You are on page 1of 1

C B A A B C A B C

RAIN RAIN RAIN RAIN


WATER WATER WATER WATER
TANK 2 TANK 1 TANK 1 TANK 2

2 RIGHT SIDE ELEVATION 3 LEFT SIDE ELEVATION 4 CROSS SECTION


SCALE 1:100 M. SCALE 1:100 M. SCALE 1:100 M.
A-5 A-5 A-5

13 12 11 10 9 8 7 6 5 4 3 2 1

1 REAR ELEVATION
SCALE 1:100 M.
A-5

REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS
ARMAN U. CUEVAS PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD 11
STANDARD FOUR-STOREY REAR ELEVATION, RIGHT SIDE & LEFT SIDE
ARCHITECTURAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING ELEVATION, CROSS SECTION A-5
POSITION: ARCHITECT 64
PRC No.: 0018676 TIN No.: 907-359-364 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 20-CLASSROOMS )
PTR No.: 8941423 BUILDING DIVISION, BOD (REVISED 3-24-17)