Electrical Safety Program Level 1 Module A

  Assessment Feedback

You have successfully completed this training.


  Total score: 19  out of 20, 95%
  Question Feedback
  1 of 20
High voltage gloves should be used when performing work such as drilling out a
gland plate.
True
  False

1  out of  1
Correct
 
  2 of 20
When preparing to use a multi-meter for use on a voltage reading, what should you
remember?
Meter connects in series with equipment under test.
Evaluate the need for electrical safety PPE, for example will your hand break
the arc flash boundary while taking the measurement.
Ensure to turn off power if possible before connecting your probes.
 
Voltage range.
Meter connects in parallel with equipment under test.
Voltage type.

1  out of  1
Correct
 
  3 of 20
  You and your partner are required to take a live measurement on a piece of 480-volt
equipment in the test area. There are exposed live portions of the equipment in other
parts of the test area. You have three clients witnessing the test. As it will require
both of you to perform the measurements, what is the safest way to proceed?
Proceed with the measurements.
Contact your supervisor for a third qualified person to be your backup while you
and your partner are taking measurements.
Inform the clients of what you will be doing and have them gather around to
watch you and your partner.
None of the above.

1  out of  1
Correct
 
  4 of 20
High Voltage gloves must be tested at least every 6 months or when the integrity of
the gloves is suspected.
True
  False, only when there is a concern about the integrity of the gloves.

1  out of  1
Correct
 
  5 of 20
You are required to test a piece of equipment that you have never seen before. You
have been given a test procedure and after reviewing the procedure you have a
number of questions. How do you proceed?
Stop the job and get the questions answered by the engineer in charge of job.
  Refuse to do the test.
Energize the equipment and see what develops.

1  out of  1
Correct
 
  6 of 20
  During a load test of a piece of manufactured equipment that is operating at 480
volts, there are 2 clients representatives witnessing the test. There are exposed bus
bars on the equipment. What is the closest distance you should allow the 2 clients to
approach the equipment? The fault current is 25kA.
As clients, they can approach the limited approach boundary or the arc flash
boundary whichever is furthest away. In this case 3 feet, 6 inches from the
equipment, under direct supervision of a qualified person for each client.
As clients, they can approach the limited approach boundary or the arc flash
boundary whichever is furthest away. In this case 10 feet from the equipment,
which is within the prohibited approach boundary.
As clients they can approach as close as they desire to the energized equipment.
As clients they can approach 1 foot, 0 inches from the equipment, which is
within the restricted approach boundary.

1  out of  1
Correct
 
  7 of 20
The red flagging is up in a test area, and two workers are proceeding with a test on
energized equipment. You need to get a binder that is within the flagged area. To
get this binder:
Wait at the tapeline until one of them looks your way and then wave to get their
attention and he or she will give you permission to enter.
You know the two workers, yell out one of their names to get their attention and
 
ask for permission to enter to get your binder.
Just lift the tape up and go get your binder, as you won’t interfere in any way.
None of the above.

1  out of  1
Correct
 
  8 of 20
  What is the definition of Restricted Approach Boundary?
Closest distance of approach for an unqualified person without direct
supervision of a qualified person.
Closest distance of approach for an unqualified person to perform work on an
energized work on an energized conductor or circuit part.
Closest distance of approach for an unqualified person under the direct
supervision of a qualified person wearing appropriate PPE.
Closest distance of approach for two qualified workers to approach an energized
conductor or circuit part.

1  out of  1
Correct
 
  9 of 20
What is the definition of Limited Approach Boundary?
Closest distance of approach for two qualified workers to approach an exposed
energized conductor or circuit part.
Closest distance of approach for an unqualified person without direct
  supervision of a qualified person.
Closest distance of approach for an unqualified person under the direct
supervision of a qualified person.

1  out of  1
Correct
 
  10 of 20
You must wear an Approved Electrical Arc Shield and approved Rubber insulating
gloves: 
When performing electrical measurements on energized 600 volt equipment.
Whenever you feel like it.
 
When performing electrical measurements on a piece of 480 volt equipment that
has just been turned off.

