You are on page 1of 1

The Institution of Engineers, Malaysia

Bangunan Ingenieur, Lots 60/62, Jalan 52/4, Peti Surat 223 (Jalan Sultan), 46720 Petaling Jaya, Selangor Darul Ehsan
Tel : 03-79684001/2 Fax : 03-79577678 E-mail : sec@iem.org.my IEM Homepage: http://www.myiem.org.my

Technical Visit to MRT 2 Site – Sentul West Station


(Organised by the Geotechnical Engineering Technical Division)

Date/Day : 20th July 2017 (Thursday) BEM Approved CPD/PDP Hours: 3.0
Time : 8.15am – 1.30pm Ref. No: IEM17/HQ/271/V
Venue : Sentul West Station
Transport : Coach will be provided. Participants are to assemble at 8.15 a.m. at Bangunan Ingenieur,
Petaling Jaya. The coach will depart IEM at 8.30.m. sharp.

SYNOPSIS ITINERARY OF THE VISIT


Klang Valley Mass Rapid Transit (KVMRT) Project is a rail-based public
transport network, envisaged to radically improve and transform Kuala
Time Itinerary
Lumpur’s public transportation coverage and to propel the Greater Kuala 8.15 am Gathering and Registration at IEM
Lumpur into one of the top most liveable cities in the world. The second MRT Building
Line, the Sungai Buloh-Serdang-Putrajaya (SSP) Line will serve a corridor
8.45 am Group departure from IEM to site
with a population of around 3 million people stretching from Sungai Buloh to
Putrajaya and will include Sri Damansara, Kepong, Batu, Jalan Sultan Azlan 9.30 am Arrival of delegation at site office
Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri 9.30 am – 9.45 am Project Briefing
Kembangan and Cyberjaya. The 52.2km alignment, including13.5 km is
9.45am – 11.00am Site Visit: Scope of visit –
underground will have a total of 36 stations, 11 of which will be built
underground. At commencement of full service in the second quarter of Construction of Underground
2022, the SSP Line is expected to have a ridership of 529,000 passengers per MRT 2 Sentul West Station
day. This is expected to further improve the chronic traffic congestion 12.30 pm – 1.30 Back to IEM
currently faced by Kuala Lumpur. pm
FEES FOR REGISTRATION INFORMATION TO NOTE
The visit is strictly limited to 40 participants registered on a
Commitment fees (inclusive GST) “first-come first-served” basis.
(Non-refundable & non-transferable): All participants must prepare their own PPE (safety
Grade Fees helmet + safety vest + safety shoe) with valid CIDB green
IEM Member RM 50.00 card.
Interested participants are to register and pay online at
Non-IEM Member RM 80.00 www.myiem.org.my or register by returning the appended
registration form before 16th July 2017 together with the
GST is implemented The visit is strictly limited to payment.
effective 1 April 40 participants registered on a For Online Registration, only online payment is application [VIA RHB
2015 first-come-first-serve basis. AND MAYBANK2U-PERSONAL SAVING & PERSONAL CURRENT:
CREDIT CARD – VISA / MASTER CARD]
Cheques are to be made payable to The Institution of
PERSONAL DATA PROTECTION ACT Engineers, Malaysia.
I have read and understood the IEM’s Personal Data Protection Notice Please note that the commitment fee should be settled prior
published on IEM’s website at http://www.myiem.org.my and I agree to
IEM’s use and processing of my personal data as set out in the said notice. to the visit.
After this closing date, IEM reserves the right to allocate seats
on first come first pay basis.
Members are also reminded that IEM MAY cancel the
Ir. Lee Peir Tien reservation if payment is not received before the closing date.
Chairman – Geotechnical Engineering Technical Division, IEM

REPLY SLIP (E: nurul@iem.org.my)


Chairman, Geotechnical Engineering Technical Division, IEM

Technical Site Visit to MRT 2 Site – Sentul West Station


I wish to participate in the above visit on 20th July 2017. I enclosed herewith a cheque No ............................................ for the
amount of ........................................ as my commitment fee for the visit.
Name of Member : M’Ship No :
Company Name : NRIC :
Position : Email :
Address : Tel :
Mobile :
I will be participating in the visit at my own risk and hereby indemnify fully the IEM from all claims arising from any injury, damage or loss that may be sustained by me.

.................................................... ....................................................
Date Signature

You might also like