Professional Documents
Culture Documents
5. Substructure Design
1
4 /1 9 /2 0 1 9
2
4 /1 9 /2 0 1 9
Back
wall
Wi n g
Wall
Abutment
H a mme r
he a d p i e r
3
4 /1 9 /2 0 1 9
4
4 /1 9 /2 0 1 9
5
4 /1 9 /2 0 1 9
6
4 /1 9 /2 0 1 9
7
4 /1 9 /2 0 1 9
8
4 /1 9 /2 0 1 9
9
4 /1 9 /2 0 1 9
10
10
4 /1 9 /2 0 1 9
11
11
4 /1 9 /2 0 1 9
12
12
4 /1 9 /2 0 1 9
13
4 /1 9 /2 0 1 9
14
4 /1 9 /2 0 1 9
15
4 /1 9 /2 0 1 9
16
4 /1 9 /2 0 1 9
17
4 /1 9 /2 0 1 9
18
4 /1 9 /2 0 1 9
19
19
4 /1 9 /2 0 1 9
20
20
4 /1 9 /2 0 1 9
21
21
4 /1 9 /2 0 1 9
22
22
4 /1 9 /2 0 1 9
23
23
4 /1 9 /2 0 1 9
24
24
4 /1 9 /2 0 1 9
25
25
4 /1 9 /2 0 1 9
26
26
4 /1 9 /2 0 1 9
27
27
4 /1 9 /2 0 1 9
28
28
4 /1 9 /2 0 1 9
29
4 /1 9 /2 0 1 9
6. Stability Check
• Location of resultant force
• Bearing pressure check
• Stabilty against sliding
• Design of footing:- check depth for wide beam
shear, flexure design
30
4 /1 9 /2 0 1 9
-----//-----
31