0  out of  1
Incorrect
 
  11 of 20
You are going to work on a piece of equipment that is presently locked out and
tagged out. What steps should you follow:
Upon reading the Lockout Tag out information, you discover the Responsible
Person is not present, so you contact your supervisor.
Read the lockout tag out information to find out who is the Responsible Person
  and contact him/her before proceeding.
Equipment is locked out and tagged out by someone you trust so you can just
start to work on it.

1  out of  1
Correct
 
  12 of 20
Which of the following would best describe a Zero Energy State on a piece of
equipment?
A 480/277Y Electrical Panel that was energized, the 480-volt fused disconnect
supplying it turned off, visually inspected, safety grounds applied and tagged off.
A 208Y/120 Electrical Panel that was energized, the circuit breaker supplying
the panel turned off, locked & tagged off, the 208Y/120 Electrical Panel, tested for
absence of power and safety grounds applied.
 
A 480/ 208Y120 volt transformer that was energized, the 480 volt fused
disconnect supplying it turned off, visually inspected, locked and tagged off.
A 480/ 208Y120 volt transformer that was energized, the 480 volt fused
disconnect supplying it turned off, visually inspected, fuses removed, locked.

1  out of  1
Correct
 
  13 of 20
If there is a piece of equipment that you notice requires repair, you should:
Notify your Supervisor.
Return to the tool crib and get another one.
 
Return to the tool crib and tag out unit.

1  out of  1
Correct
 
  14 of 20
  Readings are required from an energized load filter operating at somewhere within
its rated voltage of 5 kV. The readings can only be taken within the arc blast
boundary. To obtain a current reading you will need the following PPE, training and
equipment:
ATL minimum PPE, SLB approved Arc shield, Fire retardant coveralls, High-
voltage rubber insulating gloves Class 1, Clip-on ammeter.
ATL minimum PPE, SLB approved Arc shield, Fire retardant coveralls, High-
voltage rubber insulating gloves Class 0, Clip-on ammeter.
ATL minimum PPE, SLB approved Arc shield, Clip-on ammeter.
ATL minimum PPE, SLB approved Arc shield, Fire retardant coveralls, Clip on
Ammeter.

1  out of  1
Correct
 
  15 of 20
When performing electrical work what type of coveralls are required?
No requirement
Anti-Static
  Polyester
Fire Retardant & Arc-rated

1  out of  1
Correct
 
  16 of 20
You are required to use Rubber Insulating gloves to perform a measurement. Before
using the gloves you must:
Ensure the gloves are the proper Class.
Check the Test Date to ensure that the gloves have been tested within the last 6
months.
  Inspect the leather protectors to ensure they are in good shape, no cuts, rips or
contamination.
Inspect the rubber gloves carefully for signs of wear, nicks, cuts or deterioration.
All of the above

1  out of  1
Correct
 
  17 of 20
  You are going to check the liquid levels on a generator set that has just been shut
down. What are some of the steps you should follow:
Open the radiator cap.
Ensure the remote start feature is de-activated.
Be aware of hot surfaces.
Check the radiator site glass if equipped.

1  out of  1
Correct
 
  18 of 20
An electrical panel requires the installation of a new circuit breaker. What is the
correct procedure to follow?
Remove panel cover, install the new breaker.
Identify the source of supply, turn it off, test for power, lock and tag it off,
remove the panel cover and install the breaker.
  Identify the source of supply, turn it off, test for power, remove the panel cover
and install the breaker.
Identify the source of supply, turn it off, test for power, lock and tag it off,
remove the panel cover, test for power and install the breaker.

1  out of  1
Correct
 
  19 of 20
A contractor is on site to repair the overhead cranes. They have informed us it will
take two days and the cranes should be locked out. What information must be on the
contractor’s lockout tag?
Reason for lockout.
Date and time applied.
  24 hr contact number.
Review Local Standard Procedure for LOTO beforehand for any other
requirements.

1  out of  1
Correct
 
  20 of 20
  While preparing to take voltage measurements on a piece of equipment where there
is a risk of an arc blast or electrocution, the following steps are preferred method:
Write a HARC, locate emergency shutdown, only use leads that keep your
hands outside the arc blast radius, apply leads, take measurement
Write a HARC, put on necessary PPE, shutdown appropriately, LOTO, Apply
leads, remove LOTO, start back up, take measurement
Write a HARC, put on necessary PPE, apply leads, take measurement

1  out of  1
Correct
 