trough 9 good process fow/verca spatial itreatonship and space penning efficiency; ‘To design 2 Building that shall be sustainably planned CS prec olen fer anette eden tert nbc gah ceataly) waistral Cccupsney Space Prove) Page 6 Situation 1 - Project No. 01 1 Project No. 1. Under the 2004 Revised IRR of P.D. no. 1096 or NBCP, what should be the applicable Building Height Limit (BHL) for each of the 10 lots (in number of storeys)? AS 3 B12 D. 18 Project No. 1. Under the NBCP, what shall be the BHL. for each of the 10 fots (in meters)? A. 10 cs B. 36 D. 15 Project No. 1. What is the width (In meters) of the 6 lots at the center of the development? AB B15 Project No. 1. Under the NBCP, what is covered by the BHL. for the Project? A. antenna B. deck roof level parapet wall, if introduced C. electrical or electronic devices mounted on top of the parapet wall, if introduced D. mast Project No. 1. Under the NBCP, what is the generally permitted range for number of storeys for a low-rise building project? A 1t05 C113 B. 3106 D. 6to9 Situation 2 — Project No. 01 6. Project No. 1. Given the Project Site orientation, from what direction shall the “amihan” wind come from? A, East . Southeast (SE) B, SouthWest (SW) NorthEast (NE) 7. Project No. 1. Where on the 10 lots are the best sites to plant large trees that will serve as “habagat” wind buffers?» ‘A. North, NorthEast (NE) and East perimeters. B, West, NorthWest (NW) and North perimeters. , East, SouthEast (SE) and South perimeters. D. West, SouthWest (SW) and South perimeters. Project No. 1. Given the street position, what are the main orientations of the road right-o-way (RROW) view corridor? ‘A. NorthEast (NE) and NorthWest (NW) B. SouthEast (SE) and SouthWest (SW) CC. North and South D. East and West. Project No. 1. Given the Project Site orientation and the cluster street orientation, where are the BEST sites on each of the 10 lots to plant large shade trees? ‘A. Right and Left side yards. B. NorthEast (NE) comers. CC. Front and Rear yards. D. SouthEast (SE) comers. ene Page ? els “ints Project No. 1. Given the Project Site orientation, what are the dominant sun-paths for the property? A. SW to SE and NW to NE . SE to SW and NE to NW B. SE to NW and NE to SW D. SW to NE and NW to SE Situation 3 ~ Project No. 01 11, Project No. 1. Assuming one (1) of the 2 end lots shall host common provisions, which of the following is NOT considered an amenity provision for the Project? ‘A. Gameroom B, Homeowners’ association office C. Swimming poo! . Clubhouse 12, Project No. 1, Which of the following is NOT considered a facility provision for the Project? A. Gym C. Guest parking 8B. Gameroom D. Homeowners’ association office 13, Project No. 1. Which of the following is NOT considered 3 service provision for the Project? ‘A. Gardener's room C. Workshop B. Security quarters D. Overhead Water tank 14, Project No. 1. Which of the following is NOT considered a utlity provision for the Project? A. Generator room C. Sewage treatment plant (STP), if introduced B. Domestic water cistern D._ Guest parking 15. Project No. 1. Which of the following provisions should NOT be situated close to one another? ‘A. Security quarters, locker and shower B. Guest parking slots, cluster street, disabled ramps, etc. ‘C. Homeowners’ association office and generator room D. Cistern and sewage treatment plant, if introduced Situation 4— Project No. 01 16. Project No. 1. Given the Project Site location, budget and target market, which mix of architectural archetypes BEST suit/s the Project? ‘A. Residential and recreational B, Residential and business (home office) CC. Residential and entertainment D. Residential and commercial (retail) 17, Project No. 1. Which architectural Image can BEST suit the Project? ‘A. Fun, Frivolous and carefree. B. Attractive but aloof and business like. C. Inviting relaxed and laid back. D. Warm, safe and comfortable. 