You are on page 1of 2

HOUSEKEEPING SCHEDULE

Qualification EPAS NCII Station/Bldg EPAS BLDG

Area/Section PRACTICAL WORK AREA

In-Charge GLENN S. PATINDOL

Schedule for the 2nd Semester, 2014

ACTIVITIES Responsible Person th


Daily Every Weekly Every 15 Monthly Remarks

other Day Day

1. Clean and check electronic tools/ equipment Trainees/Janitors (in the Activity is done before
×
from dust and oil; dry and properly laid absence of trainees) and after using the

out/secured/ stable. equipment/Room.

2. Clean and checked print and non-print Trainees/Janitors (in the Activity is done after
×
materials absence of trainees) using the materials

3. Clean and arrange working booths, tables Trainees/Janitors (in the Activity is done before
×
according to floor plan/ lay- out; check absence of trainees) and after using the

stability. equipment

4. Store and check chemicals/ Trainees/Janitors (in the Activity is done before

absence of trainees) and after using the


solution and sealed properly.
equipment
×
•Used gloves to avoid contact with chemicals

5. Clean and check floor, windows and ceilings. Trainees/Janitors (in the Activity is done before
×
 graffiti/dust/ rust absence of trainees) and after using the

cobwebs and outdated/ room

unnecessary objects/items
 obstructions

 any used materials/ scraps(slugs,

stubs) spilled liquid


 open cracks (floor)

6. Clean and check work shop ventilation and Trainees/janitors (in the Activity is done before
×
illumination by dusting lamps/bulbs, replacing absence of trainees) and after using the

non- functional lamps and keeping exhaust room.

clean.

7. Clean and check LCD projector and screen, Trainees/Janitors (in the Activity is done before

computer set - monitor, CPU, keyboards, absence of trainees) and after using the

mouse – free, unnecessary markings, dust; × equipment

cables and plugs are in order; well- arranged;

all items functional

8. Clean, and inspect. Trainees/Janitors (in the Activity is done before

absence of trainees) and after using the


Air conditioning equipment
equipment: ×

 keep screen and filter free from

dust/rust.
 Check selector knobs.

if in normal positions and

are functional.
 Check if drainage is OK

Date Developed: Document No. NTTA-TM1-07

August 19, 2023 Issued by:


EPAS NCII
Date Revised: NTTA

Page 1 of 1
Developed by:
CASIFMAS
GLENN S. PATINDOL
Revision #
Trainees/Janitors (in the Activity is done before
9. Clean and inspect wash area and rest room
absence of trainees) and after using the

room.

 Check if drainage is OK

 Rust and stain

10. Dispose of waste materials Trainees/Janitors (in the Activity is done before

absence of trainees) and after using the

room.
×

Date Developed: Document No. NTTA-TM1-07

August 19, 2023 Issued by:


EPAS NCII
Date Revised: NTTA

Page 1 of 1
Developed by:
CASIFMAS
GLENN S. PATINDOL
Revision #

You might also like