You are on page 1of 4

Form No.

HOUSEKEEPING SCHEDULE

Qualification Computer systems Servicing

Area/section Practical Work Area

In-Charge
Schedule for the Month of 2nd Semester, 2023

Eve
Responsible
ACTIVITIES ry Every
Person Dail Wee Monthl
oth 15th Remarks
y kly y
er Day
day

1. Clean and check Trainee’s/ x


industrial Trainer/
equipment/electr Janitor (in
onic/accessories absence of
from dust and oil; trainee’s)
dry and properly
laid out

2. Clean and Trainee’s/ x


arrange work Trainer/
bench and chairs Janitor (in
according to floor absence of
layout; check trainee’s
stability

3. Clean and check Trainee’s/ x


floor, walls, Trainer/
windows, doors, Janitor (in
ceilings absence of
trainee’s)
 Obstruct
 Dust /rust
 Cobwebs
and
outdated
 Open
cracks
(floors,
ceilings,
walls)

Date Developed: Document No. NTTA-TM1-07


Trainers July 2010 Issued by:
Methodology Level I Date Revised:
February 2012
NTTA
Developed by: Page 1-14
Templates NTTA
Revision # 01
4. Clean and free Trainee’s/ x
workstations from Trainer/
dust/rust/gums, Janitor (in
and metal absence of
scrapper trainee’s)

5. Clean and check Trainee’s/ x


CPU and Trainer/
peripherals, free Janitor (in
from dust; absence of
computer monitor trainee’s)
cable and wires
are in order; all
items must
arranged and
functional

6. Clean and check Trainee’s/ x


replacing non- Trainer/
functional Janitor (in
lights/bulbs and absence of
keeping exhaust trainee’s)
clean/exhaust
fans and light
sources by
dusting
bulbs/ventilation

7. Clean and inspect Trainee’s/ x


air conditioning Trainer/
system: Janitor (in
absence of
 Check selector
trainee’s)
knobs for
functionality
 Keep screen
filter from
dust
 Check if
drainage is
functional

8. Clean, check and Trainee’s/ x


maintain Stock Trainer/
Room Janitor (in
absence of
 Tools in
trainee’s)
proper
location/po
sitions
 Logbook
Date Developed: Document No. NTTA-TM1-07
Trainers July 2010 Issued by:
Methodology Level I Date Revised:
February 2012
NTTA
Developed by: Page 1-14
Templates NTTA
Revision # 01
and
appropriat
e forms are
complete
and
accessible
 With
visible
signage
and
marking
 Check
ventilation
and
lighting

9. Clean and check Trainee’s/ x


Rest Room Trainer/
Janitor (in
 Ceilings
absence of
are free
trainee’s)
from
cobwebs
and
dangling
items
 Urinals,
bowls,
basin,
walls and
partitions
are free
from
stains, dirt
and
unnecessar
y items
 Equipped
with dipper
and water
buckets
 Floors are
kept dry;
no broken
tiles and
free from
obstruction
s
 Lights and
Date Developed: Document No. NTTA-TM1-07
Trainers July 2010 Issued by:
Methodology Level I Date Revised:
February 2012
NTTA
Developed by: Page 1-14
Templates NTTA
Revision # 01
ventilation
is working
properly
 Water
drainage
free from
logs
 No
offensive
smell/odor
 Water
system is
functional:
no dripping
faucets or
pipers

10.Clean and Trainee’s/ x


maintain workshop Trainer/
area and Janitor (in
surrounding by absence of
sweeping/ trainee’s)
removing debris
and other refuse,
impounded water,
clearing pathway
from obstruction

11.Disposal of waste Trainee’s/ x


materials (follow Trainer/
waste segregation Janitor (in
system absence of
trainee’s)
To be included:
 Training equipment
 LCD projector
 Audio visual
 Computer set
 Air conditioning
 Water dispenser
 Support equipment
 Fax machine
 Photo copier

Date Developed: Document No. NTTA-TM1-07


Trainers July 2010 Issued by:
Methodology Level I Date Revised:
February 2012
NTTA
Developed by: Page 1-14
Templates NTTA
Revision # 01

You might also like