18, Project No. 1. Which architectural style may BEST sult the Project to help cut cost? ‘A. Stylized Neo-Classical or Classical C. Modem with clean but textured lines, B. Tropical American Country D. Mediterranean 19. Project No. 1. Given the bulk of the Prototype House, what architectural lines need to emphasized? A. Vertical , Horizontal B. Diagonal D. Cunvilinear eee Page ® Project No. 1. Assuming a 42.0 Sq.M. TGFA for a Prototype House ground floor, about how many pieces of 0.30 m by 0.30 m ceramic tiles shall be needed for its flooring, assuming that the bathroom measures 1.35 m by 1.7 m? A. 480 C441 B. 502 D. 408 Situation 5 ~ Project No. 01 21, Project No. 1. What should be the nominal thickness of the concrete hollow block unit (in meters) for the interior walls of the Prototype House? A. 0.20 C. 0.10 B. 0.15 D. 0.25, Project No: 1. What should be the nominal thickness of the concrete hollow block unit (in meters) for the perimeter property wall of the Prototype House? A. 018 © 0.20 8. 015 D. 0.10 23. Project No. 1. Assuming a very heavily forested hilsde location for the Project Site and the budget constraint, what type of roof structure should be introduced for the Prototype Houses? ‘A. Steep, gable-shaped metal roof on welded steel frame. B. Very steep, asphalt shingle roofing on marine plywood on assembled metal frame. CC Low-pitch, steel deck roof. D. Composite deck roof with 3% slope 24, Project No. 1. Assuming a Project Site location that is 150.0 meters (m) away from a very high- voltage transmission line, what type of building projections should NOT be introduced for the Prototype? ‘A. Extended eaves . Balconies B. Sun-breakers . Canopy 25, Project No. 1, Assuming that a frewall-quality wall thickness is required by an Owner, what should ‘be the nominal thickness of the concrete hollow block unit (in meters) for the exterior walls of the Prototype House? A. 0.10 ©. 0.25 8. 0.20 D. 0.15 Situation 6 ~ Project No. 01 26. Project No. 1. Which of the folowing is NOT a good keyhole center height (in meters) knob- type lockset ofthe Prototype House main door? Cee AL 1.155 ¢. 0.975 B. 1.055 D. 0.963, 27. Project No. 1. Which of the following is NOT considered a good fixed counter (in meters) for a is depth ( ) fo A. 0.30 © oss 8045 D. 0.40 28, Project No. 1. What is NOT considered an equipment item? AA. Exhaust or transfer fon . Dome-type CCTV camera 8. Wall or celing fan . Soup dispenser ene Page? 29. Project No. 1. What is NOT considered a furniture item? A. Sofa C. Wall-mounted flat TV = Coffee table D. Dresser 30. Project No. 1. What is NOT considered a furnishing item? ‘A. Ceiling fan with tights B. 80% Life-size wall mirror C. Freestanding indoor sculpture D. Acrylic painting Situation 7 - Project No. 02 31. Project No. 2. Under 2004 Revised IRR of P.D. 1096 or NBCP, what shall be the applicable range of the Floor to Lot Area (FLAR) for the Project? A. 16to1.8 ©. 18 to 21 B. 7.1t081 D. 6.0 to 9.0 32, Project No. 2. Using the prescribed FLAR designation/ rights under the NBCP, what shall be the ‘maximum Gross Floor Area (GFA, in square meters) that can be generated for the Project? A. 64, 800 . 68, 400 B. 48, 600 D. 46, 800 33, Project No. 2. Under the NBCP and based on the maximum GFA (in square meters), what shall be the maximum Total Gross Floor Area (TGFA) for the Project? A. 77,760 ©. 56, 160 B. 82, 080 D. 58, 320 34. Project No. 2. Under the NBCP, which is part of the GFA for the Project? A. Covered parking C. ACCU balcony B. Roof deck, if introduced D. Lobby 35, Project No. 2. Under the NBCP, which is NOT part of the GFA for the Project? ‘A. Basement parking area, if introduced C. Corridor B. Balcony . Elevator lobby Situation 8 - Project No. 02 36. Project No. 2. Given the Project Site orientation , from what direction shall the “Amihan” wind come from? A. East . SouthEast (SE) B. NorthEast (NE) D. SouthWest (SW) 37. Project No. 2. Where on the property isthe best site to plant large trees that will serve as “Habagat” wind buffers for the Projects lower floors? ‘A. West, SouthWest (SW) and South perimeters B. East, SouthEast (SE) and South perimeters CC. Notth, NorthEast (NE) and East perimeters D. West, NorthWest (NW) and North perimeters age 1 38. 