You are on page 1of 1

Table 1

corresponding
Height Width Area Area final absorption
coefficient.

Room 1 α125 α500 α2000

Front wall (gypsum board on


2x6 metal stud)
3.00 3.94 11.82 11.82 0.26 0.05 0.04 3.07 0.59 0.47

Left wall (gypsum board on


2x6 metal stud) 3.00 5.51 16.53 16.53 0.26 0.05 0.05 4.30 0.83 0.83

Right wall (gypsum board on


2x6 metal stud) 3.00 3.94 11.82 9.84 0.26 0.05 0.06 2.56 0.49 0.59

Rear wall (gypsum board on


2x6 metal stud) 3.00 5.51 16.53 5.74 0.26 0.05 0.07 1.49 0.29 0.40

Right wall door (solid core


2.20 0.90 1.98 1.98 0.15 0.10 0.05 0.30 0.20 0.10
flush door)

Rear wall gazing 1.90 3.20 6.08 6.08 0.30 0.10 0.05 1.82 0.61 0.30

Ciling 3.94 5.51 21.71 21.70 0.34 0.53 0.73 7.38 11.50 15.84

Ground floor 3.94 5.51 21.71 21.70 0.56 0.79 0.86 12.15 17.14 18.66

Air 3.00 21.70 65.10 0.00 0.00 0.00 0.00 0.00 0.00

Total absorption 33.07 31.65 37.20

Tr 0.31 0.33 0.28

Optimum 0.78 0.69 0.60

Room 2

Front wall 3.00 3.50 10.50 10.50 0.26 0.05 0.04 2.73 0.53 0.42

Left wall 3.00 6.64 19.92 17.94 0.26 0.05 0.05 4.66 0.90 0.90

Right wall 3.00 6.64 19.92 19.92 0.26 0.05 0.06 5.18 1.00 1.20

Rear wall 3.00 3.50 10.50 4.04 0.26 0.05 0.07 1.05 0.20 0.28

Left wall door 2.20 0.90 1.98 1.98 0.15 0.10 0.05 0.30 0.20 0.10

Rear wall gazing 1.90 3.40 6.46 6.46 0.30 0.10 0.05 1.94 0.65 0.32

Ciling 3.50 6.64 23.24 23.24 0.34 0.53 0.73 7.90 12.32 16.97

Ground floor 3.50 6.64 23.24 23.24 0.56 0.79 0.86 13.01 18.36 19.99

Air (volume m3) 3.00 23.24 69.72 0.00 0.00 0.00 0.00 0.00 0.00

Total absorption 36.78 34.14 40.17

Tr (sec)= (0.16 V) / a 0.30 0.33 0.28

Optimum 0.6 (from graph) 0.78 0.69 0.60