Professional Documents
Culture Documents
Operation Procedure:
1. Inspect the setup of the computer. Be sure that the area is
dry and no spilt liquid nearby.
2. Check the stability of the computer and keyboard.
3. Check power cords and cables. Check connections.
4. Wipe dust and remove unnecessary objects that will obstruct
the use of the computer.
5. Turn on AVR/UPS and then turn on the computer.
6. Use the computer properly. Avoid downloading from
unrecognized/unsafe sites.
7. Before using external hard or flash discs, scan and clean.
After using, be sure to close the document/program and
eject it.
8. Properly shut down the computer when not in use.
9. Turn off the AVR/UPS after shutting down the computer.
10. Return the mouse and keyboard to their proper place after
use.
11. To protect the desktop computer, cover it (if available).
HOUSEKEEPING SCHEDULE
Qualification Events Management Station/Bld Practical
Services NCIII g Work Station
Area/Section Practical Work Area
In-Charge Chris Timothy Llagas
Schedule for the 2nd Semester,
Responsible
2019
15 Every
Person
other Every
Remarks
Monthly
Weekly
ACTIVITIES
Daily
th
Day
1. Clean and arrange Alisis, Marcus
working tables M.
according to floor
plan/lay-out; check Angcaco, Cris X
stability Jan V.
Betuel,
Harold Mar
2.Clean and check floor, Ferciano,
walls, windows, Mariano
ceilings
a. dust/rust Perez,
b. paper Geronimo L. X
Pinohermoso,
John
Christian M.
3. Clean and check work Rivera,
shop ventilation and Janjan C.
illumination by dusting
lamps/bulbs, replacing Aceveda, X
non-functional lamps Shanilou
and keeping exhaust
clean Acosta, Ma.
Kristine
4. Clean and check Adora, Mary
computer set -monitor, Grace
CPU, keyboards, mouse
– free, unnecessary Aguilar, Florie
X
markings, dust; cables Ann
and plugs are in order; Alota,
well-arranged; all Christine
items functional
5. Clean, inspect air Arces, Criszha
conditioning Mhay
equipment:
a. keep screen and Austria,
filter free from Vanessa
dust/rust Bae, Christine X
b. Check selector
knobs if in normal
positions and are
functional
c. Check if drainage
is OK
6.Clean, check and Baja, Arlene
maintain Tool Room X
a. Logbook and Bengue,
forms are Jerica
complete, in
order and
updated
b. Lights ventilation –
Ok
c. Fire Extinguisher
d. Medicine Kit
7. Clean and check Caraig, Meryl
Rest Room Joy
a. Urinals, bowls,
wash basins, Casanova,
walls and Dessire
partitions are free
from stains, dirt,
oils, graffiti and
unnecessary
objects;
b. Ceilings free from
cobwebs and
dangling items
c. Floor is kept
dry; no broken
tiles or
protruding
objects
d. Equipped with X
dipper and pails;
properly located
after use
e. Water systems
is functional:
no
dripping/dama
ged faucets or
pipes
f. Drainage
system is
working, no
water- clogged
areas
g. No offensive odor
h. Lights
/Ventilation –
OK
8.Clean and check X
Coz, Joyce
wash area: Ann
• Walls/Floors- –free
from oils, molds, Dela Rosa,
broken tiles, gums, Rose Ann
stains or graffiti
• Drainage system is
functional
• Water system
functional; no
dripping faucets or
leaking pipes
• Free from unnecessary
objects (mops, rags)
9.Clean and maintain Dimaranan,
work shop Alliah
surroundings by
sweeping/ removing Dizon,
X
fallen leaves, branches, Angelika
debris and other refuse,
impounded water,
clearing pathways of
obstructions
10. Disposal of Elmenzon,
waste materials Sarah
(Follow waste segregation X
system) Falceso,
Lovely Karen
MANPOWER
th
Other Every
Weekly
Monthly
DayEvery 15
Daily
ACTIVITIES
Remarks
1. Inspect the
Trainer Trainees
setup of the
computer. X
Area is dry
No split Trainer TraineesTrainer Trainees
2. Check the
stability of the
computer X
Keyboard
Cable wire
3. Secure your old
files X
Previous week
Previous month
4. Clean up your:
Trainer Trainees TrainerTrainees
Software and
Hardware X
OS
Prepared by:
Approved by:
Noted by:
DR. EDITHA MISSION
Principal