39, 40. Project No. 2, Given the street position, what are the main orientations of the road right-of-way (RROW) view corridor? ‘A, North and South B, SouthEast (SE) and SouthWest (SW) CC. NorthEast (NE) and NorthWest (NW) D, East and West Project No, 2. Given the Project Site orientation, where on the property Is the best site to plant large shade trees for the lower floors? A. Right and left side yards B. front and rear yards, C. SouthEast (SE) comer of the property D. NorthEast (NE) comer of the property Project No, 2. Given the Project Site orientation, what are the dominant sun-paths for the property? ‘A. SW to NE and NW to SE . SE to NW and NE to SW B. SE to SW and NE to NW D. SW to SE and NW to NE Situation 9 ~ Project No. 02 at. 42. 43. Project No. 2. Under the NBCP, which of the following does NOT form part of the footprint of the Project? ‘A. Exterior walls of the building at ground floor B. Podium ground floor C. Tower ground floor D. Basement level Project No. 2. Under the NBCP, which ofthe following still do NOT form part of the footprint of the Project? 'A. Elevator lobby and service stairs at ground floor B, Garden mall at ground floor CC. Main lobby and reception area at groind floor D. Utility rooms at ground floor Project No. 2. Which of the following should NOT be provided for the Project? ‘A. Executive lounge B. Elevator lobby and service stairs C. Clubhouse or social area 1. Utlity rooms project Mo. 2. Which of the following should preferably NOT be provided near the Project lobby? ‘A, Garbage chute C. Service stairs B, Utility room D, Fire escape project No, 2. Which of the following should NOT be provided at the basement component of the Project? 'A. Elevator lobby and service stairs B. Solld waste storage C. Enclosures for electronic equipment ©. Covered parking slots, driveways, ramps, etc, eee Page 11 eae AL Situation 10 ~ Project No. 02 46. Project No. 2. In term of architectural exterior finishing, which of the following material set can best convey that the Project is a place for multi-storey budget residences? AA. Substantial use of masonty and some glass B. Much glass, some metal and limited masonry . Some glass, plastics and engineered stone D. Much glass, much metal and some hard wood 47, Project No. 2. In term of architectural exterior fishing and energy conservation, which of the following material set is NOT a good material and finish combination forthe southern face of the Project? ‘A. Transparent glass and dark color-painted masonry 8. Heavily tinted glass and medium color-painted masonry Translucent glass and light color-painted masonry . Transparent glass and light colored metal panels 48. Project No. 2. In term of architectural exterior finishing and bullding insulation, which of the following is NOT a good color for the Project deckroof, if introduced? ‘A. Light gray C. Medium blue B. Medium gray D. Dark gray and black Project No. 2. In term of architectural exterior finishing and building insulation, which of the following is NOT a good material and color combination for the Project roofing? ‘A. Light red polycarbonate panels B. Light brown metal roofing . Dark greefi metal roofing D. Medium biue metal roofing 50. Project No. 2. In term of operating and maintenance costs, which of the following materials should ‘carry a minimum 5-year warranty on materials and Installation? ‘A, Deck roof waterproofing 'B. Glass of operable windows C. Surface of laminated flooring . Indoor toilet waterproofing Situation 11 — Project No. 02 project No. . To fit 3 vehides per structural bay (meter times meters, center to center), which of the folloning should NOT be a recommended bay measurement for the Project? A. 7.25%8.0 © 8.75x95 B 9.05x98 D. 8.55 x90 proect No. 2. To f3 vehicles side by side within he ain driveway located between 2 columns, 51. 52. ‘uch dear measurement (In meters) should NOT be used asthe distance between column faces? A 66 © 78 B82 D. 86 53, Project No, 2. To attain overall design economy and minimized structural stblty, where should fect No, 2. To ot oe or tpn floors be akgned or postion, in relation so the bualng’s perimeter column? A near the column interior face D. positioned outside the cok : Stoned with the column centeines ate tere: Fock Gostioned near the column exterior face _——$—_ Page 12 POS IAD) ese) (ox es A Sac sa, Project No. 2. To attain overall design economy, particularly on operation and maintenance: consideration, where should the downspouts be positioned with respect to the building mass? A. at the building center