ABD AREA ABD AREA

SMART CITY URBAN FO R M–PEDESTRIAN ZONE U RBAN FORM–PE DEST RIAN ZONE
BACKGROUND OF SMART CITY MISSION RAJ WADA AREA AND SURROUNDINGS RAJWADA AREA AND S U RROUN DI NGS
Smart Cities Mission, sometimes referred to as Smart City Mission, is an urban
TRANSFORMATION TRAN SFORMATION
renewal and retrofitting program by the Government of India with the mission
to develop 100 smart cities across the country making them citizen friendly and
sustainable. The Union Ministry of Urban Development is responsible for
implementing the mission in collaboration with the state governments of the MAJOR SMART ROADS
respective cities. IN ABD AREA
WHAT IS SMART CITY? • 11 key roads oflength
The newly elected federal Government of India (GoI) launched the Smart Cities
10.7 km.
Mission (SCM) in 2015 with the stated purpose of improving the governance and
infrastructural deficiencies that plague Indian cities. The Mission categorically • Project cost –Rs.135
states that there is no one definition of a ‘smart city’ and implies infinite liberty for Crores
cities to self-define their understanding of ‘smartness’. • Cement concrete
On 7 September 2019, the 10,000-acre Aurangabad Industrial City (AURIC) Pavement-ROW 12-30MT
in Aurangabad, Maharashtra was inaugurated as the first greenfield industrial • RCC duct for electrical
smart city of India.
• cables and RCC
pipes for OFC on both
MAJOR ROADS IN ABD AREA WORK NEAR sides of the road
EARLIER SCENARIO SITE PREAPARATION COMPLETION • RCC medianwith
central LED smart lighting

TYPICAL SECTION OF THE ROAD SHOWING ALL THE UTILITY SERVICES

ABD AREA
SMART CITY INDORE • TOTAL AREA – 742 ACRE (1.1%)
• POPULATION – 1.25 LACS (5%)
NMV ZONE & MULTILEVEL PARKING
• P ROJECT COST– RS.1400 CR. `
NMV ROUTE LENGTH: 2.3 KM TOTAL
TOTAL PROJECT COST –Rs.5099CR.
PROPOSED MLP: 14 REQUIRED PARKING
PAN CITYAREA
SUBMITTED BY
RETROFITTING ABD AREA (CARS ):1000 KRITI SINGH
ABD REDEVELOPMENT on PPP-mode KIRAN YADAV
AREA PAN CITY A R EA – 276 SQ.KM.
PROPOSED PARKING (CARS ) : 1100 KAVITA VERMA
REQUIRED PARKING 2-WHEEL :3000 NITISH
• POPULATION – 25 LACS SHADAN KHAN
PROPOSED PARKING 2-WHEELER : 3500 KAMIL KHAN
• PROJECT COST – RS. 700 CR. FOR ICT
SOLUTIONS NAINSHREE
HERITAGE WALK RIVER FRONT DEVELOPMENT
• Park near Krishnapura Chhatri: 4000 sqm.
• Redevelopment of vegetable & fruit market (230 hawker shops & 135
fruit shops)
• Underground parking for 250 4-Wheeler & 800 2-Wheeler

CHANDRABHAGA BRIDGE

WORK IN PROGRESS

EXISTING PROPOSED

WORKINPROGRESS

CONSERVATION OF CHHATRIS
CONSERVATION OF KUND LANDSCAPING
MONUMENT LIGHTING

GOPAL MANDIR SITE PLAN RAJWADA

SUBMITTED BY
KRITI SINGH
KIRAN YADAV
KAVITA VERMA
NITISH
SHADAN KHAN
KAMIL KHAN
NAINSHREE
SMART HEALTH:
REDEVELOPMENT: MOG LINES AREA
ACTION ITEM STATUS
4 pockets isspread over
Assessment of
56.5acres. AS-IS situation completed

Workshop on
Mix Land use, TOD,High density,
completed
smart health
Smart features
Feasibility
completed
23 hectares / study
Total Land Area for Redevelopment
56.5 acres
Compensatory Housing. POC to be Last week of
FAR (incl
3.00 establish June by Dell
incentive for
rehabilitation & Yolo
/compensatio Health.
n)
DPR prepared for 1stLand Parcel. SMART POLE:
Total Built-up Area 6,30,000 sqm
Residential Built-up Area @ 70% 4,41,000 sqm • 5OO smart poles of height (12 m to 15m) with mobile micro towers, wifi
access points, surveillance camera, digital bill board, Environmental
Commercial Built-up Area @ 20% 1,26,000 sqm
Transfer of landto SPV in process sensor, etc.
Institutional Built-up Area @ 10% 63,000 sqm • 500 km OFC with 4 core for ISCDL
• Integration with central control and command centre.
SMART EDUCATION • O and M of the complete system for 15 years at no cost of ISCDL.
SCOPE OF WORK INCLUDES: • RFP in June last week (2nd call)
• HARDWARE AND NETWORK SETUP AND INSTALLATION
• DEVELOPMENT AND TRAINING
• SMART SOLUTION APPLICATION WITH ALL MODULES
SMART PBS INDORE
• SOFTWARE INSTALLATION
• MODULE DESIGN/ COURSE CONTENT • Planning and installation of cycles and stations
• PROGRAM DEVELOPMENT • Central control system
• Redistribution system
Five bids were received and opened on 20th June 2017.
• Depots / workshops for maintenance
• Registration of users
• Technical presentation scheduled for 28 June.
• Fare collection system
• Financial Bid opening 05 July. • User information system
• Advertisement space
• Award of contract by 12 July . GPS-BASED VEHICLE TRACKING & MONITORING SYSTEM
INFRASTRUCTURAL DEVELOPMENT OF GOVERNMENT SCHOOLS
(ABD AREA)
SCOPE OF WORK
• Rationalization of schools in proportion to the strength of students SUBMITTED BY
• Construction of additional classrooms KRITI SINGH
KIRAN YADAV
• Construction of toilet block KAVITA VERMA
• Electrical works NITISH
SHADAN KHAN
• Construction of new compound wall KAMIL KHAN
• Development of playground. NAINSHREE
INTRIGRATED SOIL WAST MANAGEMENT SYSTEM INDORE 311
The objective of ISWM project isto introduce analytical tools 311 Is the APP made for people of Indore to log their complain, to track about the project, traffic
for automated decision making to help in effective information, field inspection etc.
monitoring of solid waste management operations.

CITIZEN COMPLAINT COMPLAINT COMPLAINT


REGISTRATION CREATION SUBMISSION SUBMISSION

The project will be implemented in 6 months and


the Contractor will provideO & M Servicesfor 3
years.
SWM TRANSFER STATION WITH PORTABLE
COMPACTORS Technology
Cylindrical Designprevents COMPLAINT
COMPLAINT COMPLAINT COMPLAINT
corrosion and RESOLUTION
NOTIFICATION NOTIFICATION RESOLUTION
Hydraulic SOLAR POWER
Mounted
Compactors
Efficiency
Capacity –16/20CuM.

Cost of Plant -Rs.12Cr.


Expected Power
Generation
Approx.- 500 Units/hr
SUBMITTED BY
KRITI SINGH
KIRAN YADAV
2 MW Solar Power Plant at KAVITA VERMA
NITISH KUMAR
Sewerage Treatment Plant,
SHADAN KHAN
Indore KAMIL KHAN
NAINSHREE