You are on page 1of 2

HOUSEKEEPING SCHEDULE

Events Management Services NC


Qualification Station/Bldg BLDG.14
III
Area/Section Practical Work Area

In-Charge Riley Aadson

Schedule for the 2nd Semester, 2014


Responsible
ACTIVITIES Daily Every Weekly Every Monthly Remarks
Person other 15th
Day Day


1. Sweep floors; if wet, wipe Trainees/
dry. Janitors (in
the absence of
trainee


2. Clean and arrange Trainees/
working tables according Janitors (in
to floor plan. the absence of
trainee


3. Wipe and clean Trainees/
whiteboards/black board Janitors (in
the absence of
trainee


4. Clean and check computer Trainees/
set-monitor, CPU, Janitors (in
keyboards, mouse, the absence of
unnecessary markings, trainee
dust; cables and plugs
are in order; well-
arranged; all items
functional.


5. Clean and check Rest Trainees/
Room. Janitors (in
the absence of
trainee
 Urinals, bowls,
wash basins, walls
and partitions are
free from dirt, oils,
graffiti, and
unnecessary
objects.
 Ceilings free from
cobwebs and
dangling items
 Kept the floor dry,
no broken tiles or
protruding objects.
 Equipped with
dipper and pails;
properly located
after use.
 Water system
functional; no
dripping/damaged
faucets or pipes
 Drainage system is
working, no clogged
water areas
 No offensive odor
 Lights/Ventilation -
OK


6.Clean and check workshop Janitor
ventilation and
illumination by dusting
lamps/bulbs, replacing
non-functional lamps
and keeping exhaust
clean

7.Clean and maintain Trainees/
workshop surroundings Janitors (in
by sweeping/removing the absence of
fallen leaves, branches, trainee
debris, and other refuse,
impounded water,
clearing pathways of
obstruction.


8. Dispose of waste materials Trainees/
(follow waste segregation Janitors (in
system) the absence of
trainee


9. Clean posters, visual aids Trainees/
and update Trainer
accomplishment/Progres
s Charts


10. Empty water collector; Janitors
clean body of Water
Dispenser


11.Clean, inspect air Janitors
conditioning equipment.

 Keep screen and


filter free from
dust/rust


12. Clean, check and Trainees/
maintain Toolroom Janitors (in
the absence of
trainee
 Free from dust, not
damp.
 Tool’s inappropriate
positions/locations
 With visible labels/
signage
 Logbook and forms
are complete, in
order and updated

Approved by:

Greza O Bayona
Trainer

You might also like