i B. along the property walls CC. at the rear side ofthe building D. at the building perimeter 55, Project No. 2. Under Appendix A of the IRR of 8.P. No. 344, what .P. No. 344, what should be the minimum clear ‘dimensions (in meters by meters) of the elevator shaft? : A 15x18 C 21%24 Bo L2x15 D. 18x21 Situation 12 ~ Project No. 02 56. Project No. 2. Which ofthe following is considered an economical flooring material forthe main lobby of the Project? A. Italian Granite tile C. local marble slabs B. Italian Granite Slab D. Greeki marble slabs 37. Project No. 2. Which of the following is 2 resilient architectural flooring material for use on the Project's rentable units? A. Gay tile C. Ceramic tile B. Vinyl Strips D. Granite tile Project No. 2. Which of the following is considered a millwork item? A, cornice moulding C. carpet tile B. Vinyl baseplate D. lockset 59. Project No. 2. Which of the following is NOT a Hardware Item? A. door stop CC, lockset B. door closer D. door casing 60. project No, 2, Wich ofthe folowing NOT anymore coniered an approprtslahing leet for the lease units? ‘A. LED lighting cats B. halogen lamps D. Fluorescent lighting Situation 13 - Project No. 03 61. Project No. 3. Under the required number of parking 2004 Revised IRR of P.D. No. 1096 or NBCP, what shal be the minimum ‘lots for the 30.0 sqm GFA units ofthe Project? 1A. 1 parking slot : unit By parking slot : 4 units D. 1 parking slot: 62. Project No, 3. Under the NBCP, what salle the minimam required number of parking slots for the 60.0 sam GFA units of the Project? ‘A. 2 parking slots: 1 unit B. 1 parking slot : 3 units Project - under Appendix Af the IRR of B.P No. 344 (1983 Law to Enhance Mobily of Sais ene Soe be te minimum with (in meters) ofthe dsabled parking Sot? © 37 D. 29 A 25 ECTURAL DESIGN AND SITE PLANNIM 64, Project No. 3, Under Appendix A of the IRR of B.P. No. 344, what shall be the minimum clear width {in meters) of the elevator door? A. 0.80 c. 0.87 B. 0.89 D. 0.83 65, Project No. 3. Under Appendix A of the IRR of B.P, No. 344, what shall be the minimum clear width (in meters) of the disabled water closet stall? A 1.80 c 1.70 B 1.50 D. 0.90 Situation 14 — Project No. 03 66. Project No. 3. Under the 2004 Revised IRR of P.D. No. 1096 or NBCP, what is the minimum unpaved ‘surface area (USA) for the Project Site (zone as C-3)? The answer is @ percentage (%) of the Total Lot Area (TLA). A 20 Gs B15 D. 10 67. Project No. 3. For the Project Site (zone as C-3 under the NBCP), how much is the minimum USA (in ‘square meters)? A. 300 . 100 8, 200 D. 400 68. Project No. 3. Under the NBCP, what is the maximum allowable impervious surface area (ISA) for the Project Site (zoned as C-3), Ifthe building shall NOT have a firewall? The answer is percentage (9%) of the Total Lot Area (TLA). 2 A 10 C15 BS : D. 20 69. Project No. 3, For the Project Site (zone as C-3 under the NBCP), how much is the maximum allowable ISA (in square meters)? A. 200 c. 100 B. 400 D. 300 70. Project No, 3. For the Project Site (zone as C-3 under the NBCP), how much is the combined total for the maximum allowable ISA plus the minimum USA (in square meters)? A. 135 C400 8. 535 D. 270 Situation 14 ~ Project No. 03 71. Project No. 3. Under the NBCP, which of the following does NOT form part ofthe Footprint of the Project? ‘A. Exterior walls of the building at ground floor B. Basement Level C. Tower ground floor 1, Podium ground floor 72. Project No. 3. Under the NBCP, which of the following still do NOT form part of the footprint of the Project? ‘A. Main lobby and reception area at ground floor Elevator lobby and service stairs at ground floor . Patio at ground floor . Utility rooms at ground floor EEE Page 14 73. Project No. 3. - heer 3. Which of the following should NOT be provided at the tower component of the A. Elevator lobby and service stairs B. Clubhouse or social area C. Workshop and carpentry room D. Utility rooms: 74. Project No. 3. Which of the following should N Proc No, 5, Wich of 1g should NOT be provided at the ground level of the podium ‘A. Main lobby and reception area B, Driver lounge CC. Utility rooms 1D. Elevator lobby and service stairs 75. Project No. 3. Which of the following should NOT be provided