SPECIFICATION NO.

: C-00406-S248-3 SCHEDULE- 8
Page 1 of 5

SUB-STATION PACKAGE
FOR
220/20 KV CHARIKAR (NEW) AND 220/20KV DOSHI (NEW) SUB-STATION ASSOCIATED WITH
CONSULTANCY SERVICES FOR MEW, AFGHANISTAN

(Price Adjustment Data)


Bidder's Name & Address: To, Power Grid Corporation of India Ltd.
Saudamini, Plot No.2,
Sector-29, (near IFFCO Chowk)
Gurgaon, Haryana - 122 001

We hereby furnish the relevant details pertaining to the price adjustment provisions in your
specifications and documents. The necessary documentary evidence are enclosed:

Sl. Name of Materials Value of Name of the published Value of index


No. co- index as 30 days prior
efficient to date set for
opening of bids
1 2 3 4 5

A-1 Transformer (excluding


transformer Oil)
i) C=Price of Copper Wire Bars, in 0.25 IEEMA
Rupees per MT
ii) ES=Price of CRGO Electrical Steel 0.30 IEEMA
Sheets: C&F Price converted into
Indian Rupees per MT
iii) IS(Iron & Steel): Wholesale Price 0.07 IEEMA
Index Number for ‘Iron & Steel’
(Base- 1993-94=100)
iv) IM (Insulating Materials): Price of 0.08 IEEMA
Insulating materials
v) L: All India average consumer price 0.15 Labour Bureau, Shimla,
index, for Industrial Workers (base Govt. of India and
1982 = 100) circulated by IEEMA
A-2 Transformer Oil
i) TB: Price of Transformer Oil 0.85 IEEMA
supplied in drums conforming to
IS:335-1993
B. Circuit Breaker
a) Raw Materials
i) a=
ii) b=
iii) c=
iv) d=
b) l=Labour Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
The sum of the value of coefficients for raw materials : a+b+c+d=0.55 to 0.65 and sum of all
the coefficients including labour shall be a+b+c+d+l=0.85.
SPECIFICATION NO.: C-00406-S248-3 SCHEDULE- 8
Page 2 of 5

Sl. Name of Materials Value of Name of the published Value of index


No. co- index as 30 days prior
efficient to date set for
opening of bids
1 2 3 4 5

C. L.T. Transformer
a) Raw Materials
i)C=Price of Copper Wire Bar 0.23 IEEMA
ii)ES=Price of Electrical Steel Sheets 0.26 IEEMA
iii)IS=Wholesale Price Index Number 0.08 IEEMA
for ‘Iron & Steel’
iv) IM=Price of Insulating materials 0.05 IEEMA
v) TB=Price of Transformer Oil Base 0.11 IEEMA
Stock (TOBS)
b) l =Labour 0.12 Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
D. Current Transformer
a) Raw Materials
i) a=
ii) b=
iii) c=
iv) d=
b) l=Labour Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA

The sum of the value of coefficients for raw materials : a+b+c+d=0.55 to 0.65 and sum of all
the coefficients including labour shall be a+b+c+d+l=0.85.

E. Capacitive Voltage Transformer


a) Raw Materials
i) a=
ii) b=
iii) c=
iv) d=
b) l=Labour Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
The sum of the value of coefficients for raw materials : a+b+c+d=0.55 to 0.65 and sum of all
the coefficients including labour shall be a+b+c+d+l=0.85.

F. Isolator
a) Raw Materials
i) a=
ii) b=
iii) c=
SPECIFICATION NO.: C-00406-S248-3 SCHEDULE- 8
Page 3 of 5

Sl. Name of Materials Value of Name of the published Value of index


No. co- index as 30 days prior
efficient to date set for
opening of bids
1 2 3 4 5
iv) d=
b) l=Labour Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
The sum of the value of coefficients for raw materials : a+b+c+d=0.55 to 0.65 and sum of all
the coefficients including labour shall be a+b+c+d+l=0.85.

G. Surge Arrester
a) Raw Materials
i) a=
ii) b=
iii) c=
iv) d=
b) l=Labour Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
The sum of the value of coefficients for raw materials : a+b+c+d=0.55 to 0.65 and sum of all
the coefficients including labour shall be a+b+c+d+l=0.85.

H. 1.1 kV PVC/XLPE Insulated Power and Control Cables

a) a=PVC/XPLE Compound 0.15

b) Published price of Metal


i) Aluminium per MT
ii) Copper per MT
c) Weight in MT of Metal per kM (size
wise)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

I. 20 & 15 kV XLPE HT Cable

a) a=PVC/XPLE Compound 0.15

b) Published price of Metal


i) Aluminium per MT
ii) Copper per MT
SPECIFICATION NO.: C-00406-S248-3 SCHEDULE- 8
Page 4 of 5

Sl. Name of Materials Value of Name of the published Value of index


No. co- index as 30 days prior
efficient to date set for
opening of bids
1 2 3 4 5
c) Weight in MT of Metal per kM (size
wise)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

J. Substation Structures
I) Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers &
foundation bolts)
a) Raw Materials
i) a= Structural steel 0.58
ii) b= Electrolytic Zinc 0.16
b) l= Labour 0.11 Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA

K. For Erection Price Component


Erection Price component (including Civil works but excluding ‘supply & placement of
K.1
reinforcement steel’ and ‘concreting’)
a) l= Labour 0.80 Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
K.2 Supply and placement of reinforcement steel
a) Diesel Oil 0.10 IOC Circular
b) Labour 0.05 Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
c) Mild Steel 0.65 Wholesale price in
India for Iron & Steel as
published by Reserve
Bank of India Bulletin
K.3 Concreting
a) Diesel Oil 0.20 IOC Circular
b) Labour 0.10 Labour Bureau, Shimla,
Govt. of India and
circulated by IEEMA
SPECIFICATION NO.: C-00406-S248-3 SCHEDULE- 8
Page 5 of 5

Sl. Name of Materials Value of Name of the published Value of index


No. co- index as 30 days prior
efficient to date set for
opening of bids
1 2 3 4 5
c) Cement 0.30 Wholesale price in
India for cement as
published by Reserve
Bank of India Bulletin
d) Non-metallic mineral products 0.20 Wholesale price in
(structural clay products) India for ‘Non-metallic
mineral products
(structural clay
products)’as published
by Reserve Bank of
India Bulletin

Date : (Signature) ..................................................

Place : (Printed Name) ............................................

(Designation) .............................................

(Common Seal) ...........................................