You are on page 1of 4

Ministry of interior

General dept of dubai civil defence


DATE-14/06/19
Srno Location Description Qty
1 Head office chiller 4
chilled water pump 5
split unit 16
w ac 5
AHU 20
Fresh air unit 3
2 Al barshah chiller 1
chilled water pumps 2
Fresh air unit 1
CCU unit 2
split unit 6
Exhaust fan 1
Trane FCU unit 15
wac 2

Port saeed center

3 chiller 1

split unit 4

chilled water pumps 2


CCU unit 2

Fresh air unit* 1


4 Al manara chiller trane 1
chiller water pump 2
fresh air unit 1
split unit 4
5 Al masra chiller trane 1
chilled water pumps 2
fresh air unit 1
split unit 4
6 Dubai industrial center chiller 1
7 Al mezher chiller 1
8 Jebel ali industrial center chiller 1
Capacity/details site visit status Remarks
no

no

66 kw/2 compressor/fan cooled/6


fans/5 deg out /7.5 deg in/chilled working normaly/ set
water pressure in 3.5 bar/return point temp was revised
water pressure=3bar yess by john@site

All filters has


to be cleaned
as per site
report /all
cooling coils
has to be
no acess cleaned

2 nos/primary pumps/supply
pressure=3.5 bar/ suction pump
pressure=1.8 bar all seems good
no details

supply fan:0.94 m3/s, return air : This was not


0.99 m3/s/ motor power mensioned in
supply:1.5 kw/ motor power the previous
return;0.75 working normally one
no

no
no
no
no