at the basement component of the ‘A. Elevator lobby and services stairs B, Covered parking slots, driveways, ramps, etc. C. _ Enclosures for electronic equipment D. Solid waste storage Situation 16 - Project No. 03 76. Project No. 3. Which is NOT considered a Green Architecture concern? ‘A. Lowering the building carbon footprint C. Construction timetable B, Building energy consumption D. Rainwater harvesting 77. Project No. 3. In terms of material production, which of the following flooring materials is considered to have the lowest carbon footprint? ‘A. High-pressure laminate flooring _C. Hand-cut natural stone B, Baked clay tiles D. ceramic tiles 78, Project No. 3. In terms of production, transportation and installation, which of the following ceiling materials Is considered to have the highest embodied energy? ‘A, Plywood C. Polycarbonate sheet B, Recycled cardboard egg crate. Gypsum board size, intended image and occupancy type, what would be the Project No. 3. Considering the bullding 2 | for the building? best generic main door type and materia ‘A. Revolving/hardwood . Accordion/ PVC B. Double sliding/steel D. Quadruple leaf swing/glass ‘80. Project No. 3. If the office ‘condominium units on the 5 floor area are NOT fo be air-conditioned, Po Shall be the minimum distance (in meters) etween the FFL, as provided for under the NBCP? C240 A, 2.10 D. 3.00 B. 2.70 AL DESIGN AND SITE PLANNING "Situation 17 - Project No. 03 81. Project No. 3. To fit 3 vehicles per structural ba times meters, meters Fa ePaper ery a A. 8.75x9.50 C. 855x9.0 B. 7.25x8.0 D. 9.05 x 9.8 82. Project No. 3. To fit 2 vehicles side by side within a driveway located between the 2 columns, which lear measurement (in meters) should NOT be used as the distance between column faces? A522 C46 8.58 D. 64 £3. Project No. 3. To attain the overall design economy and maximized structural stabty, where should the perimeter beam centerline for typical floors be aligned or positioned, in relation to the bullding's perimeter column? ‘A. Positioned outside the column interior face B. Positioned near the column exterior face . Positioned near the column interior face D. Aligned with the column centerlines 84, Project No. 3. To attain overall design economy, particularly on operations coor ations, where should the downspouts be positoned with respect to the bulding's perimeter cladding) 0 se ced exterior faces of columns (end postloned farthest outside the architectural adding) . Enclosed by CHB or masonry at the interfor faces of columns D. Inside the columns A of the IRR of B.P. No. 344, what should be the minimum clear 85. Project No. 3. Under Appendo: Pfonensions (In meters by meters) ofthe elevator shaft? A. 15x18 c. 13x16 B. 17x20 D. 19x22 Situation 18 - Project No. 3 : jet No. 3. Which ofthe folowing NOT condere ond Keine certer hag Ee) - the main door lockset of a typical office unit? Ee Cc 0.98 & 056 6 a0 87 project no 3. Wh of te flowy OT aad fd cmt eth Cm mers 2 WP "office unit? Cc. 0.50 S080 . OAs 60 project smallest saleable office unit (without a tole and without a balcony), what is ee Nes) te unt wi (at wal arte) & 40 mee ()? c75 D. 75 8. 8. Page 16 p> & £ Molec besa he ah =k 89. Project No. 3. For the smallest saleable office unit (without a toilet and without a balcony), with a unit with (at wall centers) of 4.0 meters (m), how many pieces of whole 0:30 m by 2.5 mm thick Vinyl tiles shall be needed for its flooring? A. 358 C312 8. 334 D. 346 90. Project No. 3. For another variant of the smallest saleable office unit, with approximate clear dimesions of 3.5 meters (im) by 8.5 m, what would be the minimum number of pleces of the required vinyl, tile flooring (0.30m by 0.30m x 2.5 mm thick)? A 327 c 335 B. 331 Dd. 323 Situation 19 ~ Project No. 04 91. Project No. 4, Under the 2004 Revised IRR of P.D. No. 1096 or NBCP, what shall be the applicable Floor to Lot Area Ratio (FLAR) for the Project? ALS © 25 B. 35 D. 3.0 92. Project 4. Using the prescribed FLAR designation/rights under the NBCP, what shall be the maximum Gross Floor Area (GFA) that can be generated for the Project? ‘A. 26,000 sqm. C. 20,000 sqm. B, 24,000 sqm. D. 22,000 sqm. 93. Project 4. Based on the Maximum GFA under the NBCP, what is the stated conversion factor to arrive at the Total Gross Floor Area (TGFA) for the Project which is an institutional building? A. 33% * Cc. 25% B. NotstatedD. 20% D. 20% 94. _ Project 4. Under the NBCP, which is part of the GFA for the Project? ‘A. ACCU Balcony C. Lobby B, Covered parking D.. Roof Deck, if introduced 95. Project 4. Under the NBCP, which Is NOT part of the GFA for the Project? ‘A. Cooling tower area, if introduced . Balcony B. Elevator Lobby D. Corridor Situation 20 - Project No. 04 196. Project No. 4. Under the 2004 Revised IRR of P.D. no. 1096 or NBCP, what is the term interchar ‘used for an institutional zoning classification? ; ingeably A. Gross insttitutional C. Generic institutional B. General institutional D. Governmental institutional 97. Project 4. Under the NBCP, what is NOT a principal use permitted for a GI Zoning classification? A. Children’s hospital C. Dance School B. Orphanage D. Kindergarten School —_—— Page 17 N AND SITE PLANNING 98. Project 4. Under the NBCP, what is an accessory use permitted for a GI Zoning classification? ‘A. Townhouse C. Vocational training center B. Residential condominium —_D, home furnishing shop 99, Project 4. Under the NBCP, which is the building character of occupancy for @ GI Zoning classification? ‘A. Recreational C. Medium industrial B. Institutional D. Business and mercantile 100. Project No. 4. Under the NBCP, which is NOT considered a typical lot type? A. Interior lot C. Tum court lot B. Inside lot D. Comer-through fot Situation 21 - Project No. 04 101. Project No. 4. Which ofthe following is NOT considered an amenity provision fr the project? ‘A. Executive Lounge C. Mini-conference room B. Multi-purpose room . Interdenominational worship room 4102. Project No. 4. Which of the following is NOT considered a facility provision for the Project? A. Gym ©. Covered Parking B, Daycare center D. Multi-purpose room: 102, Project No. 4. Which is NOT considered a service provision for the Project? ‘A. Electrical room C. Fire escape stairs B, Main stairs D. Elevators 103, Project No. 4. Which of the following is NOT considered a utility provision for the Project? A. Oster C. Guard locker and shower B. Transformer room D. Sewage treatment plant (STP) 104. Project No. 4. Which of the following sets of spaces should NOT be situated close to each other? A. Elevators, service stairs and fire escapes B, Clinic and common toilets C. Covered parking slots and fire reserve tanks 1D. Guard quarters, locker and shower Situation 22 - Project No. 04 105. Project No. 4. Which os the following must be one of the very fist architectural activities for the 106. Project No. 4. Which of the following is the local (or LGU) law that governs the design of the Project? ee ‘A. Zoning ordinance. 'B. Association design standards and guidelines. C. P.D. No. 1096 and IRR. Page 18 D. Comprehensive land and water use plan (CLWUP). 107. Project no, 4. Which of the following does NOT precede the architectural design activity for the Project? A. Technical spectfications. CC. Architectural program B, Architectural plan D. Space plan. 108. Project No. 4, Under the present practice in the country, which of the following is NOT an architectural design consideration for the Project? ‘A. Compliances with prevailing laws such as R.A. No. 9184, P.D. No. 1096, RA. No. 9514 and B.P. no, 344 and their IRS. B. Drainage canal slope and direction. C. Maximum flood level, D. Solar, wind, noise, odor and view orientation. 109. Project No: 4. Which of the following is NOT regarded as an architectural design consideration for the Project? : ‘A. Spatial function and efficiency. C. Wall hangings B. Vertical and horizontal circulation patterns. _D. Aesthetics and landmark quality Situation 23 - Project No. 04 110. Project No. 4. Which approx. column dimensions (in meters by meters) may be initially used for the ground floor of the Project if erected on firm soil, and if the structural bay is between 8.5 to 10.0 meters (m)? AOLTxKL7 ©. 07x07 B. 13x13 D. 19x19 111, Project No. 4, Which approx. column dimensions (in meters by meters) may be initially used for the fourth (4) floor of Project if erected on firm soil, if the structural bay is between 8.5 to 10.0 meters (m)? AL 12x12 © 15x15 B. 08x08 D. 05x05 112. Project No. 4. Assuming a heaviky forested location for the Project Site, what type of roof structure should be introduced? A. RC deck roof C. Steel deck roof B. Low-slope metal roofing on space frame —_D. Steep gable roof 113. Project No. 4. Assuming a hillside location for the Project Site, what type of building projection should NOT be introduced? ae ‘A. 1.2 meter deep balconies C. 2.4 meter deep canopy B. 2.4 meter deep eaves D. 0.3 meter deep sun-breakers 114, Project No. 4. Assuming a hilltop location for the Project Site, what should be introduces to protect the building? ‘Pe oF bulking projections ‘A. 3.6 meter deep cantilevered canopy C. 0.6 meter deep eaves B. 1.2 meter deep balconies D. Windbreakers and sun-breakers _—_—_—_—— se Page 19 Situation 24 - Project No. 04 115. Project No. 4. In terms of acoustics, which material is NOT good for use as cladding, wall or partition for very crowded, low-cellinged and nolsy spaces? ‘A. Wood or wood substitutes C. Metal with textured surface B. Texture-painted masonry D. Smooth glass 116. Project No. 4. Under the NBCP, what are the maximum riser and tread dimensions (in meters) of a stairway? A, 0.15 and 03 C. 0.17 and 0.27 B. 0.2 and 0.28 D. 0.2 and 0.25 117. Project No. 4. Under the NBCP, what is the maximum width (in meters) of an exit door leaf? A 12 c 1s B24 Dd. 18 118. Project No. 4. How many whole units of 0.61 meter (m) x 1.22 m acoustical ceiling boards are required for a conference room with dear measurements of 4.0 m (width parallel to hallway and adding) x 6.1 m (depth)? Please note that there are 6 light troffers also measuring 0.61m x 1.22m for the room and its line of lighting Is perpendicular to the cladding. A. 26 c. 24 8. 22 D. 28 119. Project No. 4, How much tee runner angle section (in linear meters) is required for the same 4.0m x 6.1m conference room? A. 19.2 C. 20.2 B, 21.2 D. 22.2 Situation 25 - Project No. 5 120. Project No. 5. Under the 2004 Revised IRR of P.D. no. 1096 or NBCP, what shall be the maximum allowable percentage of site occupancy (PSO) for the Project (if without firewall)? ‘A, 80% of TLA C. 70% of TLA B, 90% of TLA D. 75% of TLA 121, Project No. 5. Under the NBCP, what is the prescribed minimum front setback (in meters) for the Project Site? A 6 ce BS D3 122, Project No. 5. Under the NBCP, what is the prescribed minimum side setback (in meters) for the Project Site? A 6 crs BS D8 123, Project No. 5. Under the NBCP, what is the prescribed minimum rear setback (in meters) for the Project Site? AB 3 8.6 D5 124, Project No. 5. Under the NBCP, what should be the maximum dimensions and footprint for the ‘proposed building, assuming only one (1) structure is erected? ‘A. 64m x 109m = 6,796 sqm C. 67m x 115m = 7,705 sqm B. 70m x 112m = 7,840 sqm D. 65m x 107m = 6,955 sqm Situation 26 - Project No. 5 125, Project No. 5. What Is the approximate lot depth (in meters) of the Project Site? A us C145 B. 135 D. 125 127, Project No. 5. At a four percent (4.0%) slope, what is the difference in elevation (In meters) ‘between the front and rear portions of the Project Site? A 5.0 c. 65 B35 D. 80 128. Project No. 5. What is the maximum number of adult persons who can walk side by side on the 2.4 meter wide sidewalk fronting the Project Site? AG C2 BS D6 129, Project No. 5. Which Is a basic part of the road right-of-way (RROW) and immediately outside the Project Site? A. Curb C. Canopy B. Front Yard D. Perimeter 130.” Project No. 5. Where on the Project Site is the best location for the loading dock? A. North yard ? C. West yard B. South yard D. East yard Situation 27 - PROJECT NO. 5 131. __Profect No. 5, Which of the folowing is NOT considered an amenity provision for the Project? ‘A. executive lounge CC. gameroom for workers B. worker's union office , video conference room 132, Project No. 5. Which of the following is NOT considered a service provision forthe Project? ‘A. Gym for all staff CC. Concessionaire-operated cafeteria, B Business center for cents D. Gameroom for workers 133. Project No. 5, Which of the following is NOT considered a service provision for the Project? 'A. Workshop and carpentry room. Security office B. Mall room D. Overhead water tank 134, Project No. 5. Which of the following is NOT considered a utilty provision for the Project? A. Qstern . Covered parking B. Generator room D. Sewage treatment plant (STP) ———— Pag TECTURAL DESIGN AND BITE FLAN Project No.5. Which ofthe following sets of spaces should NOT be stuated close to each ober? ‘A. Security staff quarters, locker and shower B, Solid waste holding area and sewage treatment plant . Elevators, service stairs and fire escapes ©. Covered parking slots, driveways, ramps etc. Situation 28 ~ Project No. 5 136, Project No. 5. Which Is NOT generally considered a Green Architecture concern? A. Building energy consumption 8. Rainwater harvesting, if applicable C. Lowering the building carbon footprint . Relocation of informal settlers on the Project Site, if any 137, Project No.5. In terms of construction material production, which ofthe following flooring materials Is considered to have the lowest carbon footprint? A. Vigan tiles . High-pressure laminate flooring B. Mariwasa tiles D. Baguio stone 138. Project No. 5. In terms of production, transportation and instalation, ‘materials is considered to have the highest embodied energy? 'A. Recycled cardboard egg crate _C. Cement bonded board (CBB) B. Polycarbonate sheet . Gypsum board 139. Project No. 5. If the executive offices on the 5® floor are to be air-conditioned, what shall be the Petru dstance (In meter) between the ished flor line (FFL) and the finished ceting ine (FCL), as provided for under the NBCP? © 270 ©. 2.10 at the 4” floor are NOT to be air-conditioned, what shall be the 140. Project No. 5. If the staff offices Prokenum distance (in meters) between the FF and the FC, as provided for under the NCP? which of the following ceiling A. 240 B. 3.00 A. 3.00 c. 2.40 D. 2.70 B. 2.10 Situation 29 - Project No. 5 What is the nominal thickness (In meters) of an exterior CHB wall, excluding 141. Project No. 5. plaster? A. 0.10 © 0.25 8. 0.20 D. 0.15 142, Project No. 5. What the nominal thickness (in meters) ofan interior CHB wall excluding plaster? A. 0.25 © 045 B. 0.10 D. 0.20 1s, Project No.5. Assuming near coastal cation forthe Project Ste, what type of roof structure should be ‘A. Metal roofing on space frame C._Composible deck roof B. RC deck roof D. Steel deck roof 144, Project No. 5. Assuming a lakeside location for the Project Site, what type of building projections should NOT be introduced? A. 3.0 meter deep eaves C. 0.3 meter deep sun-breakers B, 1.5 meter deep balconies D. 1.8 meter deep canopy 145. Project No. 5. Assuming a hilltop location for the Projec t Site, what type of building projections should be introduced to protect the building? ‘A. 0.9 meter deep balconies C. 1,2 meter deep canopy B. Windbreakers and sun-breakers _D. 0.6 meter deep eaves Situation 30 — Project No. 05 146. Project No. 5. Which of the following is @ good lighting device for a watercolor painting on the wall of the walting area of the president's office? AL CL C. Low-wattage track light 8. High-heat halogen lamps . High-output spot lamp 147. Project No. 5. Which of the following Is a good task lighting color ([.e. the shade of the emitted artificial light), for drawing, reading and writing purposed? ‘A. Warm white C. Yellow B. Cool white D. Daylight 148. Project No. 5. Which of the following is a good general lighting color (\.e. the shade of the emitted artificial light), for work areas? ‘A. Warm white C. Daylight B. Cool white D. Yellow 149. Project No. 5. Which of the following Is a good lighting technique for emphasizing a curved ceiling, if introduced at the lobby? |A. Use of pendant lighting B. Indirect lighting at the base of the curved ceiling C. Direct lighting of the curved celling using spotlights. D. Down-lighting from the ceiling using halogen lamps 150. Project No. 5. Which of the following is a good lighting device for a general production area with the ceiling consisting of the soffit of a suspended slab? ‘A. Troffer lighting (fluorescent lamps with soffit-mounted light boxes and diffusers) B. Industrial lighting (suspended fluorescent lamps with reflectors) CC. Pendant lighting (suspended CFLs with housing) . Pendant lighting (suspended incandescent lamps) Page 23

You might also like